Dallas, Texas Impact Fees

Dallas applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $931.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Dallas Impact Fees by Project Type

Dallas: Single-Family Impact Fees

A new single-family home in Dallas pays at least $931.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Water Service Inspection Fee (City of Dallas) and Wastewater Lateral Inspection Fee (City of Dallas) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Park Land Dedication Fee in Lieu (City of Dallas) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dallas Impact Fee Schedule
Water$465.50
  • Water Service Inspection Fee (City of Dallas)
    Dallas Water Utilities (City of Dallas)
    Dallas no longer installs new water services with City crews (since October 1, 2024): a bonded contractor installs the service and the City charges a one-time inspection fee of $465.50 for services 2 inches and smaller, per the October 2025 fee sheet. The contractor's installation price is separate. Dallas levies no Chapter 395 water impact fee.
    $465.50Requires confirmation
Sewer$465.50
  • Wastewater Lateral Inspection Fee (City of Dallas)
    Dallas Water Utilities (City of Dallas)
    Dallas no longer installs residential sewer laterals with City crews (since October 1, 2024): a bonded contractor builds the lateral and the City charges a one-time inspection fee of $465.50, per the October 2025 fee sheet. Dallas levies no Chapter 395 wastewater impact fee.
    $465.50Requires confirmation
City$0.00
  • Park Land Dedication Fee in Lieu (City of Dallas)
    City of Dallas
    Dallas park land dedication fee in lieu: 2% of Dallas median family income per single-family or duplex unit, paid at the building permit and recalculated each January 1 (Ordinance 33280, November 2025). The separate park development fee was repealed. Dallas levies no Chapter 395 roadway impact fee.
    Requires confirmation
County$0.00
  • County Impact Fees (Dallas County)
    Dallas County
    Texas counties cannot levy Chapter 395 impact fees, and Dallas County charges none. (Populous-county authority under §395.079 is limited to storm water/drainage and is not levied here.)
    $0.00
Total (Dallas): $931.00
Sources last checked Official fee schedules:Dallas Water Utilities (City of Dallas) City of Dallas Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dallas: Multifamily Impact Fees

A new multifamily unit in Dallas pays at least $931.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

Water Service Inspection Fee (City of Dallas, MF) and Wastewater Lateral Inspection Fee (City of Dallas, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Park Land Dedication Fee in Lieu (City of Dallas, MF) — 2+ bedrooms is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Dallas Impact Fee Schedule
Water$465.50
  • Water Service Inspection Fee (City of Dallas, MF)
    Dallas Water Utilities (City of Dallas)
    Dallas no longer installs new water services with City crews (since October 1, 2024): a bonded contractor installs the service and the City charges a one-time inspection fee of $465.50 per service 2 inches and smaller, so a building on one service pays once. Larger services follow a separate large-meter schedule. Dallas levies no Chapter 395 water impact fee.
    $465.50Requires confirmation
Sewer$465.50
  • Wastewater Lateral Inspection Fee (City of Dallas, MF)
    Dallas Water Utilities (City of Dallas)
    Dallas no longer installs sewer laterals with City crews (since October 1, 2024): a bonded contractor builds the lateral and the City charges a one-time inspection fee of $465.50 per lateral, per the October 2025 fee sheet, so a building on one lateral pays once. Dallas levies no Chapter 395 wastewater impact fee.
    $465.50Requires confirmation
City$0.00
  • Park Land Dedication Fee in Lieu (City of Dallas, MF) — 2+ bedrooms
    City of Dallas
    Dallas park land dedication fee in lieu for a multifamily unit with two or more bedrooms: 1.75% of Dallas median family income per unit, paid at the final certificate of occupancy and recalculated each January 1 (Ordinance 33280, November 2025). The separate park development fee was repealed.
    Requires confirmation
County$0.00
Total (Dallas): $931.00
Sources last checked Official fee schedules:Dallas Water Utilities (City of Dallas) City of Dallas Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dallas: Commercial Impact Fees

