Skip to content
IMPACTFEES.ORG

Duncanville, Texas Impact Fees

Duncanville applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $4,200.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Duncanville Impact Fees by Project Type

Duncanville: Single-Family Impact Fees

A new single-family home in Duncanville pays at least $4,200.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Duncanville) — 4" service line ($2,000.00), Water Tap Fee (City of Duncanville) — 1" tap ($1,600.00) and Water Connection Fee (City of Duncanville) — 3/4" meter ($400.00).

City Impact/Development Fees (City of Duncanville) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Duncanville Impact Fee Schedule
Water$2,000.00
  • Water Tap Fee (City of Duncanville) — 1" tap
    City of Duncanville
    For a new water service installed by the City, Duncanville adds a tap fee to the connection fee: 1 inch $1,600 and 2 inch $2,000 (fiscal year 2026-27, effective October 1, 2026), plus pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. Taps larger than 2 inches are total cost plus 10%. No tap fee applies where a service already exists.
    $1,600.00
  • Water Connection Fee (City of Duncanville) — 3/4" meter
    City of Duncanville
    Duncanville has no Chapter 395 water impact fee. Its fiscal year 2026-27 master fee schedule (effective October 1, 2026, unchanged from 2025-26) sets a water connection fee by meter size, based on the cost of the meter: 3/4 inch $400, 1 inch $600, 1.5 inch $1,000, 2 inch $1,500, 3 inch $2,000, 4 inch $2,500. A new City-installed service also pays the water tap fee.
    $400.00
Sewer$2,200.00
  • Sewer Tap Fee (City of Duncanville) — 4" service line
    City of Duncanville
    For a new sewer service line, Duncanville adds a tap fee to the connection fee covering up to 25 feet of line: 4 inch $2,000 and 6 inch $2,500 (fiscal year 2026-27, effective October 1, 2026), plus $40 per additional linear foot and pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. No tap fee applies where a service already exists.
    $2,000.00
  • Sewer Connection Fee (City of Duncanville)
    City of Duncanville
    Duncanville has no Chapter 395 wastewater impact fee. Connecting a home's private sewer to City sewer available near the property line is $200 (fiscal year 2026-27, effective October 1, 2026); a new sewer service line also pays the sewer tap fee.
    $200.00
City$0.00
County$0.00
Total (Duncanville): $4,200.00
Sources last checked Official fee schedules:City of Duncanville Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Duncanville: Multifamily Impact Fees

A new multifamily unit in Duncanville pays at least $4,200.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Tap Fee (City of Duncanville, MF) — 4" service line ($2,000.00), Water Tap Fee (City of Duncanville, MF) — 1" tap ($1,600.00) and Water Connection Fee (City of Duncanville, MF) — 3/4" meter ($400.00).

City Impact/Development Fees (City of Duncanville, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Duncanville Impact Fee Schedule
Water$2,000.00
  • Water Tap Fee (City of Duncanville, MF) — 1" tap
    City of Duncanville
    For a new water service installed by the City, Duncanville adds a tap fee to the connection fee: 1 inch $1,600 and 2 inch $2,000 (fiscal year 2026-27, effective October 1, 2026), plus pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. The fee is per tap, so a building on one service pays once. No tap fee applies where a service already exists.
    $1,600.00
  • Water Connection Fee (City of Duncanville, MF) — 3/4" meter
    City of Duncanville
    Duncanville has no Chapter 395 water impact fee. Its fiscal year 2026-27 master fee schedule (effective October 1, 2026, unchanged from 2025-26) sets a water connection fee by meter size, based on the cost of the meter: 3/4 inch $400, 1 inch $600, 1.5 inch $1,000, 2 inch $1,500 (3 inch $2,000 and 4 inch $2,500 for larger meters). The fee is charged per meter, so a building on one meter pays once. A new City-installed service also pays the water tap fee.
    $400.00
Sewer$2,200.00
  • Sewer Tap Fee (City of Duncanville, MF) — 4" service line
    City of Duncanville
    For a new sewer service line, Duncanville adds a tap fee to the connection fee covering up to 25 feet of line: 4 inch $2,000 and 6 inch $2,500 (fiscal year 2026-27, effective October 1, 2026), plus $40 per additional linear foot and pavement repair. The fee is per service line, so a building on one line pays once. No tap fee applies where a service already exists.
    $2,000.00
  • Sewer Connection Fee (City of Duncanville, MF)
    City of Duncanville
    Duncanville has no Chapter 395 wastewater impact fee. Connecting to City sewer available near the property line is $200 per connection (fiscal year 2026-27, effective October 1, 2026), so a building on one connection pays once; a new sewer service line also pays the sewer tap fee.
    $200.00
City$0.00
County$0.00
Total (Duncanville): $4,200.00
Sources last checked Official fee schedules:City of Duncanville Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Duncanville: Commercial Impact Fees

