Skip to content
IMPACTFEES.ORG

Redington Shores, Florida Impact Fees

Redington Shores applies its own fee schedule: municipal fees plus the Pinellas County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $4,900.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Redington Shores Impact Fees by Project Type

Redington Shores: Single-Family Impact Fees

A new single-family home in Redington Shores pays at least $4,900.00 per unit in impact fees (rates sourced July 25, 2026). All of it is levied by Pinellas County.

The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A) ($1,679.00) and Water Capacity Fee (Pinellas County Utilities) ($423.00).

Sewer Connection Fee (Pinellas County Utilities) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Municipal Impact Fees (Town of Redington Shores — None) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Redington Shores Impact Fee Schedule
Water$423.00
  • Water Capacity Fee (Pinellas County Utilities)
    5/8" x 3/4" meter
    Pinellas County Utilities
    Pinellas County Utilities supplies water here. Its one-time residential water capacity (impact) fee for a single-family home is $423 on a 5/8 x 3/4 inch meter and $1,056 on a 1 inch meter, under the schedule effective October 1, 2026. Meter, meter box, tap and service line installation are charged separately where the county installs them.
    $423.00
Sewer$2,798.00
  • Sewer Connection Fee (Pinellas County Utilities)
    Pinellas County Utilities
    Pinellas County Utilities provides sanitary sewer service in this jurisdiction. Its one-time sewer connection (impact) fee for a single-family residence is $2,798, effective 10/1/2025.
    $2,798.00Requires confirmation
City$0.00
  • Municipal Impact Fees (Town of Redington Shores — None)
    Town of Redington Shores
    This jurisdiction levies no municipal (non-utility) impact fees. The only impact fee that applies here is the countywide Pinellas County Multimodal (transportation) Impact Fee, shown under the County category, together with any water and sewer connection fees listed separately.
    Requires confirmation
County$1,679.00
  • Multimodal Impact Fee (Pinellas County — Schedule A)
    Single-family 1,501–2,499 sq ft
    Pinellas County
    Pinellas County's Multimodal (transportation) Impact Fee is the only impact fee Pinellas County itself levies. It applies countywide: every municipality collects and administers it within its limits. The single-family rate is tiered by heated living area: $1,356 (up to 1,500 sq ft), $1,679 (1,501–2,499 sq ft), and $2,066 (2,500 sq ft and over). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
    $1,679.00
Total (Redington Shores): $4,900.00
Sources last checked Official fee schedules:Pinellas County Utilities Town of Redington Shores Pinellas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Redington Shores: Multifamily Impact Fees

A new multifamily unit in Redington Shores pays at least $3,868.00 per unit in impact fees (rates sourced July 25, 2026). All of it is levied by Pinellas County.

The largest line items are Multimodal Impact Fee (Pinellas County — Schedule A, MF) ($1,420.00) and Water Capacity Fee (Pinellas County Utilities, MF) ($211.00).

Sewer Connection Fee (Pinellas County Utilities, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Municipal Impact Fees (Town of Redington Shores — None, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Redington Shores Impact Fee Schedule
Water$211.00
  • Water Capacity Fee (Pinellas County Utilities, MF)
    2 bedroom (master-metered apt)
    Pinellas County Utilities
    Pinellas County Utilities supplies water here. Its one-time water capacity (impact) fee for master-metered apartments is charged per unit by bedroom count: $169 (1 bedroom), $211 (2 bedrooms) and $253 (3 bedrooms), with a loft or den counted as a bedroom. A master-metered duplex pays $592 and a triplex $761 per building. Schedule effective October 1, 2026.
    $211.00
Sewer$2,237.00
  • Sewer Connection Fee (Pinellas County Utilities, MF)
    Pinellas County Utilities
    Pinellas County Utilities provides sanitary sewer service in this jurisdiction. Its one-time sewer connection (impact) fee is $2,237 per multifamily dwelling unit, effective 10/1/2025.
    $2,237.00Requires confirmation
City$0.00
  • Municipal Impact Fees (Town of Redington Shores — None, MF)
    Town of Redington Shores
    This jurisdiction levies no municipal (non-utility) impact fees. The only impact fee that applies here is the countywide Pinellas County Multimodal (transportation) Impact Fee, shown under the County category, together with any water and sewer connection fees listed separately.
    Requires confirmation
County$1,420.00
  • Multimodal Impact Fee (Pinellas County — Schedule A, MF)
    Pinellas County
    Pinellas County's Multimodal (transportation) Impact Fee is the only impact fee Pinellas County itself levies. It applies countywide: every municipality collects and administers it within its limits. The multifamily rate is a flat $1,420 per dwelling unit (single-family rates are tiered by home size). Reduced Schedule B rates apply within designated downtown redevelopment districts. A credit applies for the highest prior use on the site since 1986. Rates were last set in 2019 and are unchanged.
    $1,420.00
Total (Redington Shores): $3,868.00
Sources last checked Official fee schedules:Pinellas County Utilities Town of Redington Shores Pinellas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Redington Shores: Commercial Impact Fees

