St. Petersburg, Florida Impact Fees

St. Petersburg applies its own fee schedule: municipal fees plus the Pinellas County-levied fees that apply inside city limits. Combined, a new single-family home pays $5,074.89 per unit (rates sourced July 25, 2026). The full breakdown is below.

St. Petersburg impact fees by project type

St. Petersburg: Single-Family Impact Fees

A new single-family home in St. Petersburg pays $5,074.89 per unit in impact fees (rates sourced July 25, 2026). Of that, Pinellas County-levied fees account for $1,679.00 and municipal or utility fees for $3,395.89.

The largest line items are Sewer Capacity Fee (City of St. Petersburg) - 2 WC x $1,000/WC ($2,000.00), Multimodal Impact Fee (Pinellas County — Schedule A) ($1,679.00) and Water Connection Charge (City of St. Petersburg) ($1,395.89).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,395.89
  • Water Connection Charge (City of St. Petersburg)
    City of St. Petersburg
    St. Petersburg water connection charge, 5/8 in. x 3/4 in. meter = $1,395.89. FY2026 rates, effective 10/1/2025 - 9/30/2026 (city's posted current utility rates schedule). Charged PER METER, not per dwelling unit: 1 in. = $1,668.99; 1.5 in. = $5,098.02; 2 in.+ = actual cost. Outside-city = 125% of city rate. FY2027 rates are adopted at the 8/27/2026 public hearing, effective 10/1/2026 - recheck after that date.
    $1,395.89
Sewer$2,000.00
  • Sewer Capacity Fee (City of St. Petersburg) - 2 WC x $1,000/WC
    City of St. Petersburg
    St. Petersburg's sewer capacity fee is $1,000.00 PER WATER CLOSET (Code Sec. 27-250(a)(1); Ord. 617-H Sec. 15, adopted 9/4/2025, effective 10/1/2025) - it is NOT a flat per-dwelling rate. Amount shown is modeled on the canonical 2-bath dwelling = 2 WC. The same per-WC rate applies to single-family, apartment, condominium and mobile home, so a 1-bath MF unit pays $1,000. 25% surcharge outside the city (Sec. 27-250(a)(4)); affordable-housing waiver at (f). The fee phased up from $350 and now reads a flat $1,000.
    $2,000.00
City$0.00
  • Municipal Impact Fees (City of St. Petersburg — None beyond MIF)
    City of St. Petersburg
    Per city: 'The City only collects impact fees to fund transportation improvements. The City does not collect impact fees to fund other public facilities (parks, schools, etc.).' Only the countywide MIF (entered as County) applies. City runs own water & sewer utility (impact fees entered separately).
    $0.00
County$1,679.00
  • Multimodal Impact Fee (Pinellas County — Schedule A)
    Single-family 1,501–2,499 sq ft
    Pinellas County / City of St. Petersburg
    Pinellas County Countywide Multimodal Impact Fee — Land Development Code Ch. 150 Art. II §150-40, Schedule A (non-downtown). St. Pete collects only transportation (MIF) impact fees. Canonical 2,000 sf SF house = 1,501–2,499 sf tier = $1,679/DU (default). Full SF Schedule A: 0–1,500 sf $1,356; 1,501–2,499 sf $1,679; 2,500 sf & over $2,066. MF flat $1,420/DU. Credit for highest prior use since 1986. Rates unchanged since Ord. 19-15 (2019). Schedule B (St. Petersburg Downtown District 11A) reduced — separate record to be added.
    $1,679.00
Total (St. Petersburg): $5,074.89
Sources last checked July 25, 2026Official fee schedules:City of St. Petersburg Pinellas County / City of St. Petersburg

St. Petersburg: Multifamily Impact Fees

A new multifamily unit in St. Petersburg pays $4,815.89 per unit in impact fees (rates sourced July 25, 2026). Of that, Pinellas County-levied fees account for $1,420.00 and municipal or utility fees for $3,395.89.

The largest line items are Sewer Capacity Fee (City of St. Petersburg, MF) - 2 WC x $1,000/WC ($2,000.00), Multimodal Impact Fee (Pinellas County — Schedule A, MF) ($1,420.00) and Water Connection Charge (City of St. Petersburg, MF) ($1,395.89).

