Rowlett applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays $7,508.88 per unit (rates sourced ). The full breakdown is below.

Rowlett Impact Fees by Project Type

Rowlett: Single-Family Impact Fees

A new single-family home in Rowlett pays $7,508.88 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Rowlett) ($3,283.00), Water Impact Fee (City of Rowlett) ($2,253.00) and Wastewater Impact Fee (City of Rowlett) ($1,189.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Rowlett Impact Fee Schedule
Water$2,442.88
  • Water Impact Fee (City of Rowlett)
    5/8" x 3/4" meter
    City of Rowlett
    Rowlett water impact fee: $2,253 for a home on a standard 5/8 in. x 3/4 in. meter (1 service unit); larger meters pay by meter size. Rates from Ordinance ORD-035-19 as listed in the Master Fee Schedule.
    $2,253.00
  • Water Meter Connection Fee (City of Rowlett) — 5/8" x 3/4" meter
    City of Rowlett
    One-time water meter connection charge from the Master Fee Schedule: $189.88 for a 5/8 in. x 3/4 in. meter (meter, touch-read coupling and installation). Water and sewer taps are billed at actual cost of parts and labor plus 25%.
    $189.88
Sewer$1,189.00
  • Wastewater Impact Fee (City of Rowlett)
    5/8" x 3/4" meter
    City of Rowlett
    Rowlett wastewater impact fee: $1,189 for a home on a standard 5/8 in. x 3/4 in. meter (1 service unit); larger meters pay by meter size. Rates from Ordinance ORD-035-19 as listed in the Master Fee Schedule.
    $1,189.00
City$3,877.00
  • Roadway Impact Fee (City of Rowlett)
    City of Rowlett
    Rowlett Chapter 395 roadway impact fee: $3,283 per single-family home (ITE 210), the same in both roadway service areas. Rates from Ordinance ORD-035-19 as listed in the city's Master Fee Schedule.
    $3,283.00
  • Park Pro Rata Fee (City of Rowlett)
    City of Rowlett
    Rowlett park pro rata fee: $594 per single-family dwelling unit, set in the city's Master Fee Schedule under the Development Code.
    $594.00
County$0.00
Total (Rowlett): $7,508.88
Sources last checked Official fee schedules:City of Rowlett Dallas County

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rowlett: Multifamily Impact Fees

A new multifamily unit in Rowlett pays $7,000.88 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Rowlett, MF) — Service Area 1 ($3,063.00), Park Pro Rata Fee (City of Rowlett, MF) ($306.00) and Water Meter Connection Fee (City of Rowlett, MF) — 5/8" x 3/4" meter ($189.88).

Wastewater Impact Fee (City of Rowlett, MF) and Water Impact Fee (City of Rowlett, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Rowlett Impact Fee Schedule
Water$2,442.88
  • Water Impact Fee (City of Rowlett, MF)
    5/8" x 3/4" meter
    City of Rowlett
    Rowlett charges the water impact fee by meter size, not per unit: $2,253 for a 5/8 in. x 3/4 in. meter on the residential column. A master-metered apartment building pays once for its meter size (for example 2 in.: $18,024).
    $2,253.00Requires confirmation
  • Water Meter Connection Fee (City of Rowlett, MF) — 5/8" x 3/4" meter
    City of Rowlett
    One-time water meter connection charge: $189.88 for a 5/8 in. x 3/4 in. meter. A master-metered building pays once for its meter. Taps are billed at actual cost plus 25%.
    $189.88
Sewer$1,189.00
  • Wastewater Impact Fee (City of Rowlett, MF)
    5/8" x 3/4" meter
    City of Rowlett
    Rowlett charges the wastewater impact fee by meter size, not per unit: $1,189 for a 5/8 in. x 3/4 in. meter on the residential column. A master-metered apartment building pays once for its meter size (for example 2 in.: $9,512).
    $1,189.00Requires confirmation
City$3,369.00
County$0.00
Total (Rowlett): $7,000.88
Sources last checked Official fee schedules:City of Rowlett Dallas County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rowlett: Commercial Impact Fees

Commercial development in Rowlett pays $3.57 per square foot in impact fees, plus $4,616.24 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $183,066.24. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rowlett) — 1" meter ($2,817.00 one-time), Wastewater Impact Fee (City of Rowlett) — 1" meter ($1,487.00 one-time) and Water Meter Fee (City of Rowlett) — 1" meter ($312.24 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Rowlett Impact Fee Schedule
Water$3,129.24 one-time
  • Water Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential water impact fee by meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $1,127, 1 inch $2,817, 1.5 inch $5,633, 2 inch $9,012, 3 inch $19,714, 4 inch $33,795, 6 inch $76,039, 8 inch $101,385, 10 inch $394,275. Paid in addition to the City's water meter fee and tap cost.
    $2,817.00 one-time
  • Water Meter Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett one-time water meter fee by size (meter, coupling and installation): 5/8 x 3/4 inch $189.88, 1 inch $312.24, 1.5 inch $992.53, 2 inch $1,149.37, 3 inch $1,949.35, 4 inch $3,275.20, 6 inch $5,548.50. A City tap of the main is billed separately at actual cost of parts and labor plus 25%.
    $312.24 one-time
Sewer$1,487.00 one-time
  • Wastewater Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential wastewater impact fee by water meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $595, 1 inch $1,487, 1.5 inch $2,973, 2 inch $4,756, 3 inch $10,404, 4 inch $17,835, 6 inch $40,129, 8 inch $53,505, 10 inch $208,075. Sewer taps are billed at the City's actual cost of parts and labor plus 25%.
    $1,487.00 one-time
City$3.57/sq ft
  • Roadway Impact Fee (City of Rowlett, Commercial)
    City of Rowlett
    Rowlett roadway impact fee for a shopping center: $3,569 per 1,000 sq ft of gross leasable area, the same in both roadway service areas, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19). Assessed under Texas Local Government Code Chapter 395.
    $3.57/sq ft
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Rowlett): $3.57/sq ft + $4,616.24 one-time (≈ $183,066.24 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Rowlett Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rowlett: Industrial Impact Fees

