Seagoville Impact Fees by Project Type
Seagoville: Single-Family Impact Fees
A new single-family home in Seagoville pays $4,300.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Seagoville) — 1" tap ($1,650.00), Sewer Tap Fee (City of Seagoville) — 4" tap ($1,400.00) and Park Development Fee (City of Seagoville) ($500.00).
Sewer Capital Recovery Fee (City of Seagoville) and Water Capital Recovery Fee (City of Seagoville) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Seagoville Impact Fee Schedule
- Water Tap Fee (City of Seagoville) — 1" tap$1,650.00City of SeagovilleCity water tap, short-side connection, standard 1 in. service: $1,650 (1-1/2 in. $1,850, 2 in. $2,200). Road bores and long-side taps are billed at actual cost.
- Water Meter Fee (City of Seagoville) — 5/8" x 3/4" meter$450.00City of SeagovilleRadio-read water meter with installation: $450 for a 5/8 in. x 3/4 in. meter (1 in. $600, 1-1/2 in. $950, 2 in. $1,200).
- Water Capital Recovery Fee (City of Seagoville)$150.00Requires confirmationCity of SeagovilleSeagoville has no Chapter 395 water impact fee. Its code sets a $150 per-service capital recovery fee listed for retail, commercial and industrial service; whether it reaches homes is not stated. A water tap and meter fee also applies.
- Sewer Tap Fee (City of Seagoville) — 4" tap$1,400.00City of SeagovilleCity sewer tap: $1,400 for a standard 4 in. service (6 in. $1,650, 8 in. $1,950).
- Sewer Capital Recovery Fee (City of Seagoville)$150.00Requires confirmationCity of SeagovilleSeagoville has no Chapter 395 wastewater impact fee. Its code sets a $150 per-service capital recovery fee listed for retail, commercial and industrial service; whether it reaches homes is not stated. A sewer tap fee also applies.
- Park Development Fee (City of Seagoville)$500.00City of SeagovilleSeagoville charges a $500 per dwelling unit park development fee on residential plats. It has no Chapter 395 roadway impact fee.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Seagoville.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seagoville: Multifamily Impact Fees
A new multifamily unit in Seagoville pays $4,300.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Tap Fee (City of Seagoville, MF) — 1" tap ($1,650.00), Sewer Tap Fee (City of Seagoville, MF) — 4" tap ($1,400.00) and Park Development Fee (City of Seagoville, MF) ($500.00).
Water Capital Recovery Fee (City of Seagoville, MF) and Sewer Capital Recovery Fee (City of Seagoville, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Seagoville Impact Fee Schedule
- Water Tap Fee (City of Seagoville, MF) — 1" tap$1,650.00City of SeagovilleCity water tap, standard 1 in. service: $1,650. A building on one connection pays once; larger taps cost more.
- Water Meter Fee (City of Seagoville, MF) — 5/8" x 3/4" meter$450.00City of SeagovilleRadio-read water meter with installation: $450 for a 5/8 in. x 3/4 in. meter. A master-metered building pays once for its meter.
- Water Capital Recovery Fee (City of Seagoville, MF)$150.00Requires confirmationCity of SeagovilleCharged per water service, not per unit: a building on one connection pays once. Listed in the code for retail, commercial and industrial service. No Chapter 395 water impact fee.
- Sewer Tap Fee (City of Seagoville, MF) — 4" tap$1,400.00City of SeagovilleCity sewer tap: $1,400 for a standard 4 in. service. A building on one connection pays once; larger taps cost more.
- Sewer Capital Recovery Fee (City of Seagoville, MF)$150.00Requires confirmationCity of SeagovilleCharged per sewer service, not per unit: a building on one connection pays once. Listed in the code for retail, commercial and industrial service. No Chapter 395 wastewater impact fee.
- Park Development Fee (City of Seagoville, MF)$500.00City of SeagovilleSeagoville charges a $500 per dwelling unit park development fee on residential plats, multifamily units included. It has no Chapter 395 roadway impact fee.
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Seagoville.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seagoville: Commercial Impact Fees
Commercial development in Seagoville pays no per-square-foot impact fees, but owes $3,950.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $3,950.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Tap Fee (City of Seagoville) — 1" tap ($1,650.00 one-time), Sewer Service Tap Fee (City of Seagoville) — 4" tap ($1,400.00 one-time) and Water Meter Fee (City of Seagoville) — 1" meter ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seagoville Impact Fee Schedule
- Water Service Tap Fee (City of Seagoville) — 1" tap$1,650.00 one-timeCity of SeagovilleSeagoville one-time water service tap fee (short side): 1 inch $1,650, 1.5 inch $1,850, 2 inch $2,200. Taps over 2 inches are installed by the contractor, and road bores, road replacement and extra pipe are billed at actual cost. The water meter is a separate charge.
- Water Meter Fee (City of Seagoville) — 1" meter$600.00 one-timeCity of SeagovilleSeagoville one-time radio-read water meter fee, including meter tail, gaskets and installation: 5/8 x 3/4 inch $450, 1 inch $600, 1.5 inch $950, 2 inch $1,200. Meters over 2 inches are supplied by the contractor to City specifications.