View the full fee schedule
Water$1,395.89
  • Water Connection Charge (City of St. Petersburg, MF)
    City of St. Petersburg
    VERIFIED 8/3/2026. St. Petersburg FY2026 rate page (eff. 10/1/2025–9/30/2026): water connection charge 5/8"×3/4" = $1,395.89 (1" $1,668.99; 1.5" $5,098.02; 2"+ actual cost) — per METER connection; the meter-based structure is the documented published basis (per-unit for individually-metered units). ⚠️ FY2027 rates go to City Council 8/27/2026 — RE-CHECK AFTER.
    $1,395.89
Sewer$2,000.00
  • Sewer Capacity Fee (City of St. Petersburg, MF) - 2 WC x $1,000/WC
    City of St. Petersburg
    St. Petersburg's sewer capacity fee is $1,000.00 PER WATER CLOSET (Code Sec. 27-250(a)(1), which expressly names 'apartment, condominium'; Ord. 617-H, adopted 9/4/2025, eff. 10/1/2025). MF therefore scales by bathroom count, NOT by dwelling unit: a 1-bath apartment pays $1,000. Amount shown is modeled on the canonical 2BR/2BA unit = 2 WC. 25% surcharge outside city.
    $2,000.00
City$0.00
County$1,420.00
  • Multimodal Impact Fee (Pinellas County — Schedule A, MF)
    Pinellas County / City of St. Petersburg
    Pinellas County Countywide MIF, §150-40 Schedule A (non-downtown). Multi-family $1,420/DU (CORRECTED from $2,066 — confirmed on Municode Schedule A: SF $2,066 but multi-family $1,420). St. Pete collects only transportation (MIF) impact fees. Schedule B (Downtown) reduced. Frozen per SB 180 until ≥10/1/2027.
    $1,420.00
Total (St. Petersburg): $4,815.89
Sources last checked July 25, 2026Official fee schedules:City of St. Petersburg Pinellas County / City of St. Petersburg

Where in Pinellas County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Petersburg: Commercial Impact Fees

Commercial development in St. Petersburg pays $3.40 per square foot in impact fees, plus $2,668.99 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 50,000 sq ft building, that comes to about $172,468.99. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of St. Petersburg, Nonresidential) — 1" meter ($1,668.99 one-time), Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Commercial) ($3.40/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,668.99 one-time
Sewer$1,000.00 one-time
  • Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet
    City of St. Petersburg
    City of St. Petersburg Sewer Capacity Fee, Code Sec. 27-250 (Ord. 617-H, eff 10/1/2025). Commercial structures = $1,000.00 PER WATER CLOSET (27-250(a)(2)); 1-WC minimum = $1,000 entered as default. Fee scales with WC count. EXCLUDED high-demand commercial (restaurants, theaters, carwashes, laundries) and all industrial (27-250(a)(3)) are determined by gallons/demand on the system, not per-WC. 25% surcharge outside city; affordable-housing waiver at (e).
    $1,000.00 one-time
City$0.00
  • Municipal Impact Fee (City of St. Petersburg, Commercial)
    City of St. Petersburg
    City of St. Petersburg collects impact fees ONLY to fund transportation improvements (the countywide Pinellas Multimodal Impact Fee, entered as County). Per the city: it does NOT collect impact fees for parks, schools or other public facilities. No separate municipal non-utility impact fee — confirmed $0. $0 placeholder.
    $0.00
County$3.40/sq ft
  • Multimodal Impact Fee (Pinellas County, Commercial)
    Pinellas County
    Pinellas County Multimodal Impact Fee, Schedule A (General/non-downtown), Code §150-40(c). Schedule row: General Commercial 'Under 100,000 sq. ft.' = $3,396 per 1,000 sf. St. Petersburg has a mapped downtown district where Schedule B applies (Commercial $2,079 per 1,000 sf); Schedule A is citywide default. The city's only impact fee is this transportation/multimodal fee. Frozen per SB 180 until Oct 2027.
    $3.40/sq ft
Total (St. Petersburg): $3.40/sq ft + $2,668.99 one-time (≈ $172,468.99 at 50,000 sq ft)
Sources last checked July 25, 2026Official fee schedules:City of St. Petersburg Pinellas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Petersburg: Industrial Impact Fees

