Treasure Island impact fees by project type
Treasure Island: Single-Family Impact Fees
A new single-family home in Treasure Island pays $2,814.00 per unit in impact fees (rates sourced July 17, 2026). Of that, Pinellas County-levied fees account for $2,489.00 and municipal or utility fees for $325.00.
The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A) ($2,066.00), Water Capacity Fee (Pinellas County Utilities) ($423.00) and Sewer Connection Fee (City of Treasure Island) ($325.00).
View the full fee schedule
- Water Capacity Fee (Pinellas County Utilities)$423.00Pinellas County UtilitiesPCU water capacity (impact) fee, 5/8x3/4 meter (SF). Eff 10/1/2025 §VII.A. Treasure Island's drinking water is owned/maintained by Pinellas County Utilities.
- Sewer Connection Fee (City of Treasure Island)$325.00City of Treasure IslandCONFIRMED - Treasure Island has NO sewer capacity/impact fee. Its adopted FY26 City-Wide Fee Schedule carries only a flat $325 'Fee to Connect to Public Sanitary Sewer System - for structures not previously connected' (TI-LDR Sec. 75-62). Charged per structure, not per dwelling unit or ERU. Article VIII (Utility Fees) contains only recurring monthly rates. Water is supplied by Pinellas County Utilities. Finance 727-547-4575.
- Municipal Impact Fees (City of Treasure Island — None)$0.00City of Treasure IslandNo municipal (non-utility) impact fees found; only the countywide Pinellas MIF applies (entered as County).
- Multimodal Impact Fee (Pinellas County — Schedule A)$2,066.00Pinellas CountyPinellas County Countywide MIF, §150-40 Schedule A. SF $2,066/DU (2,500+ sf representative; smaller SF tiers may be lower). Frozen per SB 180 until ≥10/1/2027. Only impact fee in Pinellas.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Treasure Island: Multifamily Impact Fees
A new multifamily unit in Treasure Island pays $1,956.00 per unit in impact fees (rates sourced July 17, 2026). Of that, Pinellas County-levied fees account for $1,631.00 and municipal or utility fees for $325.00.
The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A, MF) ($1,420.00), Sewer Connection Fee (City of Treasure Island, MF) ($325.00) and Water Capacity Fee (Pinellas County Utilities, MF) ($211.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capacity Fee (Pinellas County Utilities, MF)$211.00Pinellas County UtilitiesPCU water capacity fee per bedroom: 1BR $169 / 2BR $211 (default) / 3BR $253. Eff 10/1/2025 §VII.A. Treasure Island drinking water owned by PCU.
- Sewer Connection Fee (City of Treasure Island, MF)$325.00City of Treasure IslandCONFIRMED - Treasure Island has NO sewer capacity/impact fee. Its adopted FY26 City-Wide Fee Schedule carries only a flat $325 connection fee for structures not previously connected (TI-LDR Sec. 75-62). It is charged PER STRUCTURE, not per dwelling unit - so an MF building pays $325 once, not $325 per unit. Water is from Pinellas County Utilities.
- Municipal Impact Fees (City of Treasure Island — None, MF)$0.00City of Treasure IslandNo municipal (non-utility) impact fees found; only the countywide Pinellas MIF applies (County).
- Multimodal Impact Fee (Pinellas County — Schedule A, MF)$1,420.00Pinellas CountyPinellas County Countywide MIF, §150-40 Schedule A. Multi-family $1,420/DU (confirmed on Municode). Frozen per SB 180 until ≥10/1/2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Treasure Island: Commercial Impact Fees
Commercial development in Treasure Island pays $3.40 per square foot in impact fees, plus $1,381.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $171,181.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Treasure Island, Nonresidential) ($325.00 one-time) and Multimodal Impact Fee (Pinellas County, Commercial) ($3.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesPCU Commercial water capacity (impact) fee §VII.B, eff. 10/1/2025. Meter-size ERU ladder: 5/8x3/4=1.0, 1"=2.5, 1.5"=5, 2"=10, 2x2" manifold=20, 4" compound=30, 4" turbine=40, 6"=100, 8"=175. Default on canonical 1" meter.
- Sewer Connection Fee (City of Treasure Island, Nonresidential)$325.00 one-timeCity of Treasure IslandCONFIRMED — City of Treasure Island has NO sewer capacity/impact fee. Its adopted FY26 City-Wide Fee Schedule carries only a flat $325 'Fee to Connect to Public Sanitary Sewer System — for structures not previously connected' (TI-LDR Sec. 75-62), charged per structure (not per ERU/DU). Water is supplied by Pinellas County Utilities (see PCU water records). Finance 727-547-4575.