- Water Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial water service, due before the final plat is released or, without a plat, before the building permit. A separate $150 applies to each sewer service.
- Sewer Service Tap Fee (City of Seagoville) — 4" tap$1,400.00 one-timeCity of SeagovilleSeagoville one-time sewer service tap fee by lateral size: 4 inch $1,400, 6 inch $1,650, 8 inch $1,950. Larger taps are made by the contractor, and road bores, road replacement, pipe and extra depth are billed at actual cost.
- Sewer Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial sewer service, due before the final plat is released or, without a plat, before the building permit.
- City Impact Fee (City of Seagoville, Commercial)$0.00City of SeagovilleSeagoville charges no city impact fee on commercial, office or industrial development. Its one-time utility capital recovery fee is listed with the water and sewer fees.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seagoville: Industrial Impact Fees
Industrial development in Seagoville pays no per-square-foot impact fees, but owes $3,950.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $3,950.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Tap Fee (City of Seagoville) — 1" tap ($1,650.00 one-time), Sewer Service Tap Fee (City of Seagoville) — 4" tap ($1,400.00 one-time) and Water Meter Fee (City of Seagoville) — 1" meter ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seagoville Impact Fee Schedule
- Water Service Tap Fee (City of Seagoville) — 1" tap$1,650.00 one-timeCity of SeagovilleSeagoville one-time water service tap fee (short side): 1 inch $1,650, 1.5 inch $1,850, 2 inch $2,200. Taps over 2 inches are installed by the contractor, and road bores, road replacement and extra pipe are billed at actual cost. The water meter is a separate charge.
- Water Meter Fee (City of Seagoville) — 1" meter$600.00 one-timeCity of SeagovilleSeagoville one-time radio-read water meter fee, including meter tail, gaskets and installation: 5/8 x 3/4 inch $450, 1 inch $600, 1.5 inch $950, 2 inch $1,200. Meters over 2 inches are supplied by the contractor to City specifications.
- Water Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial water service, due before the final plat is released or, without a plat, before the building permit. A separate $150 applies to each sewer service.
- Sewer Service Tap Fee (City of Seagoville) — 4" tap$1,400.00 one-timeCity of SeagovilleSeagoville one-time sewer service tap fee by lateral size: 4 inch $1,400, 6 inch $1,650, 8 inch $1,950. Larger taps are made by the contractor, and road bores, road replacement, pipe and extra depth are billed at actual cost.
- Sewer Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial sewer service, due before the final plat is released or, without a plat, before the building permit.
- City Impact Fee (City of Seagoville, Industrial)$0.00City of SeagovilleSeagoville charges no city impact fee on commercial, office or industrial development. Its one-time utility capital recovery fee is listed with the water and sewer fees.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seagoville: Office Impact Fees
Office development in Seagoville pays no per-square-foot impact fees, but owes $3,950.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $3,950.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Service Tap Fee (City of Seagoville) — 1" tap ($1,650.00 one-time), Sewer Service Tap Fee (City of Seagoville) — 4" tap ($1,400.00 one-time) and Water Meter Fee (City of Seagoville) — 1" meter ($600.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Seagoville Impact Fee Schedule
- Water Service Tap Fee (City of Seagoville) — 1" tap$1,650.00 one-timeCity of SeagovilleSeagoville one-time water service tap fee (short side): 1 inch $1,650, 1.5 inch $1,850, 2 inch $2,200. Taps over 2 inches are installed by the contractor, and road bores, road replacement and extra pipe are billed at actual cost. The water meter is a separate charge.
- Water Meter Fee (City of Seagoville) — 1" meter$600.00 one-timeCity of SeagovilleSeagoville one-time radio-read water meter fee, including meter tail, gaskets and installation: 5/8 x 3/4 inch $450, 1 inch $600, 1.5 inch $950, 2 inch $1,200. Meters over 2 inches are supplied by the contractor to City specifications.
- Water Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial water service, due before the final plat is released or, without a plat, before the building permit. A separate $150 applies to each sewer service.
- Sewer Service Tap Fee (City of Seagoville) — 4" tap$1,400.00 one-timeCity of SeagovilleSeagoville one-time sewer service tap fee by lateral size: 4 inch $1,400, 6 inch $1,650, 8 inch $1,950. Larger taps are made by the contractor, and road bores, road replacement, pipe and extra depth are billed at actual cost.
- Sewer Capital Recovery Fee (City of Seagoville)$150.00 one-timeCity of SeagovilleSeagoville charges a one-time $150 capital recovery fee for each new commercial or industrial sewer service, due before the final plat is released or, without a plat, before the building permit.
- City Impact Fee (City of Seagoville, Office)$0.00City of SeagovilleSeagoville charges no city impact fee on commercial, office or industrial development. Its one-time utility capital recovery fee is listed with the water and sewer fees.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Seagoville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Seagoville Impact Fee FAQs
What are the total impact fees for a single-family home in Seagoville, Texas?
A new single-family home in Seagoville pays $4,300.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Seagoville?
Commercial development in Seagoville pays no per-square-foot impact fees, but owes $3,950.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Seagoville charge its own impact fees?
Yes. Seagoville levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Seagoville. The schedule on this page shows every fee that applies to development in Seagoville.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.