Skip to content
IMPACTFEES.ORG

Belleair Beach, Florida Impact Fees

Belleair Beach applies its own fee schedule: municipal fees plus the Pinellas County-levied fees that apply inside city limits. Combined, a new single-family home pays $8,313.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Belleair Beach Impact Fees by Project Type

Belleair Beach: Single-Family Impact Fees

A new single-family home in Belleair Beach pays $8,313.00 per unit in impact fees (rates sourced October 27, 2026). Of that, Pinellas County-levied fees account for $6,313.00 and municipal or utility fees for $2,000.00.

The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A) ($1,679.00), Sewer Connection Fee (City of Belleair Beach) ($1,000.00) and Fire Impact Fee (Pinellas Suncoast Fire & Rescue District) ($1,000.00).

Sewer Connection Fee (Pinellas County Utilities) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Belleair Beach Impact Fee Schedule
Water$1,836.00
  • Water Meter and Meter Box Charge (Pinellas County Utilities) — 5/8" x 3/4" meter
    Pinellas County Utilities
    Pinellas County Utilities charge for a new water meter and meter box: $744 for the standard 5/8" x 3/4" home meter, effective October 1, 2026 (1" $794, 1-1/2" $1,134, 2" $1,255; 4" and larger at cost). The tap and service line are charged separately.
    $744.00
  • Water Tap and Service Line Charge (Pinellas County Utilities) — 5/8" x 3/4"
    Pinellas County Utilities
    Pinellas County Utilities charge for tapping the main and installing the water service line for a 5/8" x 3/4" meter: $669, effective October 1, 2026 (1" $669, 1-1/2" $861, 2" $1,091). Where the developer installs the service line to PCU standards, no PCU tap charge applies (see the developer-installed option).
    $669.00
  • Water Capacity Fee (Pinellas County Utilities)
    5/8" x 3/4" meter
    Pinellas County Utilities
    Pinellas County Utilities supplies water here. Its one-time residential water capacity (impact) fee for a single-family home is $423 on a 5/8 x 3/4 inch meter and $1,056 on a 1 inch meter, under the schedule effective October 1, 2026. Meter, meter box, tap and service line installation are charged separately where the county installs them.
    $423.00
Sewer$3,798.00
  • Sewer Connection Fee (Pinellas County Utilities)
    Pinellas County Utilities
    Pinellas County Utilities provides sanitary sewer service in this jurisdiction. Its one-time sewer connection (impact) fee for a single-family residence is $2,798, effective 10/1/2025.
    $2,798.00Requires confirmation
  • Sewer Connection Fee (City of Belleair Beach)
    City of Belleair Beach
    City of Belleair Beach sewer connection fee, $1,000 per connection, paid at building permit issuance for all new buildings. The city owns the sewer collection system; Pinellas County treats the wastewater.
    $1,000.00
City$0.00
  • Municipal Impact Fees (City of Belleair Beach — None)
    City of Belleair Beach
    This jurisdiction levies no municipal (non-utility) impact fees. The only impact fee that applies here is the countywide Pinellas County Multimodal (transportation) Impact Fee, shown under the County category, together with any water and sewer connection fees listed separately.
    $0.00
County$1,679.00
  • Multimodal Impact Fee (Pinellas County — Schedule A)
    Single-family 1,501–2,499 sq ft
    Pinellas County
    Pinellas County's Multimodal (transportation) Impact Fee is the only impact fee Pinellas County itself levies. It applies countywide: every municipality collects and administers it within its limits. The single-family rate is tiered by heated living area: $1,356 (up to 1,500 sq ft), $1,679 (1,501–2,499 sq ft), and $2,066 (2,500 sq ft and over). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
    $1,679.00
Other$1,000.00
  • Fire Impact Fee (Pinellas Suncoast Fire & Rescue District)
    Single-story
    Pinellas Suncoast Fire & Rescue District
    New construction in Belleair Beach lies within the Pinellas Suncoast Fire & Rescue District, which levies a fire impact fee of $0.50 per square foot on single-story construction ($0.63 for multi-story), assessed on all area under roof. A 2,000 square foot single-story home is about $1,000. This special-district fee is separate from any municipal or county impact fee.
    $1,000.00
Total (Belleair Beach): $8,313.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleair Beach: Multifamily Impact Fees

A new multifamily unit in Belleair Beach pays $5,498.00 per unit in impact fees (rates sourced October 27, 2026). Of that, Pinellas County-levied fees account for $3,868.00 and municipal or utility fees for $1,630.00.

