Dallas County Impact Fees by Project Type
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Dallas County: Single-Family Impact Fees
Unincorporated Dallas County has no published impact fee amounts for a new single-family home (rates sourced November 18, 2026). The schedule below documents the status of each fee.
Sewer Connection Fee (Dallas County - Unincorporated) and Water Connection Fee (Dallas County - Unincorporated) — Wells or other provider are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Dallas County Impact Fee Schedule
- Water Connection Fee (Dallas County - Unincorporated) — Wells or other providerRequires confirmationVarious (no single retail provider)Dallas County's unincorporated area has no single water provider; service comes from adjacent municipal utilities, small water systems, or private wells depending on location. Any one-time connection fee is set by the serving provider.
- Sewer Connection Fee (Dallas County - Unincorporated)Requires confirmationVarious / on-site septic (OSSF)Dallas County's unincorporated area has no county sewer system; parcels use on-site septic or an adjacent municipal sewer provider depending on location.
- City Impact/Development Fees (Dallas County - Unincorporated)$0.00Dallas County (unincorporated)No municipal impact or development fees apply in the unincorporated area.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties cannot levy Chapter 395 impact fees, and Dallas County charges none.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Dallas County: Multifamily Impact Fees
Unincorporated Dallas County has no published impact fee amounts for a new multifamily unit (rates sourced November 18, 2026). The schedule below documents the status of each fee.
Water Connection Fee (Dallas County - Unincorporated, MF) — Wells or other provider and Sewer Connection Fee (Dallas County - Unincorporated, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Dallas County Impact Fee Schedule
- Water Connection Fee (Dallas County - Unincorporated, MF) — Wells or other providerRequires confirmationVarious (no single retail provider)No single water provider in the unincorporated area; any connection fee is set by the serving utility.
- Sewer Connection Fee (Dallas County - Unincorporated, MF)Requires confirmationVarious / on-site septic (OSSF)No county sewer system in the unincorporated area; on-site septic or an adjacent municipal provider depending on location.
- City Impact/Development Fees (Dallas County - Unincorporated, MF)$0.00Dallas County (unincorporated)No municipal impact or development fees apply in the unincorporated area.
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties cannot levy Chapter 395 impact fees, and Dallas County charges none.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Dallas County: Commercial Impact Fees
Commercial development in unincorporated Dallas County pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Dallas County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dallas County Impact Fee Schedule
- Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU$3,000.00 one-timeRequires confirmationCombine Water Supply CorporationCombine Water Supply Corporation, the largest non-city water system serving unincorporated Dallas County, charges a one-time equity buy-in fee of $1,200 per service unit; a 1-inch meter counts as 2.5 service units. A refundable membership fee and a cost-based service installation fee are also charged. Parcels near a city may instead be served by that city's utility, and most unincorporated parcels use on-site septic.
- Sewer Connection Fee (Dallas County - Unincorporated)Requires confirmationDallas CountyDallas County runs no sewer utility. Most unincorporated parcels use on-site septic systems; a parcel next to a city may connect to that city's sewer under its outside-city terms.
- City Impact Fee (Dallas County - Unincorporated, Commercial)$0.00Dallas CountyNo municipal impact fees apply in unincorporated Dallas County. Roadway impact fees under Texas law are limited to city limits, and the county cannot levy impact fees.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Dallas County: Industrial Impact Fees
Industrial development in unincorporated Dallas County pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 50,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Dallas County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dallas County Impact Fee Schedule
- Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU$3,000.00 one-timeRequires confirmationCombine Water Supply CorporationCombine Water Supply Corporation, the largest non-city water system serving unincorporated Dallas County, charges a one-time equity buy-in fee of $1,200 per service unit; a 1-inch meter counts as 2.5 service units. A refundable membership fee and a cost-based service installation fee are also charged. Parcels near a city may instead be served by that city's utility, and most unincorporated parcels use on-site septic.
- Sewer Connection Fee (Dallas County - Unincorporated)Requires confirmationDallas CountyDallas County runs no sewer utility. Most unincorporated parcels use on-site septic systems; a parcel next to a city may connect to that city's sewer under its outside-city terms.
- City Impact Fee (Dallas County - Unincorporated, Industrial)$0.00Dallas CountyNo municipal impact fees apply in unincorporated Dallas County. Roadway impact fees under Texas law are limited to city limits, and the county cannot levy impact fees.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Dallas County: Office Impact Fees
Office development in unincorporated Dallas County pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (rates sourced November 18, 2026).
For a 25,000 sq ft building, that comes to at least $3,000.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Dallas County - Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Dallas County Impact Fee Schedule
- Water Equity Buy-In Fee (Combine WSC) — 1" meter, 2.5 SU × $1,200/SU$3,000.00 one-timeRequires confirmationCombine Water Supply CorporationCombine Water Supply Corporation, the largest non-city water system serving unincorporated Dallas County, charges a one-time equity buy-in fee of $1,200 per service unit; a 1-inch meter counts as 2.5 service units. A refundable membership fee and a cost-based service installation fee are also charged. Parcels near a city may instead be served by that city's utility, and most unincorporated parcels use on-site septic.
- Sewer Connection Fee (Dallas County - Unincorporated)Requires confirmationDallas CountyDallas County runs no sewer utility. Most unincorporated parcels use on-site septic systems; a parcel next to a city may connect to that city's sewer under its outside-city terms.
- City Impact Fee (Dallas County - Unincorporated, Office)$0.00Dallas CountyNo municipal impact fees apply in unincorporated Dallas County. Roadway impact fees under Texas law are limited to city limits, and the county cannot levy impact fees.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Dallas County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Dallas County Impact Fee FAQs
How much are commercial impact fees in Dallas County?
Commercial development in unincorporated Dallas County pays no per-square-foot impact fees, but owes $3,000.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Do cities in Dallas County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 24 of 25 cities in Dallas County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.