Austin, Texas Impact Fees

Austin applies its own fee schedule. Travis County does not currently add county-level impact fees inside city limits. A new single-family home pays $20,216.96 per unit (rates sourced ). The full breakdown is below.

Austin Impact Fees by Project Type

Austin: Single-Family Impact Fees

A new single-family home in Austin pays $20,216.96 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Parkland Dedication Fee (City of Austin) — Low Density ($7,647.86), Water Impact Fee (City of Austin) — 5/8" PD meter ($4,800.00) and Street Impact Fee (City of Austin) — Outside Loop ($3,621.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Austin Impact Fee Schedule
Water$5,396.23
  • Water Impact Fee (City of Austin) — 5/8" PD meter
    City of Austin (Austin Water)
    City of Austin water impact fee, $4,800 per service unit for lots platted on or after October 1, 2023, charged by meter size; a 5/8 in. meter is 1 service unit. Lots platted earlier pay the schedule in force for their plat date. Tap and meter charges are separate.
    $4,800.00
  • Water Tap Fee (City of Austin) — 5/8" meter, City-installed
    5/8", City-installed
    City of Austin (Austin Water)
    Austin Water charge for a 5/8 in. water connection made by the City, plus the actual cost of the meter. A connection made by a contractor under City procedures pays the lower contractor-performed charge instead.
    $596.23
Sewer$3,551.87
  • Wastewater Impact Fee (City of Austin) — 5/8" PD meter
    City of Austin (Austin Water)
    City of Austin wastewater impact fee, $2,900 per service unit for lots platted on or after October 1, 2023, charged by water meter size; a 5/8 in. meter is 1 service unit. Lots platted earlier pay the schedule in force for their plat date. Connection charges are separate.
    $2,900.00
  • Wastewater Connection Fee (City of Austin) — Zone 3 West, City-installed
    City of Austin (Austin Water)
    Austin Water charge for a wastewater connection of 6 in. or less made by the City in its West zone, the highest of 3 zones (Central $570.69, East $490.55). Applies where the City makes the connection.
    $651.87
City$11,268.86
  • Parkland Dedication Fee (City of Austin) — Low Density
    City of Austin
    City of Austin parkland dedication fee for single-family lots in a subdivision under 6 units per acre: $5,940.76 fee in lieu of land plus $1,707.10 park development fee per unit. Rates are reset each October 1 and apply as of application submittal; land dedication can replace part of the fee.
    $7,647.86
  • Street Impact Fee (City of Austin) — Outside Loop
    City of Austin
    City of Austin street impact fee for a single-family home outside the SH 71, US 183 and Loop 360 loop, the higher of 2 rate areas (inside the loop $2,439.50). Assessed at plat and collected at building permit. Qualifying affordable housing and redevelopment adding fewer than 10 peak-hour trips are exempt; transportation demand reductions can lower it.
    $3,621.00
County$0.00
  • County Impact Fees (Travis County)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Austin): $20,216.96
Sources last checked Official fee schedules:City of Austin (Austin Water) City of Austin Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Austin: Multifamily Impact Fees

A new multifamily unit in Austin pays $15,357.39 per unit in impact fees (rates sourced November 24, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Parkland Dedication Fee (City of Austin, MF) — Urban ($4,802.79), Water Impact Fee (City of Austin, MF) — 5/8" PD meter ($4,800.00) and Wastewater Impact Fee (City of Austin, MF) — 5/8" PD meter ($2,900.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Austin Impact Fee Schedule
Water$5,396.23
Sewer$3,551.87
City$6,409.29
  • Parkland Dedication Fee (City of Austin, MF) — Urban
    City of Austin
    City of Austin parkland dedication fee per multifamily unit in the Urban area, the highest of 3 geographic areas (Suburban $2,613.66, Central Business District $2,493.20). Set each year under the state HB 1526 formula; land dedication can replace part of the fee.
    $4,802.79
  • Street Impact Fee (City of Austin, MF) — Outside Loop
    City of Austin
    City of Austin street impact fee per mid-rise apartment or condo unit (3 to 10 stories) outside the SH 71, US 183 and Loop 360 loop, the higher of 2 rate areas (inside the loop $1,088). Collected at building permit; qualifying affordable units are exempt.
    $1,606.50
County$0.00
  • County Impact Fees (Travis County, MF)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Austin): $15,357.39
Sources last checked Official fee schedules:City of Austin (Austin Water) City of Austin Travis County

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Austin: Commercial Impact Fees

Commercial development in Austin pays $9.70 per square foot in impact fees, plus $20,608.27 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 50,000 sq ft building, that comes to about $505,393.27. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU ($12,000.00 one-time), Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Tap Fee (City of Austin) — 1" meter, City-installed ($706.40 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Austin Impact Fee Schedule
Water$12,706.40 one-time
  • Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU
    City of Austin (Austin Water)
    City of Austin water capital recovery (impact) fee for a 1 in. meter (2.5 service units at $4,800) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Tap and meter fees are charged separately.
    $12,000.00 one-time
  • Water Tap Fee (City of Austin) — 1" meter, City-installed
    1", City-installed
    City of Austin (Austin Water)
    Austin Water charge for a 1 in. water connection made by the City, plus the actual cost of the meter (fee schedule effective October 1, 2026). A connection made by a contractor under City procedures pays the lower contractor-performed charge instead; City connections larger than 2 in. are billed at cost.
    $706.40 one-time
Sewer$7,901.87 one-time
  • Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU
    City of Austin (Austin Water)
    City of Austin wastewater capital recovery (impact) fee for a 1 in. water meter (2.5 service units at $2,900) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Connection fees are charged separately.
    $7,250.00 one-time
  • Wastewater Connection Fee (City of Austin) — Zone 3 West, City-installed
    City of Austin (Austin Water)
    Austin Water charge for a wastewater connection of 6 in. or less made by the City in its West zone, the highest of 3 zones (Central $570.69, East $490.55), effective October 1, 2026. Larger connections, and any manhole a commercial building over 4,000 sq ft needs, are billed at cost.
    $651.87 one-time
City$9.70/sq ft
County$0.00
  • County Impact Fees (Travis County, Commercial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Austin): $9.70/sq ft + $20,608.27 one-time (≈ $505,393.27 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Austin (Austin Water) City of Austin Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Austin: Industrial Impact Fees

