Garland Impact Fees by Project Type
Garland: Single-Family Impact Fees
A new single-family home in Garland pays at least $3,802.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Garland) ($3,034.00) and Water Impact Fee (City of Garland) — 5/8" x 3/4" PD meter ($593.00).
Water Meter Fee (City of Garland) — 5/8" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Tap/Connection Fee (City of Garland) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Garland Impact Fee Schedule
- Water Impact Fee (City of Garland) — 5/8" x 3/4" PD meter$593.00City of GarlandChapter 395 water impact fee by meter size, collected at the building permit: $593 for a standard 5/8 x 3/4 inch residential meter, $890 for 3/4 inch, $1,483 for 1 inch, $2,965 for 1.5 inch, $4,744 for a 2 inch positive displacement meter; larger meters scale up. Separate from the water meter fee. Garland has no wastewater impact fee.
- Water Meter Fee (City of Garland) — 5/8" meter$175.00Requires confirmationCity of GarlandOne-time charge to set a new residential water meter, paid with the building permit: $175 for a 5/8 inch meter or $215 for a 3/4 inch meter. Separate from the water impact fee.
- Sewer Tap/Connection Fee (City of Garland)Requires confirmationCity of GarlandGarland levies no Chapter 395 wastewater impact fee. A new sewer tap is billed at the City's case-by-case cost estimate for labor and materials, or installed by a licensed private plumber.
- Roadway Impact Fee (City of Garland)$3,034.00City of GarlandChapter 395 roadway impact fee: $3,034 per single-family lot, the same in all four roadway service areas. The City lists it as the standard fee for lots in subdivisions platted after 2017.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties cannot levy Chapter 395 impact fees, and Dallas County charges none.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Garland: Multifamily Impact Fees
A new multifamily unit in Garland pays at least $2,469.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (City of Garland, MF) ($1,876.00) and Water Impact Fee (City of Garland, MF) — 5/8" x 3/4" PD meter ($593.00).
Water Meter Fee (City of Garland, MF) and Sewer Tap/Connection Fee (City of Garland, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Garland Impact Fee Schedule
- Water Impact Fee (City of Garland, MF) — 5/8" x 3/4" PD meter$593.00City of GarlandChapter 395 water impact fee by meter size: $593 for a 5/8 x 3/4 inch meter, $890 for 3/4 inch, $1,483 for 1 inch, $2,965 for 1.5 inch, $4,744 for a 2 inch positive displacement or compound meter, $9,488 for a 2 inch turbine. A building of six or more units on one master meter pays once at that meter's size.
- Water Meter Fee (City of Garland, MF)Requires confirmationCity of GarlandA one-time water meter installation charge applies; the City prices meters larger than 3/4 inch case by case.
- Sewer Tap/Connection Fee (City of Garland, MF)Requires confirmationCity of GarlandGarland levies no Chapter 395 wastewater impact fee. A new sewer tap is billed at the City's case-by-case cost estimate for labor and materials, or installed by a licensed private plumber.
- Roadway Impact Fee (City of Garland, MF)$1,876.00City of GarlandChapter 395 roadway impact fee: $1,876 per apartment or multifamily unit, the same in all four roadway service areas, collected at the building permit.
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties cannot levy Chapter 395 impact fees, and Dallas County charges none.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Garland: Commercial Impact Fees
Commercial development in Garland pays $3.19 per square foot in impact fees, plus $1,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $160,783.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Garland) — 1" PD meter ($1,483.00 one-time) and Roadway Impact Fee (City of Garland, Commercial) ($3.19/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Garland) and Sewer Tap Fee (City of Garland) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Garland Impact Fee Schedule
- Water Impact Fee (City of Garland) — 1" PD meter$1,483.00 one-timeCity of GarlandGarland charges a Chapter 395 water impact fee by meter type and size, from $593 for a 5/8 inch meter to $207,550 for a 10 inch turbine meter (1 inch positive displacement meter: $1,483, 2.5 service units). It is in addition to the water meter charge. Garland has no wastewater impact fee.