The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A, MF) ($1,420.00), Sewer Connection Fee (City of Belleair Beach, MF) ($1,000.00) and Fire Impact Fee (Pinellas Suncoast Fire & Rescue District, MF) ($630.00).

Sewer Connection Fee (Pinellas County Utilities, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Belleair Beach Impact Fee Schedule
Water$211.00
  • Water Capacity Fee (Pinellas County Utilities, MF)
    2 bedroom (master-metered apt)
    Pinellas County Utilities
    Pinellas County Utilities supplies water here. Its one-time water capacity (impact) fee for master-metered apartments is charged per unit by bedroom count: $169 (1 bedroom), $211 (2 bedrooms) and $253 (3 bedrooms), with a loft or den counted as a bedroom. A master-metered duplex pays $592 and a triplex $761 per building. Schedule effective October 1, 2026. The building’s water meter and tap are charged once, by the master meter’s size, under the Pinellas County Utilities meter and tap schedule (5/8" x 3/4" meter $744 plus $669 tap; 2" $1,255 plus $1,091), effective October 1, 2026.
    $211.00
Sewer$3,237.00
  • Sewer Connection Fee (Pinellas County Utilities, MF)
    Pinellas County Utilities
    Pinellas County Utilities provides sanitary sewer service in this jurisdiction. Its one-time sewer connection (impact) fee is $2,237 per multifamily dwelling unit, effective 10/1/2025.
    $2,237.00Requires confirmation
  • Sewer Connection Fee (City of Belleair Beach, MF)
    City of Belleair Beach
    City of Belleair Beach sewer connection fee, $1,000 per connection, paid at building permit issuance; shown per unit on its own connection, while a building on one connection pays once.
    $1,000.00
City$0.00
  • Municipal Impact Fees (City of Belleair Beach — None, MF)
    City of Belleair Beach
    This jurisdiction levies no municipal (non-utility) impact fees. The only impact fee that applies here is the countywide Pinellas County Multimodal (transportation) Impact Fee, shown under the County category, together with any water and sewer connection fees listed separately.
    $0.00
County$1,420.00
  • Multimodal Impact Fee (Pinellas County — Schedule A, MF)
    Pinellas County
    Pinellas County's Multimodal (transportation) Impact Fee is the only impact fee Pinellas County itself levies. It applies countywide: every municipality collects and administers it within its limits. The multifamily rate is a flat $1,420 per dwelling unit (single-family rates are tiered by home size). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
    $1,420.00
Other$630.00
  • Fire Impact Fee (Pinellas Suncoast Fire & Rescue District, MF)
    Multi-story
    Pinellas Suncoast Fire & Rescue District
    New multifamily construction in Belleair Beach lies within the Pinellas Suncoast Fire & Rescue District, which levies a fire impact fee of $0.63 per square foot on multi-story construction, assessed on all area under roof. A 1,000 square foot unit is about $630. This special-district fee is separate from any municipal or county impact fee.
    $630.00
Total (Belleair Beach): $5,498.00
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleair Beach: Commercial Impact Fees

Commercial development in Belleair Beach pays $3.90 per square foot in impact fees, plus $2,056.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $196,856.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Belleair Beach, Nonresidential) ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Commercial) ($3.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Belleair Beach Impact Fee Schedule
Water$1,056.00 one-time
Sewer$1,000.00 one-time
City$0.00
  • Municipal Impact Fee (City of Belleair Beach, Commercial)
    City of Belleair Beach
    The City of Belleair Beach levies no municipal impact fee on nonresidential development. The countywide multimodal impact fee, the Pinellas Suncoast Fire & Rescue District fire impact fee, the city sewer connection fee and Pinellas County Utilities water charges apply and are listed separately.
    $0.00
County$3.40/sq ft
  • Multimodal Impact Fee (Pinellas County, Commercial)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft of gross leasable area for general commercial under 100,000 sq ft; larger centers pay $3,627 to $4,192 per 1,000 sq ft by size, and restaurants, banks and other listed uses have their own rates. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $3.40/sq ft
Other$0.50/sq ft
  • Fire Impact Fee (Pinellas Suncoast Fire & Rescue District, Commercial) — single-story
    Pinellas Suncoast Fire & Rescue District
    Belleair Beach lies within the Pinellas Suncoast Fire & Rescue District, which charges a fire impact fee on all new construction under roof, including covered parking: $0.50 per sq ft single-story, $0.63 per sq ft multi-story (Resolution 2017-02, effective April 18, 2017). Paid to the district before the certificate of occupancy.
    $0.50/sq ft
Total (Belleair Beach): $3.90/sq ft + $2,056.00 one-time (≈ $196,856.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleair Beach: Industrial Impact Fees