Commercial development in Dallas pays no per-square-foot impact fees, but owes $1,121.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $1,121.50. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Lateral Connection Fee (City of Dallas) and Water Service Connection Fee (City of Dallas) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Dallas, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dallas Impact Fee Schedule
Water$465.50 one-time
  • Water Service Connection Fee (City of Dallas) — 1" meter
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 water impact fee. A nonresidential water service is installed by the developer's bonded contractor at the developer's cost, and the City charges a fixed fee per service: a $465.50 inspection fee for services 2 inches and smaller (Dallas Water Utilities fee sheet), and $3,534.00 for larger domestic services (hatch $2,878 plus the $656.00 connection inspection fee that Ordinance 33564, adopted September 16, 2026, sets for services larger than 2 inches). Fire lines add a detector check charge.
    $465.50 one-timeRequires confirmation
Sewer$656.00 one-time
  • Wastewater Lateral Connection Fee (City of Dallas)
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 wastewater impact fee. A 6 inch wastewater lateral built by the developer's bonded contractor carries a connection inspection fee of $656.00 (Ordinance 33564, adopted September 16, 2026; $465.50 before); the lateral itself is at the developer's cost.
    $656.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee (City of Dallas, Commercial)
    City of Dallas
    Dallas has not adopted a Chapter 395 roadway impact fee. Texas law allows no city impact fees for parks, fire, police or other general services, and the Dallas park land dedication fee applies to residential and hotel development, not commercial, office or industrial buildings.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Dallas): $1,121.50 one-time (≈ $1,121.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Dallas (Dallas Water Utilities) City of Dallas Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dallas: Industrial Impact Fees

Industrial development in Dallas pays no per-square-foot impact fees, but owes $1,121.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $1,121.50. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Lateral Connection Fee (City of Dallas) and Water Service Connection Fee (City of Dallas) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Dallas, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dallas Impact Fee Schedule
Water$465.50 one-time
  • Water Service Connection Fee (City of Dallas) — 1" meter
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 water impact fee. A nonresidential water service is installed by the developer's bonded contractor at the developer's cost, and the City charges a fixed fee per service: a $465.50 inspection fee for services 2 inches and smaller (Dallas Water Utilities fee sheet), and $3,534.00 for larger domestic services (hatch $2,878 plus the $656.00 connection inspection fee that Ordinance 33564, adopted September 16, 2026, sets for services larger than 2 inches). Fire lines add a detector check charge.
    $465.50 one-timeRequires confirmation
Sewer$656.00 one-time
  • Wastewater Lateral Connection Fee (City of Dallas)
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 wastewater impact fee. A 6 inch wastewater lateral built by the developer's bonded contractor carries a connection inspection fee of $656.00 (Ordinance 33564, adopted September 16, 2026; $465.50 before); the lateral itself is at the developer's cost.
    $656.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee (City of Dallas, Industrial)
    City of Dallas
    Dallas has not adopted a Chapter 395 roadway impact fee. Texas law allows no city impact fees for parks, fire, police or other general services, and the Dallas park land dedication fee applies to residential and hotel development, not commercial, office or industrial buildings.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Dallas): $1,121.50 one-time (≈ $1,121.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Dallas (Dallas Water Utilities) City of Dallas Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dallas: Office Impact Fees

Office development in Dallas pays no per-square-foot impact fees, but owes $1,121.50 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $1,121.50. The calculator below adjusts to your exact square footage.

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Lateral Connection Fee (City of Dallas) and Water Service Connection Fee (City of Dallas) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

City Impact Fee (City of Dallas, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Dallas Impact Fee Schedule
Water$465.50 one-time
  • Water Service Connection Fee (City of Dallas) — 1" meter
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 water impact fee. A nonresidential water service is installed by the developer's bonded contractor at the developer's cost, and the City charges a fixed fee per service: a $465.50 inspection fee for services 2 inches and smaller (Dallas Water Utilities fee sheet), and $3,534.00 for larger domestic services (hatch $2,878 plus the $656.00 connection inspection fee that Ordinance 33564, adopted September 16, 2026, sets for services larger than 2 inches). Fire lines add a detector check charge.
    $465.50 one-timeRequires confirmation
Sewer$656.00 one-time
  • Wastewater Lateral Connection Fee (City of Dallas)
    City of Dallas (Dallas Water Utilities)
    Dallas Water Utilities serves the city and charges no Chapter 395 wastewater impact fee. A 6 inch wastewater lateral built by the developer's bonded contractor carries a connection inspection fee of $656.00 (Ordinance 33564, adopted September 16, 2026; $465.50 before); the lateral itself is at the developer's cost.
    $656.00 one-timeRequires confirmation
City$0.00
  • City Impact Fee (City of Dallas, Office)
    City of Dallas
    Dallas has not adopted a Chapter 395 roadway impact fee. Texas law allows no city impact fees for parks, fire, police or other general services, and the Dallas park land dedication fee applies to residential and hotel development, not commercial, office or industrial buildings.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Dallas): $1,121.50 one-time (≈ $1,121.50 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Dallas (Dallas Water Utilities) City of Dallas Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Dallas Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Dallas Impact Fee FAQs

What are the total impact fees for a single-family home in Dallas, Texas?

A new single-family home in Dallas pays at least $931.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Dallas?

Commercial development in Dallas pays no per-square-foot impact fees, but owes $1,121.50 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Dallas charge its own impact fees?

Yes. Dallas levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Dallas. The schedule on this page shows every fee that applies to development in Dallas.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.