Skip to content
IMPACTFEES.ORG

Hutchins, Texas Impact Fees

Hutchins applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $6,895.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Hutchins Impact Fees by Project Type

Hutchins: Single-Family Impact Fees

A new single-family home in Hutchins pays at least $6,895.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Hutchins) — Simple 5/8"-3/4" ($3,000.00), Water Impact Fee (City of Hutchins) — Simple 5/8"-3/4" ($2,000.00) and Sewer Lateral Connection (City of Hutchins) — 4" lateral ($900.00).

Roadway Impact Fee (City of Hutchins) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hutchins Impact Fee Schedule
Water$2,770.00
Sewer$3,900.00
  • Wastewater Impact Fee (City of Hutchins) — Simple 5/8"-3/4"
    City of Hutchins
    Hutchins wastewater impact fee: $3,000 for a single-family home on a 5/8 in. to 3/4 in. water meter (1 living unit equivalent); larger meters pay more. A separate sewer lateral connection charge applies on top. Sewage is treated under contract with Dallas.
    $3,000.00
  • Sewer Lateral Connection (City of Hutchins) — 4" lateral
    City of Hutchins
    City sewer lateral connection: $900 for a 4 inch lateral ($1,050 for 6 inch, $1,200 for 8 inch), plus the impact fees. Lots whose laterals the developer installed are exempt.
    $900.00
City$225.00
County$0.00
Total (Hutchins): $6,895.00
Sources last checked Official fee schedules:City of Hutchins Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hutchins: Multifamily Impact Fees

A new multifamily unit in Hutchins pays at least $6,895.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Hutchins, MF) — Simple 5/8"-3/4" ($3,000.00), Water Impact Fee (City of Hutchins, MF) — Simple 5/8"-3/4" ($2,000.00) and Sewer Lateral Connection (City of Hutchins, MF) — 4" lateral ($900.00).

Roadway Impact Fee (City of Hutchins, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Hutchins Impact Fee Schedule
Water$2,770.00
Sewer$3,900.00
City$225.00
County$0.00
Total (Hutchins): $6,895.00
Sources last checked Official fee schedules:City of Hutchins Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hutchins: Commercial Impact Fees

Commercial development in Hutchins pays no per-square-foot impact fees, but owes $10,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $10,483.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $3,000/LUE ($5,100.00 one-time), Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE ($3,400.00 one-time) and Water Service Connection Fee (City of Hutchins) — 1" service ($1,083.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Hutchins, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Hutchins Impact Fee Schedule
Water$4,483.00 one-time
  • Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE
    City of Hutchins
    Chapter 395 water impact fee of $2,000 per living unit equivalent (below the $8,932.42 maximum the city could assess), charged by meter size and type: a 1 inch simple meter is 1.7 living unit equivalents. Compound and turbine meters carry their own factors. Charged in addition to the water service connection fee and meter cost.
    $3,400.00 one-time
  • Water Service Connection Fee (City of Hutchins) — 1" service
    City of Hutchins
    City water service connection for a 1 inch service: $1,083 ($330 box and setting plus $753 tap charge), plus the cost of the meter and the impact fees. Excavation in a paved street adds $266 per linear foot for concrete, $100 for asphalt or $60 for gravel. Effective with Ordinance 2023-1186 (December 4, 2023).
    $1,083.00 one-time
Sewer$6,000.00 one-time
City$0.00
  • Roadway Impact Fee (City of Hutchins, Commercial)
    City of Hutchins
    Hutchins has a Chapter 395 roadway impact fee. Its code sets a maximum of $2,717.29 per vehicle-mile service unit ($1,358.65 after the impact fee credit), and retail or commercial uses generate 8.0 vehicle-miles per 1,000 sq ft of floor area. The rate the city actually collects is not stated in the code.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Hutchins): $10,483.00 one-time (≈ $10,483.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Hutchins Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hutchins: Industrial Impact Fees

