Kenneth City impact fees by project type
Kenneth City: Single-Family Impact Fees
A new single-family home in Kenneth City pays $4,900.00 per unit in impact fees (rates sourced July 25, 2026). All of it is levied by Pinellas County.
The largest line items are Sewer Connection Fee (Pinellas County Utilities) ($2,798.00), Multimodal Impact Fee (Pinellas County — Schedule A) ($1,679.00) and Water Capacity Fee (Pinellas County Utilities) ($423.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Kenneth City impact fee schedule
- Water Capacity Fee (Pinellas County Utilities)$423.00Pinellas County Utilities
- Sewer Connection Fee (Pinellas County Utilities)$2,798.00Pinellas County Utilities
- Municipal Impact Fees (Town of Kenneth City — None)$0.00Town of Kenneth City
- Multimodal Impact Fee (Pinellas County — Schedule A)$1,679.00Single-family 1,501–2,499 sq ftPinellas CountyPinellas County's Multimodal (transportation) Impact Fee is the only impact fee levied in Pinellas County, and it applies countywide — every municipality collects and administers it. The single-family rate is tiered by heated living area: $1,356 (up to 1,500 sq ft), $1,679 (1,501–2,499 sq ft), and $2,066 (2,500 sq ft and over). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours.
Kenneth City: Multifamily Impact Fees
A new multifamily unit in Kenneth City pays $3,868.00 per unit in impact fees (rates sourced July 25, 2026). All of it is levied by Pinellas County.
The largest line items are Sewer Connection Fee (Pinellas County Utilities, MF) ($2,237.00), Multimodal Impact Fee (Pinellas County — Schedule A, MF) ($1,420.00) and Water Capacity Fee (Pinellas County Utilities, MF) ($211.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full Kenneth City impact fee schedule
- Water Capacity Fee (Pinellas County Utilities, MF)$211.002 bedroom (master-metered apt)Pinellas County Utilities
- Sewer Connection Fee (Pinellas County Utilities, MF)$2,237.00Pinellas County Utilities
- Municipal Impact Fees (Town of Kenneth City — None, MF)$0.00Town of Kenneth City
- Multimodal Impact Fee (Pinellas County — Schedule A, MF)$1,420.00Pinellas CountyPinellas County's Multimodal (transportation) Impact Fee is the only impact fee levied in Pinellas County, and it applies countywide — every municipality collects and administers it. The multifamily rate is a flat $1,420 per dwelling unit (single-family rates are tiered by home size). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Kenneth City: Commercial Impact Fees
Commercial development in Kenneth City pays $3.40 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).
For a 50,000 sq ft building, that comes to at least $170,856.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Commercial) ($3.40/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Kenneth City impact fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesEffective October 1, 2025. Water capacity fee set by meter size.
- Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flowContact jurisdiction/utility to verifyPinellas County UtilitiesEffective October 1, 2025. Charged per gallon of estimated daily flow, determined at application.
- Municipal Impact Fee (Town of Kenneth City, Commercial)$0.00Town of Kenneth City
- Multimodal Impact Fee (Pinellas County, Commercial)$3.40/sq ftPinellas CountyCountywide multimodal impact fee. Frozen under SB 180 through October 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Kenneth City: Industrial Impact Fees
Industrial development in Kenneth City pays $1.41 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).
For a 50,000 sq ft building, that comes to at least $71,756.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Industrial) ($1.41/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Kenneth City impact fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesEffective October 1, 2025. Water capacity fee set by meter size.
- Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flowContact jurisdiction/utility to verifyPinellas County UtilitiesEffective October 1, 2025. Charged per gallon of estimated daily flow, determined at application.
- Municipal Impact Fee (Town of Kenneth City, Industrial)$0.00Town of Kenneth City
- Multimodal Impact Fee (Pinellas County, Industrial)$1.41/sq ftPinellas CountyCountywide multimodal impact fee. Frozen under SB 180 through October 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Kenneth City: Office Impact Fees
Office development in Kenneth City pays $3.29 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).
For a 25,000 sq ft building, that comes to at least $83,356.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Office) ($3.29/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full Kenneth City impact fee schedule
- Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter$1,056.00 one-timePinellas County UtilitiesEffective October 1, 2025. Water capacity fee set by meter size.
- Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flowContact jurisdiction/utility to verifyPinellas County UtilitiesEffective October 1, 2025. Charged per gallon of estimated daily flow, determined at application.
- Municipal Impact Fee (Town of Kenneth City, Office)$0.00Town of Kenneth City
- Multimodal Impact Fee (Pinellas County, Office)$3.29/sq ftPinellas CountyCountywide multimodal impact fee. Frozen under SB 180 through October 2027.
Where in Pinellas County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Kenneth City impact fee calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Kenneth City impact fee FAQs
What are the total impact fees for a single-family home in Kenneth City, Florida?
A new single-family home in Kenneth City pays $4,900.00 per unit in combined impact fees (rates sourced July 25, 2026).
How much are commercial impact fees in Kenneth City?
Commercial development in Kenneth City pays $3.40 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $170,856.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Kenneth City charge its own impact fees?
No. Kenneth City does not levy its own municipal impact fees. New development in Kenneth City pays Pinellas County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Pinellas County impact fees page.