Lakeway Impact Fees by Project Type
Lakeway: Single-Family Impact Fees
A new single-family home in Lakeway pays $6,900.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection ($1,200.00) and Water Connection Fee — Lakeway MUD tap fee, 5/8" meter ($1,200.00).
Parkland Fee in Lieu (City of Lakeway) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lakeway Impact Fee Schedule
- Water Connection Fee — Lakeway MUD tap fee, 5/8" meter$1,200.00Lakeway MUD, 5/8"Lakeway Municipal Utility DistrictLakeway MUD water tap fee for a 5/8 in. meter where a tap already exists; where none exists the district adds its out-of-pocket installation costs. Lakeway MUD charges no water impact fee. It serves most of Lakeway, including Rough Hollow and the Highlands since August 17, 2026; parts of Serene Hills are served by Travis County WCID No. 17 instead.
- Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection$1,200.00Lakeway MUD, 4" connectionLakeway Municipal Utility DistrictLakeway MUD wastewater tap fee for a standard 4 in. connection where the connection already exists; otherwise the district adds its out-of-pocket installation costs. Lakeway MUD charges no wastewater impact fee. Lots in the Serene Hills area sewered by Travis County WCID No. 17 pay that district's fee instead.
- Parkland Fee in Lieu (City of Lakeway)$4,500.00Requires confirmationCity of LakewayLakeway requires 3 acres of parkland per 100 new homes. Where the city council accepts a payment instead, the code sets $3,000 per home, plus a park improvement payment of at least $1,500 per home; both are due before final plat. Planned developments and Serene Hills carry their own parkland terms.
- City Impact Fees (City of Lakeway)$0.00City of LakewayLakeway levies no roadway, water or wastewater impact fee; water and wastewater come from Lakeway MUD and Travis County WCID No. 17. Parkland is dedicated at platting (3 acres per 100 new homes), or, where the city council accepts a payment instead, $3,000 per home plus a park improvement payment of at least $1,500 per home, paid before final plat.
- County Impact Fees (Travis County)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lakeway: Multifamily Impact Fees
A new multifamily unit in Lakeway pays $6,900.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (MF) — Lakeway MUD tap fee, 5/8" meter ($1,200.00) and Wastewater Connection Fee (MF) — Lakeway MUD tap fee, 4" connection ($1,200.00).
Parkland Fee in Lieu (City of Lakeway, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lakeway Impact Fee Schedule
- Water Connection Fee (MF) — Lakeway MUD tap fee, 5/8" meter$1,200.00Lakeway MUD, 5/8"Lakeway Municipal Utility DistrictLakeway MUD charges no water impact fee, only a tap fee by meter size where a tap already exists ($1,200 for a 5/8 in. meter, up to $8,000 for a meter over 2 in., plus actual costs); where none exists, out-of-pocket installation costs are added. A building on one meter pays once at that meter's size.
- Wastewater Connection Fee (MF) — Lakeway MUD tap fee, 4" connection$1,200.00Lakeway MUD, 4" connectionLakeway Municipal Utility DistrictLakeway MUD charges no wastewater impact fee, only a tap fee per connection where it already exists ($1,200 for a 4 in. connection, $2,400 for 6 in.); otherwise out-of-pocket installation costs are added. A building on one connection pays once.
- Parkland Fee in Lieu (City of Lakeway, MF)$4,500.00Requires confirmationCity of LakewayLakeway requires 3 acres of parkland per 100 new dwelling units. Where the city council accepts a payment instead, the code sets $3,000 per unit, plus a park improvement payment of at least $1,500 per unit; both are due before final plat. Planned developments carry their own parkland terms.
- City Impact Fees (City of Lakeway, MF)$0.00City of LakewayLakeway levies no roadway, water or wastewater impact fee; water and wastewater come from Lakeway MUD and Travis County WCID No. 17. Parkland is dedicated at platting (3 acres per 100 new units), or, where the city council accepts a payment instead, $3,000 per unit plus a park improvement payment of at least $1,500 per unit, paid before final plat.
- County Impact Fees (Travis County, MF)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lakeway: Commercial Impact Fees
Commercial development in Lakeway pays no per-square-foot impact fees, but owes $2,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $2,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Lakeway MUD tap fee, 1" meter ($1,600.00 one-time) and Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lakeway Impact Fee Schedule
- Water Connection Fee — Lakeway MUD tap fee, 1" meter$1,600.00 one-timeLakeway MUD, 1"Lakeway Municipal Utility DistrictLakeway MUD water tap fee for a 1 in. meter where a tap already exists; where none exists the district adds its out-of-pocket installation costs. Lakeway MUD charges no water impact fee and serves most of Lakeway; parts of Serene Hills are served by Travis County WCID No. 17 instead.
- Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection$1,200.00 one-timeLakeway MUD, 4" connectionLakeway Municipal Utility DistrictLakeway MUD wastewater tap fee for a 4 in. connection where the connection already exists; otherwise the district adds its out-of-pocket installation costs. Lakeway MUD charges no wastewater impact fee. Lots in the Serene Hills area sewered by Travis County WCID No. 17 pay that district's fee instead.
- City Impact Fees (City of Lakeway, Commercial)$0.00City of LakewayLakeway levies no roadway, water or wastewater impact fee, and its parkland dedication applies to residential subdivisions only. Nonresidential sites must improve abutting streets and utilities as part of site plan approval.
- County Impact Fees (Travis County, Commercial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lakeway: Industrial Impact Fees
Industrial development in Lakeway pays no per-square-foot impact fees, but owes $2,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $2,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Lakeway MUD tap fee, 1" meter ($1,600.00 one-time) and Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lakeway Impact Fee Schedule
- Water Connection Fee — Lakeway MUD tap fee, 1" meter$1,600.00 one-timeLakeway MUD, 1"Lakeway Municipal Utility DistrictLakeway MUD water tap fee for a 1 in. meter where a tap already exists; where none exists the district adds its out-of-pocket installation costs. Lakeway MUD charges no water impact fee and serves most of Lakeway; parts of Serene Hills are served by Travis County WCID No. 17 instead.
- Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection$1,200.00 one-timeLakeway MUD, 4" connectionLakeway Municipal Utility DistrictLakeway MUD wastewater tap fee for a 4 in. connection where the connection already exists; otherwise the district adds its out-of-pocket installation costs. Lakeway MUD charges no wastewater impact fee. Lots in the Serene Hills area sewered by Travis County WCID No. 17 pay that district's fee instead.
- City Impact Fees (City of Lakeway, Industrial)$0.00City of LakewayLakeway levies no roadway, water or wastewater impact fee, and its parkland dedication applies to residential subdivisions only. Nonresidential sites must improve abutting streets and utilities as part of site plan approval.
- County Impact Fees (Travis County, Industrial)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lakeway: Office Impact Fees
Office development in Lakeway pays no per-square-foot impact fees, but owes $2,800.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $2,800.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection Fee — Lakeway MUD tap fee, 1" meter ($1,600.00 one-time) and Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection ($1,200.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lakeway Impact Fee Schedule
- Water Connection Fee — Lakeway MUD tap fee, 1" meter$1,600.00 one-timeLakeway MUD, 1"Lakeway Municipal Utility DistrictLakeway MUD water tap fee for a 1 in. meter where a tap already exists; where none exists the district adds its out-of-pocket installation costs. Lakeway MUD charges no water impact fee and serves most of Lakeway; parts of Serene Hills are served by Travis County WCID No. 17 instead.
- Wastewater Connection Fee — Lakeway MUD tap fee, 4" connection$1,200.00 one-timeLakeway MUD, 4" connectionLakeway Municipal Utility DistrictLakeway MUD wastewater tap fee for a 4 in. connection where the connection already exists; otherwise the district adds its out-of-pocket installation costs. Lakeway MUD charges no wastewater impact fee. Lots in the Serene Hills area sewered by Travis County WCID No. 17 pay that district's fee instead.
- City Impact Fees (City of Lakeway, Office)$0.00City of LakewayLakeway levies no roadway, water or wastewater impact fee, and its parkland dedication applies to residential subdivisions only. Nonresidential sites must improve abutting streets and utilities as part of site plan approval.
- County Impact Fees (Travis County, Office)$0.00Travis CountyTexas counties cannot levy Chapter 395 impact fees; the only county exception is storm water and drainage in a county of 3.3 million or more or one bordering it, which does not reach Travis County.
Where in Travis County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lakeway Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lakeway Impact Fee FAQs
What are the total impact fees for a single-family home in Lakeway, Texas?
A new single-family home in Lakeway pays $6,900.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Lakeway?
Commercial development in Lakeway pays no per-square-foot impact fees, but owes $2,800.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Lakeway charge its own impact fees?
Yes. Lakeway levies its own municipal impact or utility fees. Travis County does not currently add county-level impact fees inside Lakeway. The schedule on this page shows every fee that applies to development in Lakeway.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Travis County impact fees page.