Webberville Impact Fees by Project Type
Webberville: Single-Family Impact Fees
A new single-family home in Webberville pays at least $13,696.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (Manville WSC) — 5/8" meter ($12,071.00) and Water Meter Setting Fee (Manville WSC) — 5/8" meter ($1,625.00).
Parkland Dedication Fee in Lieu (Village of Webberville) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Webberville Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC) — 5/8" meter$12,071.00Manville Water Supply CorporationManville Water Supply Corporation capital recovery fee for a new residential 5/8 in. meter, effective June 15, 2023 (3/4 in. $18,106.50, 1 in. $24,142; larger meters by engineering study). A $100 refundable membership deposit and a separate meter setting fee also apply.
- Water Meter Setting Fee (Manville WSC) — 5/8" meter$1,625.00Manville Water Supply CorporationManville Water Supply Corporation charge to set a new meter, effective April 1, 2025; it is separate from the capital recovery fee.
- Sewer Connection Fee (On-Site Septic, No Public Sewer)$0.00On-site septicNo public wastewater system serves Webberville; homes use on-site septic systems.
- City Impact Fees (Village of Webberville)$0.00Village of WebbervilleThe Village of Webberville levies no roadway, water or wastewater impact fee and runs no water or sewer utility; water comes from Manville Water Supply Corporation. Parkland dedication applies at platting.
- Parkland Dedication Fee in Lieu (Village of Webberville)Requires confirmationVillage of WebbervilleWebberville's subdivision ordinance requires parkland dedication or a payment in lieu of land under a separate village parkland ordinance whose rate is not published online.
- County Impact Fees (Travis County)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Webberville: Multifamily Impact Fees
A new multifamily unit in Webberville pays at least $13,696.00 per unit in impact fees (rates sourced November 11, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Capital Recovery Fee (Manville WSC, MF) — 5/8" meter ($12,071.00) and Water Meter Setting Fee (Manville WSC, MF) — 5/8" meter ($1,625.00).
Parkland Dedication Fee in Lieu (Village of Webberville, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Webberville Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC, MF) — 5/8" meter$12,071.00Manville Water Supply CorporationManville Water Supply Corporation capital recovery fee by meter size, effective June 15, 2023; a unit with its own 5/8 in. meter pays $12,071, and a building on a 1.5 in. or larger meter is priced by engineering study.
- Water Meter Setting Fee (Manville WSC, MF) — 5/8" meter$1,625.00Manville Water Supply CorporationManville Water Supply Corporation charge to set a new meter, effective April 1, 2025; charged per meter, so a building on one meter pays once, and larger meters cost more.
- Sewer Connection Fee (On-Site Septic, No Public Sewer, MF)$0.00On-site septicNo public wastewater system serves Webberville; development uses on-site septic systems.
- City Impact Fees (Village of Webberville, MF)$0.00Village of WebbervilleThe Village of Webberville levies no roadway, water or wastewater impact fee and runs no water or sewer utility. Parkland dedication applies at platting.
- Parkland Dedication Fee in Lieu (Village of Webberville, MF)Requires confirmationVillage of WebbervilleWebberville's subdivision ordinance requires parkland dedication or a payment in lieu of land under a separate village parkland ordinance whose rate is not published online.
- County Impact Fees (Travis County, MF)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Webberville: Commercial Impact Fees
Commercial development in Webberville pays no per-square-foot impact fees, but owes $26,097.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $26,097.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Fee (Manville WSC) — 1" meter ($24,142.00 one-time) and Water Meter Setting Fee (Manville WSC) — 1" meter ($1,955.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Webberville Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC) — 1" meter$24,142.00 one-timeManville Water Supply CorporationManville Water Supply Corporation capital recovery fee for a new commercial 1 in. meter, effective June 15, 2023 (5/8 in. $12,071, 3/4 in. $18,106.50); meters of 1.5 in. and larger are priced by engineering study. A $100 refundable membership deposit and a separate meter setting fee also apply.