Industrial development in Hutchins pays no per-square-foot impact fees, but owes $10,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $10,483.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $3,000/LUE ($5,100.00 one-time), Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE ($3,400.00 one-time) and Water Service Connection Fee (City of Hutchins) — 1" service ($1,083.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Hutchins, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Hutchins Impact Fee Schedule
Water$4,483.00 one-time
  • Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE
    City of Hutchins
    Chapter 395 water impact fee of $2,000 per living unit equivalent (below the $8,932.42 maximum the city could assess), charged by meter size and type: a 1 inch simple meter is 1.7 living unit equivalents. Compound and turbine meters carry their own factors. Charged in addition to the water service connection fee and meter cost.
    $3,400.00 one-time
  • Water Service Connection Fee (City of Hutchins) — 1" service
    City of Hutchins
    City water service connection for a 1 inch service: $1,083 ($330 box and setting plus $753 tap charge), plus the cost of the meter and the impact fees. Excavation in a paved street adds $266 per linear foot for concrete, $100 for asphalt or $60 for gravel. Effective with Ordinance 2023-1186 (December 4, 2023).
    $1,083.00 one-time
Sewer$6,000.00 one-time
City$0.00
  • Roadway Impact Fee (City of Hutchins, Industrial)
    City of Hutchins
    Hutchins has a Chapter 395 roadway impact fee. Its code sets a maximum of $2,717.29 per vehicle-mile service unit ($1,358.65 after the impact fee credit), and industrial uses generate 41.47 vehicle-miles per acre. The rate the city actually collects is not stated in the code.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Hutchins): $10,483.00 one-time (≈ $10,483.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Hutchins Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hutchins: Office Impact Fees

Office development in Hutchins pays no per-square-foot impact fees, but owes $10,483.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $10,483.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $3,000/LUE ($5,100.00 one-time), Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE ($3,400.00 one-time) and Water Service Connection Fee (City of Hutchins) — 1" service ($1,083.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Hutchins, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Hutchins Impact Fee Schedule
Water$4,483.00 one-time
  • Water Impact Fee (City of Hutchins) — 1" simple meter, 1.7 LUE × $2,000/LUE
    City of Hutchins
    Chapter 395 water impact fee of $2,000 per living unit equivalent (below the $8,932.42 maximum the city could assess), charged by meter size and type: a 1 inch simple meter is 1.7 living unit equivalents. Compound and turbine meters carry their own factors. Charged in addition to the water service connection fee and meter cost.
    $3,400.00 one-time
  • Water Service Connection Fee (City of Hutchins) — 1" service
    City of Hutchins
    City water service connection for a 1 inch service: $1,083 ($330 box and setting plus $753 tap charge), plus the cost of the meter and the impact fees. Excavation in a paved street adds $266 per linear foot for concrete, $100 for asphalt or $60 for gravel. Effective with Ordinance 2023-1186 (December 4, 2023).
    $1,083.00 one-time
Sewer$6,000.00 one-time
City$0.00
  • Roadway Impact Fee (City of Hutchins, Office)
    City of Hutchins
    Hutchins has a Chapter 395 roadway impact fee. Its code sets a maximum of $2,717.29 per vehicle-mile service unit ($1,358.65 after the impact fee credit), and office uses generate 8.79 vehicle-miles per 1,000 sq ft of floor area. The rate the city actually collects is not stated in the code.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Hutchins): $10,483.00 one-time (≈ $10,483.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Hutchins Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Hutchins Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Hutchins Impact Fee FAQs

What are the total impact fees for a single-family home in Hutchins, Texas?

A new single-family home in Hutchins pays at least $6,895.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Hutchins?

Commercial development in Hutchins pays no per-square-foot impact fees, but owes $10,483.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Hutchins charge its own impact fees?

Yes. Hutchins levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Hutchins. The schedule on this page shows every fee that applies to development in Hutchins.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.