- Water Meter Fee (City of Garland)Requires confirmationCity of GarlandGarland charges a separate water meter fee in addition to the water impact fee: $175 for a 5/8 inch and $215 for a 3/4 inch meter. Charges for larger commercial meters are not published on the City's permit pages.
- Sewer Tap Fee (City of Garland)Requires confirmationCity of GarlandGarland has no wastewater impact fee; its impact fees cover water and roadways only. Any sewer tap charge for a new nonresidential connection is set in the City's master fee schedule and is not published online.
- Roadway Impact Fee (City of Garland, Commercial)$3.19/sq ftCity of GarlandGarland roadway impact fee for a shopping center (ITE 820): $3,186 per 1,000 sq ft of gross leasable area, the same collection rate in all four roadway service areas. The fee is assessed at final plat and collected at the Schedule 2 rate.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Garland: Industrial Impact Fees
Industrial development in Garland pays $0.90 per square foot in impact fees, plus $1,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to at least $46,533.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Garland) — 1" PD meter ($1,483.00 one-time) and Roadway Impact Fee (City of Garland, Industrial) ($0.90/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Garland) and Sewer Tap Fee (City of Garland) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Garland Impact Fee Schedule
- Water Impact Fee (City of Garland) — 1" PD meter$1,483.00 one-timeCity of GarlandGarland charges a Chapter 395 water impact fee by meter type and size, from $593 for a 5/8 inch meter to $207,550 for a 10 inch turbine meter (1 inch positive displacement meter: $1,483, 2.5 service units). It is in addition to the water meter charge. Garland has no wastewater impact fee.
- Water Meter Fee (City of Garland)Requires confirmationCity of GarlandGarland charges a separate water meter fee in addition to the water impact fee: $175 for a 5/8 inch and $215 for a 3/4 inch meter. Charges for larger commercial meters are not published on the City's permit pages.
- Sewer Tap Fee (City of Garland)Requires confirmationCity of GarlandGarland has no wastewater impact fee; its impact fees cover water and roadways only. Any sewer tap charge for a new nonresidential connection is set in the City's master fee schedule and is not published online.
- Roadway Impact Fee (City of Garland, Industrial)$0.90/sq ftCity of GarlandGarland roadway impact fee for general light industrial (ITE 110): $901 per 1,000 sq ft of gross floor area, the same collection rate in all four roadway service areas.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Garland: Office Impact Fees
Office development in Garland pays $4.15 per square foot in impact fees, plus $1,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to at least $105,283.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Garland) — 1" PD meter ($1,483.00 one-time) and Roadway Impact Fee (City of Garland, Office) ($4.15/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter Fee (City of Garland) and Sewer Tap Fee (City of Garland) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Garland Impact Fee Schedule
- Water Impact Fee (City of Garland) — 1" PD meter$1,483.00 one-timeCity of GarlandGarland charges a Chapter 395 water impact fee by meter type and size, from $593 for a 5/8 inch meter to $207,550 for a 10 inch turbine meter (1 inch positive displacement meter: $1,483, 2.5 service units). It is in addition to the water meter charge. Garland has no wastewater impact fee.
- Water Meter Fee (City of Garland)Requires confirmationCity of GarlandGarland charges a separate water meter fee in addition to the water impact fee: $175 for a 5/8 inch and $215 for a 3/4 inch meter. Charges for larger commercial meters are not published on the City's permit pages.
- Sewer Tap Fee (City of Garland)Requires confirmationCity of GarlandGarland has no wastewater impact fee; its impact fees cover water and roadways only. Any sewer tap charge for a new nonresidential connection is set in the City's master fee schedule and is not published online.
- Roadway Impact Fee (City of Garland, Office)$4.15/sq ftCity of GarlandGarland roadway impact fee for a general office building (ITE 710): $4,152 per 1,000 sq ft of gross floor area, the same collection rate in all four roadway service areas.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Garland Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Garland Impact Fee FAQs
What are the total impact fees for a single-family home in Garland, Texas?
A new single-family home in Garland pays at least $3,802.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Garland?
Commercial development in Garland pays $3.19 per square foot in impact fees, plus $1,483.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $160,783.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Garland charge its own impact fees?
Yes. Garland levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Garland. The schedule on this page shows every fee that applies to development in Garland.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.