- Water Meter Setting Fee (Manville WSC) — 1" meter$1,955.00 one-timeManville Water Supply CorporationManville Water Supply Corporation charge to set a new 1 in. meter, effective April 1, 2025; it is separate from the capital recovery fee, and construction costs for a new service may be added.
- Sewer Connection Fee (On-Site Septic, No Public Sewer)$0.00On-site septicNo public wastewater system serves Webberville; buildings use on-site septic systems.
- City Impact Fees (Village of Webberville, Commercial)$0.00Village of WebbervilleThe Village of Webberville levies no roadway, water or wastewater impact fee and runs no water or sewer utility; water comes from Manville Water Supply Corporation.
- County Impact Fees (Travis County, Commercial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Webberville: Industrial Impact Fees
Industrial development in Webberville pays no per-square-foot impact fees, but owes $26,097.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 50,000 sq ft building, that comes to about $26,097.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Fee (Manville WSC) — 1" meter ($24,142.00 one-time) and Water Meter Setting Fee (Manville WSC) — 1" meter ($1,955.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Webberville Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC) — 1" meter$24,142.00 one-timeManville Water Supply CorporationManville Water Supply Corporation capital recovery fee for a new commercial 1 in. meter, effective June 15, 2023 (5/8 in. $12,071, 3/4 in. $18,106.50); meters of 1.5 in. and larger are priced by engineering study. A $100 refundable membership deposit and a separate meter setting fee also apply.
- Water Meter Setting Fee (Manville WSC) — 1" meter$1,955.00 one-timeManville Water Supply CorporationManville Water Supply Corporation charge to set a new 1 in. meter, effective April 1, 2025; it is separate from the capital recovery fee, and construction costs for a new service may be added.
- Sewer Connection Fee (On-Site Septic, No Public Sewer)$0.00On-site septicNo public wastewater system serves Webberville; buildings use on-site septic systems.
- City Impact Fees (Village of Webberville, Industrial)$0.00Village of WebbervilleThe Village of Webberville levies no roadway, water or wastewater impact fee and runs no water or sewer utility; water comes from Manville Water Supply Corporation.
- County Impact Fees (Travis County, Industrial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Webberville: Office Impact Fees
Office development in Webberville pays no per-square-foot impact fees, but owes $26,097.00 in one-time water and sewer connection fees (rates sourced November 11, 2026).
For a 25,000 sq ft building, that comes to about $26,097.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capital Recovery Fee (Manville WSC) — 1" meter ($24,142.00 one-time) and Water Meter Setting Fee (Manville WSC) — 1" meter ($1,955.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Webberville Impact Fee Schedule
- Water Capital Recovery Fee (Manville WSC) — 1" meter$24,142.00 one-timeManville Water Supply CorporationManville Water Supply Corporation capital recovery fee for a new commercial 1 in. meter, effective June 15, 2023 (5/8 in. $12,071, 3/4 in. $18,106.50); meters of 1.5 in. and larger are priced by engineering study. A $100 refundable membership deposit and a separate meter setting fee also apply.
- Water Meter Setting Fee (Manville WSC) — 1" meter$1,955.00 one-timeManville Water Supply CorporationManville Water Supply Corporation charge to set a new 1 in. meter, effective April 1, 2025; it is separate from the capital recovery fee, and construction costs for a new service may be added.
- Sewer Connection Fee (On-Site Septic, No Public Sewer)$0.00On-site septicNo public wastewater system serves Webberville; buildings use on-site septic systems.
- City Impact Fees (Village of Webberville, Office)$0.00Village of WebbervilleThe Village of Webberville levies no roadway, water or wastewater impact fee and runs no water or sewer utility; water comes from Manville Water Supply Corporation.
- County Impact Fees (Travis County, Office)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Webberville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Webberville Impact Fee FAQs
What are the total impact fees for a single-family home in Webberville, Texas?
A new single-family home in Webberville pays at least $13,696.00 per unit in combined impact fees (rates sourced November 11, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Webberville?
Commercial development in Webberville pays no per-square-foot impact fees, but owes $26,097.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Webberville charge its own impact fees?
Yes. Webberville levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Webberville. The schedule on this page shows every fee that applies to development in Webberville.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Travis County impact fees page.