Grand Prairie Impact Fees by Project Type
Grand Prairie: Single-Family Impact Fees
A new single-family home in Grand Prairie pays at least $8,454.78 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Grand Prairie) — South Sector, 5/8" ($4,676.00), Wastewater Impact Fee (City of Grand Prairie) — South Sector, 5/8" ($1,624.00) and Sewer Tap Fee (City of Grand Prairie) ($1,250.00).
City Impact/Development Fees (City of Grand Prairie) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Grand Prairie Impact Fee Schedule
- Water Impact Fee (City of Grand Prairie) — South Sector, 5/8"$4,676.00City of Grand PrairieGrand Prairie water impact fee, South Sector, for a 5/8 in. meter (one service unit, a single-family home). This is the higher of the city's 2 service areas; the North Sector rate is lower. Larger meters pay more. A separate water tap fee applies on top.
- Water Tap Fee (City of Grand Prairie) — 3/4" tap$897.78City of Grand PrairieOne-time water tap fee including the meter, by size ($897.78 for a 3/4 in. tap), charged in addition to the water impact fee. Service lines over 35 feet add $9 to $12 per foot (60 feet maximum). On a lot with an existing tap, only the meter charge applies.
- Wastewater Impact Fee (City of Grand Prairie) — South Sector, 5/8"$1,624.00City of Grand PrairieGrand Prairie wastewater impact fee, South Sector, for a 5/8 in. water meter (one service unit, a single-family home). This is the higher of the city's 2 service areas; the North Sector rate is lower. Larger meters pay more. A separate sewer tap fee applies on top.
- Sewer Tap Fee (City of Grand Prairie)$1,250.00City of Grand PrairieOne-time sewer tap fee, charged in addition to the wastewater impact fee. Taps longer than 35 feet add $35 per foot; taps deeper than 10 feet are installed by a bonded contractor.
- Disaster Warning Siren Fee (City of Grand Prairie)$7.00City of Grand PrairieOne-time early warning siren fee of $7 per single-family lot, paid at platting or, for an existing vacant lot, at building permit.
- City Impact/Development Fees (City of Grand Prairie)Requires confirmationCity of Grand PrairieGrand Prairie levies no roadway impact fee. Water and wastewater impact fees, tap fees and a siren fee are listed separately; any parkland dedication requirement sits in the development code.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Grand Prairie.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grand Prairie: Multifamily Impact Fees
A new multifamily unit in Grand Prairie pays at least $8,447.78 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Grand Prairie, MF) — South Sector, 5/8" ($4,676.00), Wastewater Impact Fee (City of Grand Prairie, MF) — South Sector, 5/8" ($1,624.00) and Sewer Tap Fee (City of Grand Prairie, MF) ($1,250.00).
Disaster Warning Siren Fee (City of Grand Prairie, MF) and City Impact/Development Fees (City of Grand Prairie, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Grand Prairie Impact Fee Schedule
- Water Impact Fee (City of Grand Prairie, MF) — South Sector, 5/8"$4,676.00City of Grand PrairieGrand Prairie water impact fee, South Sector (the higher of 2 service areas), by meter size: a master-metered apartment building pays once at its meter size. Shown at a 5/8 in. meter.
- Water Tap Fee (City of Grand Prairie, MF) — 3/4" tap$897.78City of Grand PrairieOne-time water tap fee including the meter: $897.78 for a 3/4 in. tap. A building on one connection pays once; larger taps cost more.
- Wastewater Impact Fee (City of Grand Prairie, MF) — South Sector, 5/8"$1,624.00City of Grand PrairieGrand Prairie wastewater impact fee, South Sector (the higher of 2 service areas), by water meter size: a master-metered apartment building pays once at its meter size. Shown at a 5/8 in. meter.
- Sewer Tap Fee (City of Grand Prairie, MF)$1,250.00City of Grand PrairieOne-time sewer tap fee of $1,250; a building on one connection pays once.