Commercial development in Redington Shores pays $3.40 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 50,000 sq ft building, that comes to at least $170,856.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Commercial) ($3.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Municipal Impact Fee (Town of Redington Shores, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Redington Shores Impact Fee Schedule
Water$1,056.00 one-time
Sewer$0.00
City$0.00
  • Municipal Impact Fee (Town of Redington Shores, Commercial)
    Town of Redington Shores
    The Town of Redington Shores charges new or improved commercial construction a park land dedication fee of $500 for each $50,000 of land and building value (one land dedication unit), paid before the building permit is issued. The countywide multimodal impact fee applies and is listed separately.
    Requires confirmation
County$3.40/sq ft
  • Multimodal Impact Fee (Pinellas County, Commercial)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft of gross leasable area for general commercial under 100,000 sq ft; larger centers pay $3,627 to $4,192 per 1,000 sq ft by size, and restaurants, banks and other listed uses have their own rates. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $3.40/sq ft
Total (Redington Shores): $3.40/sq ft + $1,056.00 one-time (≈ $170,856.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Pinellas County Utilities Town of Redington Shores Pinellas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Redington Shores: Industrial Impact Fees

Industrial development in Redington Shores pays $1.41 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 50,000 sq ft building, that comes to at least $71,756.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Industrial) ($1.41/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Redington Shores Impact Fee Schedule
Water$1,056.00 one-time
Sewer$0.00
City$0.00
  • Municipal Impact Fee (Town of Redington Shores, Industrial)
    Town of Redington Shores
    The Town of Redington Shores levies no municipal impact fee on industrial development; its land dedication fee covers residential and commercial use. The countywide multimodal impact fee applies and is listed separately.
    $0.00
County$1.41/sq ft
  • Multimodal Impact Fee (Pinellas County, Industrial)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft for general industrial and industrial parks; manufacturing and warehousing pay lower listed rates. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $1.41/sq ft
Total (Redington Shores): $1.41/sq ft + $1,056.00 one-time (≈ $71,756.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Pinellas County Utilities Town of Redington Shores Pinellas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Redington Shores: Office Impact Fees

Office development in Redington Shores pays $3.29 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 25,000 sq ft building, that comes to at least $83,356.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Capacity Fee (Pinellas County Utilities, Nonresidential) — 1" meter ($1,056.00 one-time) and Multimodal Impact Fee (Pinellas County, Office) ($3.29/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Pinellas County Utilities, Nonresidential) — per gallon of flow is set by the utility and not published online. Municipal Impact Fee (Town of Redington Shores, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Redington Shores Impact Fee Schedule
Water$1,056.00 one-time
Sewer$0.00
City$0.00
  • Municipal Impact Fee (Town of Redington Shores, Office)
    Town of Redington Shores
    The Town of Redington Shores charges new or improved commercial construction, including offices, a park land dedication fee of $500 for each $50,000 of land and building value (one land dedication unit), paid before the building permit is issued. The countywide multimodal impact fee applies and is listed separately.
    Requires confirmation
County$3.29/sq ft
  • Multimodal Impact Fee (Pinellas County, Office)
    Pinellas County
    Pinellas County multimodal (transportation) impact fee, levied countywide; each city collects it within its limits. Rate per 1,000 sq ft for general office under 50,000 sq ft; larger buildings pay $1,656 to $2,767 per 1,000 sq ft by size, and medical office has its own rate. Charged on the net increase over the highest prior use. Rates unchanged since 2019.
    $3.29/sq ft
Total (Redington Shores): $3.29/sq ft + $1,056.00 one-time (≈ $83,356.00 at 25,000 sq ft)
Sources last checked Official fee schedules:Pinellas County Utilities Town of Redington Shores Pinellas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Redington Shores Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Redington Shores Impact Fee FAQs

What are the total impact fees for a single-family home in Redington Shores, Florida?

A new single-family home in Redington Shores pays at least $4,900.00 per unit in combined impact fees (rates sourced July 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Redington Shores?

Commercial development in Redington Shores pays $3.40 per square foot in impact fees, plus $1,056.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $170,856.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Redington Shores charge its own impact fees?

Yes. Redington Shores levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Redington Shores, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pinellas County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000