- Municipal Impact Fee (City of Treasure Island, Commercial)$0.00City of Treasure IslandCity of Treasure Island levies no municipal (non-utility) impact fee — confirmed $0 (matches residential pass; only the countywide Pinellas MIF applies). Nonres pays the County MIF + PCU water capacity + the city's $325 flat sewer connection fee. $0 placeholder.
- Multimodal Impact Fee (Pinellas County, Commercial)$3.40/sq ftPinellas CountyPinellas County Multimodal Impact Fee, Schedule A (General/non-downtown), Code §150-40(c). General Commercial 'Under 100,000 sq. ft.' = $3,396 per 1,000 sf (GLA). Treasure Island is not a mapped downtown-district city, so Schedule A applies. Frozen per SB 180 until Oct 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Treasure Island: Industrial Impact Fees
Industrial development in Treasure Island pays $1.41 per square foot in impact fees, plus $1,381.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $72,081.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Treasure Island, Nonresidential) ($325.00 one-time) and Multimodal Impact Fee (Pinellas County, Industrial) ($1.41/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesPCU Commercial water capacity (impact) fee §VII.B, eff. 10/1/2025. Meter-size ERU ladder: 5/8x3/4=1.0, 1"=2.5, 1.5"=5, 2"=10, 2x2" manifold=20, 4" compound=30, 4" turbine=40, 6"=100, 8"=175. Default on canonical 1" meter.
- Sewer Connection Fee (City of Treasure Island, Nonresidential)$325.00 one-timeCity of Treasure IslandCONFIRMED — City of Treasure Island has NO sewer capacity/impact fee. Its adopted FY26 City-Wide Fee Schedule carries only a flat $325 'Fee to Connect to Public Sanitary Sewer System — for structures not previously connected' (TI-LDR Sec. 75-62), charged per structure (not per ERU/DU). Water is supplied by Pinellas County Utilities (see PCU water records). Finance 727-547-4575.
- Municipal Impact Fee (City of Treasure Island, Industrial)$0.00City of Treasure IslandCity of Treasure Island levies no municipal impact fee — confirmed $0 (matches residential pass). $0 placeholder.
- Multimodal Impact Fee (Pinellas County, Industrial)$1.41/sq ftPinellas CountyPinellas County Multimodal Impact Fee, Schedule A, Code §150-40(c). General industrial = $1,414 per 1,000 sf. Countywide; frozen per SB 180 until Oct 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Treasure Island: Office Impact Fees
Office development in Treasure Island pays $3.29 per square foot in impact fees, plus $1,381.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to about $83,681.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time), Sewer Connection Fee (City of Treasure Island, Nonresidential) ($325.00 one-time) and Multimodal Impact Fee (Pinellas County, Office) ($3.29/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesPCU Commercial water capacity (impact) fee §VII.B, eff. 10/1/2025. Meter-size ERU ladder: 5/8x3/4=1.0, 1"=2.5, 1.5"=5, 2"=10, 2x2" manifold=20, 4" compound=30, 4" turbine=40, 6"=100, 8"=175. Default on canonical 1" meter.
- Sewer Connection Fee (City of Treasure Island, Nonresidential)$325.00 one-timeCity of Treasure IslandCONFIRMED — City of Treasure Island has NO sewer capacity/impact fee. Its adopted FY26 City-Wide Fee Schedule carries only a flat $325 'Fee to Connect to Public Sanitary Sewer System — for structures not previously connected' (TI-LDR Sec. 75-62), charged per structure (not per ERU/DU). Water is supplied by Pinellas County Utilities (see PCU water records). Finance 727-547-4575.
- Municipal Impact Fee (City of Treasure Island, Office)$0.00City of Treasure IslandCity of Treasure Island levies no municipal impact fee — confirmed $0 (matches residential pass). $0 placeholder.
- Multimodal Impact Fee (Pinellas County, Office)$3.29/sq ftPinellas CountyPinellas County Multimodal Impact Fee, Schedule A, Code §150-40(c). General Office '0–49,999 sq. ft.' = $3,292 per 1,000 sf. Countywide; frozen per SB 180 until Oct 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Treasure Island
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Treasure Island, Florida?
A new single-family home in Treasure Island pays $2,814.00 per unit in combined impact fees (rates sourced July 17, 2026).
How much are commercial impact fees in Treasure Island?
Commercial development in Treasure Island pays $3.40 per square foot in impact fees, plus $1,381.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $171,181.00 for a 50,000 sq ft building.
Does Treasure Island charge its own impact fees?
Yes. Treasure Island levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Treasure Island, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Pinellas County impact fees page.