- Disaster Warning Siren Fee (City of Grand Prairie, MF)Requires confirmationCity of Grand PrairieMultifamily development pays a one-time early warning siren fee per acre platted, based on the city's current siren bid cost; the per-acre rate is not published.
- City Impact/Development Fees (City of Grand Prairie, MF)Requires confirmationCity of Grand PrairieGrand Prairie levies no roadway impact fee. Water and wastewater impact fees, tap fees and a siren fee are listed separately; any parkland dedication requirement sits in the development code.
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Grand Prairie.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grand Prairie: Commercial Impact Fees
Commercial development in Grand Prairie pays no per-square-foot impact fees, but owes $21,749.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $21,749.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Grand Prairie) ($1,250.00 one-time) and Water Tap Fee (City of Grand Prairie) — 1" tap with meter ($997.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter and Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Disaster Warning Siren Fee (City of Grand Prairie, Commercial) — per acre platted is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Grand Prairie Impact Fee Schedule
- Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter$11,640.00 one-timeRequires confirmationCity of Grand PrairieChapter 395 water impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $4,278). Assessed at plat and collected at building permit or utility connection. A separate water tap and meter fee also applies.
- Water Tap Fee (City of Grand Prairie) — 1" tap with meter$997.00 one-timeCity of Grand PrairieCity water tap with a 1 inch meter: $997, plus $9 per foot of service over 35 feet (60 foot maximum). On an existing tap, only the meter is charged ($200 for 1 inch). For 3 inch and larger meters the owner provides a City approved meter. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter$7,862.50 one-timeRequires confirmationCity of Grand PrairieChapter 395 wastewater impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $2,107.50). Assessed at plat and collected at building permit or utility connection. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Grand Prairie)$1,250.00 one-timeCity of Grand PrairieCity wastewater tap: $1,250 for a service under 35 feet long and under 10 feet deep, plus $35 per foot over 35 feet. Taps deeper than 10 feet are installed by a bonded contractor under a construction permit. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Grand Prairie, Commercial)$0.00City of Grand PrairieGrand Prairie has not adopted a Chapter 395 roadway impact fee; its impact fees are for water and wastewater only. Texas law allows no city impact fees for parks, fire, police or other general services.
- Disaster Warning Siren Fee (City of Grand Prairie, Commercial) — per acre plattedRequires confirmationCity of Grand PrairieGrand Prairie charges a Disaster Warning Siren Fee on new development in the city and its extraterritorial jurisdiction: acres platted times a cost per acre based on the last bid siren (the code's example is $27.73 per acre for a $50,000 siren). Paid before the plat is filed, or at building permit on an existing platted lot.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grand Prairie: Industrial Impact Fees
Industrial development in Grand Prairie pays no per-square-foot impact fees, but owes $21,749.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $21,749.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Grand Prairie) ($1,250.00 one-time) and Water Tap Fee (City of Grand Prairie) — 1" tap with meter ($997.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter and Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Disaster Warning Siren Fee (City of Grand Prairie, Industrial) — per acre platted is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Grand Prairie Impact Fee Schedule
- Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter$11,640.00 one-timeRequires confirmationCity of Grand PrairieChapter 395 water impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $4,278). Assessed at plat and collected at building permit or utility connection. A separate water tap and meter fee also applies.
- Water Tap Fee (City of Grand Prairie) — 1" tap with meter$997.00 one-timeCity of Grand PrairieCity water tap with a 1 inch meter: $997, plus $9 per foot of service over 35 feet (60 foot maximum). On an existing tap, only the meter is charged ($200 for 1 inch). For 3 inch and larger meters the owner provides a City approved meter. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter$7,862.50 one-timeRequires confirmationCity of Grand PrairieChapter 395 wastewater impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $2,107.50). Assessed at plat and collected at building permit or utility connection. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Grand Prairie)$1,250.00 one-timeCity of Grand PrairieCity wastewater tap: $1,250 for a service under 35 feet long and under 10 feet deep, plus $35 per foot over 35 feet. Taps deeper than 10 feet are installed by a bonded contractor under a construction permit. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Grand Prairie, Industrial)$0.00City of Grand PrairieGrand Prairie has not adopted a Chapter 395 roadway impact fee; its impact fees are for water and wastewater only. Texas law allows no city impact fees for parks, fire, police or other general services.