Industrial development in Austin pays $4.59 per square foot in impact fees, plus $20,608.27 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 50,000 sq ft building, that comes to about $250,243.27. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU ($12,000.00 one-time), Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Tap Fee (City of Austin) — 1" meter, City-installed ($706.40 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Austin Impact Fee Schedule
Water$12,706.40 one-time
  • Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU
    City of Austin (Austin Water)
    City of Austin water capital recovery (impact) fee for a 1 in. meter (2.5 service units at $4,800) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Tap and meter fees are charged separately.
    $12,000.00 one-time
  • Water Tap Fee (City of Austin) — 1" meter, City-installed
    1", City-installed
    City of Austin (Austin Water)
    Austin Water charge for a 1 in. water connection made by the City, plus the actual cost of the meter (fee schedule effective October 1, 2026). A connection made by a contractor under City procedures pays the lower contractor-performed charge instead; City connections larger than 2 in. are billed at cost.
    $706.40 one-time
Sewer$7,901.87 one-time
  • Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU
    City of Austin (Austin Water)
    City of Austin wastewater capital recovery (impact) fee for a 1 in. water meter (2.5 service units at $2,900) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Connection fees are charged separately.
    $7,250.00 one-time
  • Wastewater Connection Fee (City of Austin) — Zone 3 West, City-installed
    City of Austin (Austin Water)
    Austin Water charge for a wastewater connection of 6 in. or less made by the City in its West zone, the highest of 3 zones (Central $570.69, East $490.55), effective October 1, 2026. Larger connections, and any manhole a commercial building over 4,000 sq ft needs, are billed at cost.
    $651.87 one-time
City$4.59/sq ft
County$0.00
  • County Impact Fees (Travis County, Industrial)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Austin): $4.59/sq ft + $20,608.27 one-time (≈ $250,243.27 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Austin (Austin Water) City of Austin Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Austin: Office Impact Fees

Office development in Austin pays $5.19 per square foot in impact fees, plus $20,608.27 in one-time water and sewer connection fees (rates sourced November 24, 2026).

For a 25,000 sq ft building, that comes to about $150,309.52. The calculator below adjusts to your exact square footage.

The largest line items are Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU ($12,000.00 one-time), Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU ($7,250.00 one-time) and Water Tap Fee (City of Austin) — 1" meter, City-installed ($706.40 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Austin Impact Fee Schedule
Water$12,706.40 one-time
  • Water Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $4,800/SU
    City of Austin (Austin Water)
    City of Austin water capital recovery (impact) fee for a 1 in. meter (2.5 service units at $4,800) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Tap and meter fees are charged separately.
    $12,000.00 one-time
  • Water Tap Fee (City of Austin) — 1" meter, City-installed
    1", City-installed
    City of Austin (Austin Water)
    Austin Water charge for a 1 in. water connection made by the City, plus the actual cost of the meter (fee schedule effective October 1, 2026). A connection made by a contractor under City procedures pays the lower contractor-performed charge instead; City connections larger than 2 in. are billed at cost.
    $706.40 one-time
Sewer$7,901.87 one-time
  • Wastewater Capital Recovery Fee (City of Austin) — 1" meter, 2.5 SU × $2,900/SU
    City of Austin (Austin Water)
    City of Austin wastewater capital recovery (impact) fee for a 1 in. water meter (2.5 service units at $2,900) on lots platted after October 1, 2023; lots platted earlier pay the schedule in force at their plat date. Connection fees are charged separately.
    $7,250.00 one-time
  • Wastewater Connection Fee (City of Austin) — Zone 3 West, City-installed
    City of Austin (Austin Water)
    Austin Water charge for a wastewater connection of 6 in. or less made by the City in its West zone, the highest of 3 zones (Central $570.69, East $490.55), effective October 1, 2026. Larger connections, and any manhole a commercial building over 4,000 sq ft needs, are billed at cost.
    $651.87 one-time
City$5.19/sq ft
County$0.00
  • County Impact Fees (Travis County, Office)
    Travis County
    Texas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
    $0.00
Total (Austin): $5.19/sq ft + $20,608.27 one-time (≈ $150,309.52 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Austin (Austin Water) City of Austin Travis County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Travis County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Austin Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Austin Impact Fee FAQs

What are the total impact fees for a single-family home in Austin, Texas?

A new single-family home in Austin pays $20,216.96 per unit in combined impact fees (rates sourced November 24, 2026).

How much are commercial impact fees in Austin?

Commercial development in Austin pays $9.70 per square foot in impact fees, plus $20,608.27 in one-time water and sewer connection fees (assuming a 1-inch meter), about $505,393.27 for a 50,000 sq ft building.

Does Austin charge its own impact fees?

Yes. Austin levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Austin. The schedule on this page shows every fee that applies to development in Austin.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Travis County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.