Industrial development in Rowlett pays $0.64 per square foot in impact fees, plus $4,616.24 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $36,616.24. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rowlett) — 1" meter ($2,817.00 one-time), Wastewater Impact Fee (City of Rowlett) — 1" meter ($1,487.00 one-time) and Water Meter Fee (City of Rowlett) — 1" meter ($312.24 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Rowlett Impact Fee Schedule
Water$3,129.24 one-time
  • Water Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential water impact fee by meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $1,127, 1 inch $2,817, 1.5 inch $5,633, 2 inch $9,012, 3 inch $19,714, 4 inch $33,795, 6 inch $76,039, 8 inch $101,385, 10 inch $394,275. Paid in addition to the City's water meter fee and tap cost.
    $2,817.00 one-time
  • Water Meter Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett one-time water meter fee by size (meter, coupling and installation): 5/8 x 3/4 inch $189.88, 1 inch $312.24, 1.5 inch $992.53, 2 inch $1,149.37, 3 inch $1,949.35, 4 inch $3,275.20, 6 inch $5,548.50. A City tap of the main is billed separately at actual cost of parts and labor plus 25%.
    $312.24 one-time
Sewer$1,487.00 one-time
  • Wastewater Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential wastewater impact fee by water meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $595, 1 inch $1,487, 1.5 inch $2,973, 2 inch $4,756, 3 inch $10,404, 4 inch $17,835, 6 inch $40,129, 8 inch $53,505, 10 inch $208,075. Sewer taps are billed at the City's actual cost of parts and labor plus 25%.
    $1,487.00 one-time
City$0.64/sq ft
  • Roadway Impact Fee (City of Rowlett, Industrial)
    City of Rowlett
    Rowlett roadway impact fee for general light industrial: $640 per 1,000 sq ft of gross floor area, the same in both roadway service areas, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19).
    $0.64/sq ft
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Rowlett): $0.64/sq ft + $4,616.24 one-time (≈ $36,616.24 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Rowlett Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rowlett: Office Impact Fees

Office development in Rowlett pays $1.95 per square foot in impact fees, plus $4,616.24 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $53,291.24. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Rowlett) — 1" meter ($2,817.00 one-time), Wastewater Impact Fee (City of Rowlett) — 1" meter ($1,487.00 one-time) and Water Meter Fee (City of Rowlett) — 1" meter ($312.24 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Rowlett Impact Fee Schedule
Water$3,129.24 one-time
  • Water Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential water impact fee by meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $1,127, 1 inch $2,817, 1.5 inch $5,633, 2 inch $9,012, 3 inch $19,714, 4 inch $33,795, 6 inch $76,039, 8 inch $101,385, 10 inch $394,275. Paid in addition to the City's water meter fee and tap cost.
    $2,817.00 one-time
  • Water Meter Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett one-time water meter fee by size (meter, coupling and installation): 5/8 x 3/4 inch $189.88, 1 inch $312.24, 1.5 inch $992.53, 2 inch $1,149.37, 3 inch $1,949.35, 4 inch $3,275.20, 6 inch $5,548.50. A City tap of the main is billed separately at actual cost of parts and labor plus 25%.
    $312.24 one-time
Sewer$1,487.00 one-time
  • Wastewater Impact Fee (City of Rowlett) — 1" meter
    City of Rowlett
    Rowlett nonresidential wastewater impact fee by water meter size, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19): 5/8 x 3/4 inch $595, 1 inch $1,487, 1.5 inch $2,973, 2 inch $4,756, 3 inch $10,404, 4 inch $17,835, 6 inch $40,129, 8 inch $53,505, 10 inch $208,075. Sewer taps are billed at the City's actual cost of parts and labor plus 25%.
    $1,487.00 one-time
City$1.95/sq ft
  • Roadway Impact Fee (City of Rowlett, Office)
    City of Rowlett
    Rowlett roadway impact fee for a general office building: $1,947 per 1,000 sq ft of gross floor area, the same in both roadway service areas, per the Master Fee Schedule approved May 19, 2026 (impact fees adopted under Ordinance 035-19).
    $1.95/sq ft
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Rowlett): $1.95/sq ft + $4,616.24 one-time (≈ $53,291.24 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Rowlett Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Rowlett Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Rowlett Impact Fee FAQs

What are the total impact fees for a single-family home in Rowlett, Texas?

A new single-family home in Rowlett pays $7,508.88 per unit in combined impact fees (rates sourced November 25, 2026).

How much are commercial impact fees in Rowlett?

Commercial development in Rowlett pays $3.57 per square foot in impact fees, plus $4,616.24 in one-time water and sewer connection fees (assuming a 1-inch meter), about $183,066.24 for a 50,000 sq ft building.

Does Rowlett charge its own impact fees?

Yes. Rowlett levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Rowlett. The schedule on this page shows every fee that applies to development in Rowlett.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.