- Disaster Warning Siren Fee (City of Grand Prairie, Industrial) — per acre plattedRequires confirmationCity of Grand PrairieGrand Prairie charges a Disaster Warning Siren Fee on new development in the city and its extraterritorial jurisdiction: acres platted times a cost per acre based on the last bid siren (the code's example is $27.73 per acre for a $50,000 siren). Paid before the plat is filed, or at building permit on an existing platted lot.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grand Prairie: Office Impact Fees
Office development in Grand Prairie pays no per-square-foot impact fees, but owes $21,749.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $21,749.50. The calculator below adjusts to your exact square footage.
The largest line items are Sewer Tap Fee (City of Grand Prairie) ($1,250.00 one-time) and Water Tap Fee (City of Grand Prairie) — 1" tap with meter ($997.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter and Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Disaster Warning Siren Fee (City of Grand Prairie, Office) — per acre platted is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Grand Prairie Impact Fee Schedule
- Water Impact Fee (City of Grand Prairie) — South Sector, 1" meter$11,640.00 one-timeRequires confirmationCity of Grand PrairieChapter 395 water impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $4,278). Assessed at plat and collected at building permit or utility connection. A separate water tap and meter fee also applies.
- Water Tap Fee (City of Grand Prairie) — 1" tap with meter$997.00 one-timeCity of Grand PrairieCity water tap with a 1 inch meter: $997, plus $9 per foot of service over 35 feet (60 foot maximum). On an existing tap, only the meter is charged ($200 for 1 inch). For 3 inch and larger meters the owner provides a City approved meter. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Grand Prairie) — South Sector, 1" meter$7,862.50 one-timeRequires confirmationCity of Grand PrairieChapter 395 wastewater impact fee under Unified Development Code Article 22, Schedule 22.3-1a, as updated September 2, 2025 (2024 impact fee study). Charged by meter size: a 1 inch meter is 2.5 service units. The city has two service sectors; this is the South Sector rate, the higher of the two (North Sector 1 inch: $2,107.50). Assessed at plat and collected at building permit or utility connection. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Grand Prairie)$1,250.00 one-timeCity of Grand PrairieCity wastewater tap: $1,250 for a service under 35 feet long and under 10 feet deep, plus $35 per foot over 35 feet. Taps deeper than 10 feet are installed by a bonded contractor under a construction permit. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Grand Prairie, Office)$0.00City of Grand PrairieGrand Prairie has not adopted a Chapter 395 roadway impact fee; its impact fees are for water and wastewater only. Texas law allows no city impact fees for parks, fire, police or other general services.
- Disaster Warning Siren Fee (City of Grand Prairie, Office) — per acre plattedRequires confirmationCity of Grand PrairieGrand Prairie charges a Disaster Warning Siren Fee on new development in the city and its extraterritorial jurisdiction: acres platted times a cost per acre based on the last bid siren (the code's example is $27.73 per acre for a $50,000 siren). Paid before the plat is filed, or at building permit on an existing platted lot.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Grand Prairie Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Grand Prairie Impact Fee FAQs
What are the total impact fees for a single-family home in Grand Prairie, Texas?
A new single-family home in Grand Prairie pays at least $8,454.78 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Grand Prairie?
Commercial development in Grand Prairie pays no per-square-foot impact fees, but owes $21,749.50 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Does Grand Prairie charge its own impact fees?
Yes. Grand Prairie levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Grand Prairie. The schedule on this page shows every fee that applies to development in Grand Prairie.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.