Commercial development in Duncanville pays no per-square-foot impact fees, but owes $4,400.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $4,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Duncanville) — 4" service line ($2,000.00 one-time), Water Tap Fee (City of Duncanville) — 1" tap ($1,600.00 one-time) and Water Connection Fee (City of Duncanville) — 1" meter ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Duncanville Impact Fee Schedule
Water$2,200.00 one-time
  • Water Tap Fee (City of Duncanville) — 1" tap
    City of Duncanville
    For a new service installed by the City, Duncanville adds a water tap fee to the connection fee: 1 inch $1,600 and 2 inch $2,000 (fiscal year 2026-27, effective October 1, 2026), plus pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. Taps larger than 2 inches are total cost plus 10%. No tap fee applies where a service already exists.
    $1,600.00 one-time
  • Water Connection Fee (City of Duncanville) — 1" meter
    City of Duncanville
    Duncanville has no Chapter 395 water impact fee. Its master fee schedule for fiscal year 2026-27 (effective October 1, 2026, amounts unchanged from 2025-26) sets a water connection fee by meter size, based on the cost of the meter: 3/4 inch $400, 1 inch $600, 1.5 inch $1,000, 2 inch $1,500, 3 inch $2,000, 4 inch $2,500. A new service also pays the water tap fee.
    $600.00 one-time
Sewer$2,200.00 one-time
  • Sewer Tap Fee (City of Duncanville) — 4" service line
    City of Duncanville
    For a new sewer service, Duncanville adds a tap fee to the connection fee covering up to 25 feet of sewer line: 4 inch $2,000 and 6 inch $2,500 (fiscal year 2026-27, effective October 1, 2026), plus $40 per additional linear foot and pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. No tap fee applies where a service already exists.
    $2,000.00 one-time
  • Sewer Connection Fee (City of Duncanville)
    City of Duncanville
    Duncanville has no Chapter 395 wastewater impact fee. A nonresidential sewer connection to City sewer available near the property line is $200 (fiscal year 2026-27, effective October 1, 2026); a new service also pays the sewer tap fee.
    $200.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Duncanville): $4,400.00 one-time (≈ $4,400.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Duncanville Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Duncanville: Industrial Impact Fees

Industrial development in Duncanville pays no per-square-foot impact fees, but owes $4,400.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $4,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Duncanville) — 4" service line ($2,000.00 one-time), Water Tap Fee (City of Duncanville) — 1" tap ($1,600.00 one-time) and Water Connection Fee (City of Duncanville) — 1" meter ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Duncanville Impact Fee Schedule
Water$2,200.00 one-time
  • Water Tap Fee (City of Duncanville) — 1" tap
    City of Duncanville
    For a new service installed by the City, Duncanville adds a water tap fee to the connection fee: 1 inch $1,600 and 2 inch $2,000 (fiscal year 2026-27, effective October 1, 2026), plus pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. Taps larger than 2 inches are total cost plus 10%. No tap fee applies where a service already exists.
    $1,600.00 one-time
  • Water Connection Fee (City of Duncanville) — 1" meter
    City of Duncanville
    Duncanville has no Chapter 395 water impact fee. Its master fee schedule for fiscal year 2026-27 (effective October 1, 2026, amounts unchanged from 2025-26) sets a water connection fee by meter size, based on the cost of the meter: 3/4 inch $400, 1 inch $600, 1.5 inch $1,000, 2 inch $1,500, 3 inch $2,000, 4 inch $2,500. A new service also pays the water tap fee.
    $600.00 one-time
Sewer$2,200.00 one-time
  • Sewer Tap Fee (City of Duncanville) — 4" service line
    City of Duncanville
    For a new sewer service, Duncanville adds a tap fee to the connection fee covering up to 25 feet of sewer line: 4 inch $2,000 and 6 inch $2,500 (fiscal year 2026-27, effective October 1, 2026), plus $40 per additional linear foot and pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. No tap fee applies where a service already exists.
    $2,000.00 one-time
  • Sewer Connection Fee (City of Duncanville)
    City of Duncanville
    Duncanville has no Chapter 395 wastewater impact fee. A nonresidential sewer connection to City sewer available near the property line is $200 (fiscal year 2026-27, effective October 1, 2026); a new service also pays the sewer tap fee.
    $200.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Duncanville): $4,400.00 one-time (≈ $4,400.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Duncanville Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Duncanville: Office Impact Fees