Industrial development in St. Petersburg pays $1.41 per square foot in impact fees, plus $2,668.99 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 50,000 sq ft building, that comes to about $73,368.99. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of St. Petersburg, Nonresidential) — 1" meter ($1,668.99 one-time), Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Industrial) ($1.41/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,668.99 one-time
Sewer$1,000.00 one-time
  • Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet
    City of St. Petersburg
    City of St. Petersburg Sewer Capacity Fee, Code Sec. 27-250 (Ord. 617-H, eff 10/1/2025). Commercial structures = $1,000.00 PER WATER CLOSET (27-250(a)(2)); 1-WC minimum = $1,000 entered as default. Fee scales with WC count. EXCLUDED high-demand commercial (restaurants, theaters, carwashes, laundries) and all industrial (27-250(a)(3)) are determined by gallons/demand on the system, not per-WC. 25% surcharge outside city; affordable-housing waiver at (e).
    $1,000.00 one-time
City$0.00
County$1.41/sq ft
  • Multimodal Impact Fee (Pinellas County, Industrial)
    Pinellas County
    Pinellas County Multimodal Impact Fee, Schedule A, Code §150-40(c). Schedule row: General industrial = $1,414 per 1,000 sf. St. Petersburg downtown district = Schedule B ($1,137 per 1,000 sf Industrial); Schedule A is citywide default. Frozen per SB 180 until Oct 2027.
    $1.41/sq ft
Total (St. Petersburg): $1.41/sq ft + $2,668.99 one-time (≈ $73,368.99 at 50,000 sq ft)
Sources last checked July 25, 2026Official fee schedules:City of St. Petersburg Pinellas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

St. Petersburg: Office Impact Fees

Office development in St. Petersburg pays $3.29 per square foot in impact fees, plus $2,668.99 in one-time water and sewer connection fees (rates sourced July 25, 2026).

For a 25,000 sq ft building, that comes to about $84,968.99. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection Charge (City of St. Petersburg, Nonresidential) — 1" meter ($1,668.99 one-time), Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet ($1,000.00 one-time) and Multimodal Impact Fee (Pinellas County, Office) ($3.29/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$1,668.99 one-time
Sewer$1,000.00 one-time
  • Sewer Capacity Fee (City of St. Petersburg, Nonresidential) — per water closet
    City of St. Petersburg
    City of St. Petersburg Sewer Capacity Fee, Code Sec. 27-250 (Ord. 617-H, eff 10/1/2025). Commercial structures = $1,000.00 PER WATER CLOSET (27-250(a)(2)); 1-WC minimum = $1,000 entered as default. Fee scales with WC count. EXCLUDED high-demand commercial (restaurants, theaters, carwashes, laundries) and all industrial (27-250(a)(3)) are determined by gallons/demand on the system, not per-WC. 25% surcharge outside city; affordable-housing waiver at (e).
    $1,000.00 one-time
City$0.00
County$3.29/sq ft
  • Multimodal Impact Fee (Pinellas County, Office)
    Pinellas County
    Pinellas County Multimodal Impact Fee, Schedule A, Code §150-40(c). Schedule row: General Office '0–49,999 sq. ft.' = $3,292 per 1,000 sf. St. Petersburg downtown district = Schedule B ($2,648 per 1,000 sf Office); Schedule A is citywide default. Frozen per SB 180 until Oct 2027.
    $3.29/sq ft
Total (St. Petersburg): $3.29/sq ft + $2,668.99 one-time (≈ $84,968.99 at 25,000 sq ft)
Sources last checked July 25, 2026Official fee schedules:City of St. Petersburg Pinellas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Pinellas County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Estimate your project in St. Petersburg

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in St. Petersburg, Florida?

A new single-family home in St. Petersburg pays $5,074.89 per unit in combined impact fees (rates sourced July 25, 2026).

How much are commercial impact fees in St. Petersburg?

Commercial development in St. Petersburg pays $3.40 per square foot in impact fees, plus $2,668.99 in one-time water and sewer connection fees (assuming a 1-inch meter), about $172,468.99 for a 50,000 sq ft building.

Does St. Petersburg charge its own impact fees?

Yes. St. Petersburg levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in St. Petersburg, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Pinellas County impact fees page.

Missing a jurisdiction? Get in touch.