Industrial development in Belleair Beach pays $1.91 per square foot in impact fees, plus $2,056.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $97,756.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Belleair Beach, Nonresidential) ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Industrial) ($1.41/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Belleair Beach Impact Fee Schedule
Water$1,056.00 one-time
Sewer$1,000.00 one-time
City$0.00
  • Municipal Impact Fee (City of Belleair Beach, Industrial)
    City of Belleair Beach
    The City of Belleair Beach levies no municipal impact fee on nonresidential development. The countywide multimodal impact fee, the Pinellas Suncoast Fire & Rescue District fire impact fee, the city sewer connection fee and Pinellas County Utilities water charges apply and are listed separately.
    $0.00
County$1.41/sq ft
  • Multimodal Impact Fee (Pinellas County, Industrial)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft for general industrial and industrial parks; manufacturing and warehousing pay lower listed rates. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $1.41/sq ft
Other$0.50/sq ft
  • Fire Impact Fee (Pinellas Suncoast Fire & Rescue District, Industrial) — single-story
    Pinellas Suncoast Fire & Rescue District
    Belleair Beach lies within the Pinellas Suncoast Fire & Rescue District, which charges a fire impact fee on all new construction under roof, including covered parking: $0.50 per sq ft single-story, $0.63 per sq ft multi-story (Resolution 2017-02, effective April 18, 2017). Paid to the district before the certificate of occupancy.
    $0.50/sq ft
Total (Belleair Beach): $1.91/sq ft + $2,056.00 one-time (≈ $97,756.00 at 50,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleair Beach: Office Impact Fees

Office development in Belleair Beach pays $3.92 per square foot in impact fees, plus $2,056.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to at least $100,106.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Belleair Beach, Nonresidential) ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Office) ($3.29/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Belleair Beach Impact Fee Schedule
Water$1,056.00 one-time
Sewer$1,000.00 one-time
City$0.00
  • Municipal Impact Fee (City of Belleair Beach, Office)
    City of Belleair Beach
    The City of Belleair Beach levies no municipal impact fee on nonresidential development. The countywide multimodal impact fee, the Pinellas Suncoast Fire & Rescue District fire impact fee, the city sewer connection fee and Pinellas County Utilities water charges apply and are listed separately.
    $0.00
County$3.29/sq ft
  • Multimodal Impact Fee (Pinellas County, Office)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft for general office under 50,000 sq ft; larger buildings pay $1,656 to $2,767 per 1,000 sq ft by size, and medical office has its own rate. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $3.29/sq ft
Other$0.63/sq ft
  • Fire Impact Fee (Pinellas Suncoast Fire & Rescue District, Office) — multi-story
    Pinellas Suncoast Fire & Rescue District
    Belleair Beach lies within the Pinellas Suncoast Fire & Rescue District, which charges a fire impact fee on all new construction under roof, including covered parking: $0.63 per sq ft multi-story, $0.50 per sq ft single-story (Resolution 2017-02, effective April 18, 2017). Paid to the district before the certificate of occupancy.
    $0.63/sq ft
Total (Belleair Beach): $3.92/sq ft + $2,056.00 one-time (≈ $100,106.00 at 25,000 sq ft)
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Belleair Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Belleair Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Belleair Beach, Florida?

A new single-family home in Belleair Beach pays $8,313.00 per unit in combined impact fees (rates sourced October 27, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Belleair Beach?

Commercial development in Belleair Beach pays $3.90 per square foot in impact fees, plus $2,056.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $196,856.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Belleair Beach charge its own impact fees?

Yes. Belleair Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Belleair Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pinellas County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000