Office development in Duncanville pays no per-square-foot impact fees, but owes $4,400.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $4,400.00. The calculator below adjusts to your exact square footage.

The largest line items are Sewer Tap Fee (City of Duncanville) — 4" service line ($2,000.00 one-time), Water Tap Fee (City of Duncanville) — 1" tap ($1,600.00 one-time) and Water Connection Fee (City of Duncanville) — 1" meter ($600.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Duncanville Impact Fee Schedule
Water$2,200.00 one-time
  • Water Tap Fee (City of Duncanville) — 1" tap
    City of Duncanville
    For a new service installed by the City, Duncanville adds a water tap fee to the connection fee: 1 inch $1,600 and 2 inch $2,000 (fiscal year 2026-27, effective October 1, 2026), plus pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. Taps larger than 2 inches are total cost plus 10%. No tap fee applies where a service already exists.
    $1,600.00 one-time
  • Water Connection Fee (City of Duncanville) — 1" meter
    City of Duncanville
    Duncanville has no Chapter 395 water impact fee. Its master fee schedule for fiscal year 2026-27 (effective October 1, 2026, amounts unchanged from 2025-26) sets a water connection fee by meter size, based on the cost of the meter: 3/4 inch $400, 1 inch $600, 1.5 inch $1,000, 2 inch $1,500, 3 inch $2,000, 4 inch $2,500. A new service also pays the water tap fee.
    $600.00 one-time
Sewer$2,200.00 one-time
  • Sewer Tap Fee (City of Duncanville) — 4" service line
    City of Duncanville
    For a new sewer service, Duncanville adds a tap fee to the connection fee covering up to 25 feet of sewer line: 4 inch $2,000 and 6 inch $2,500 (fiscal year 2026-27, effective October 1, 2026), plus $40 per additional linear foot and pavement repair at $15.00 per sq ft of sidewalk and $20.00 per sq ft of street. No tap fee applies where a service already exists.
    $2,000.00 one-time
  • Sewer Connection Fee (City of Duncanville)
    City of Duncanville
    Duncanville has no Chapter 395 wastewater impact fee. A nonresidential sewer connection to City sewer available near the property line is $200 (fiscal year 2026-27, effective October 1, 2026); a new service also pays the sewer tap fee.
    $200.00 one-time
City$0.00
  • City Impact Fee (City of Duncanville, Office)
    City of Duncanville
    Duncanville has not adopted a Chapter 395 roadway, water or wastewater impact fee. Texas law allows no city impact fees for parks, fire, police or other general services.
    $0.00
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Duncanville): $4,400.00 one-time (≈ $4,400.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Duncanville Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Duncanville Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Duncanville Impact Fee FAQs

What are the total impact fees for a single-family home in Duncanville, Texas?

A new single-family home in Duncanville pays at least $4,200.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Duncanville?

Commercial development in Duncanville pays no per-square-foot impact fees, but owes $4,400.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Duncanville charge its own impact fees?

Yes. Duncanville levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Duncanville. The schedule on this page shows every fee that applies to development in Duncanville.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.