Highland Park Impact Fees by Project Type
Highland Park: Single-Family Impact Fees
A new single-family home in Highland Park pays $3,900.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Installation Fee (Town of Highland Park) — 2" domestic + 1" irrigation ($3,000.00), Water Connection Fee (Town of Highland Park) — 2 connections ($600.00) and Sewer Connection Fee (Town of Highland Park) ($300.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Highland Park Impact Fee Schedule
- Water Meter Installation Fee (Town of Highland Park) — 2" domestic + 1" irrigation$3,000.00Town of Highland ParkOne-time meter installation fees under the fee schedule effective October 1, 2026. A new home needs a 2 inch domestic/fire service and a 1 inch irrigation service ($2,000 + $1,000); a 1 inch domestic service may be approved on engineering calculations ($1,000 + $1,000). The owner's contractor installs the taps and service lines. No Chapter 395 water impact fee.
- Water Connection Fee (Town of Highland Park) — 2 connections$600.00Town of Highland ParkOne-time water connection fee of $300 per connection; a new home has two (domestic/fire and irrigation).
- Sewer Connection Fee (Town of Highland Park)$300.00Town of Highland ParkOne-time sewer connection fee under the fee schedule effective October 1, 2026; the owner's contractor installs the sewer tap and service line. No Chapter 395 wastewater impact fee.
- City Impact/Development Fees (Town of Highland Park)$0.00Town of Highland ParkHighland Park levies no city development impact fees (no roadway impact fee, no parkland dedication fee-in-lieu).
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Highland Park.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Park: Multifamily Impact Fees
A new multifamily unit in Highland Park pays $1,600.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Meter Installation Fee (Town of Highland Park, MF) — 1" meter ($1,000.00), Sewer Connection Fee (Town of Highland Park, MF) ($300.00) and Water Connection Fee (Town of Highland Park, MF) ($300.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Highland Park Impact Fee Schedule
- Water Meter Installation Fee (Town of Highland Park, MF) — 1" meter$1,000.00Town of Highland ParkOne-time water meter installation fee under the fee schedule effective October 1, 2026: $1,000 for a 1 inch meter, $2,000 for 2 inch, larger at cost. A building on one meter pays once.
- Water Connection Fee (Town of Highland Park, MF)$300.00Town of Highland ParkOne-time water connection fee of $300 per connection; a building on one connection pays once.
- Sewer Connection Fee (Town of Highland Park, MF)$300.00Town of Highland ParkOne-time sewer connection fee of $300 per connection under the fee schedule effective October 1, 2026; a building on one connection pays once.
- City Impact/Development Fees (Town of Highland Park, MF)$0.00Town of Highland ParkHighland Park levies no city development impact fees (no roadway impact fee, no parkland dedication fee-in-lieu).
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Highland Park.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Park: Commercial Impact Fees
Commercial development in Highland Park pays no per-square-foot impact fees, but owes $1,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $1,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (Town of Highland Park) — 1" meter ($850.00 one-time) and Sewer Tap Fee (Town of Highland Park) ($750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Highland Park Impact Fee Schedule
- Water Meter Fee (Town of Highland Park) — 1" meter$850.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 water impact fee. The Town charges a one-time water meter fee by size: $750 for 5/8 inch, $850 for 1 inch and $1,400 for 1.5 inch (proof of water demand required for 1.5 inch). Excavation is at the customer's cost. Larger meters are not on the published schedule.
- Sewer Tap Fee (Town of Highland Park)$750.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 wastewater impact fee. A one-time sewer tap fee of $750 is required for new construction, plus excavation at the customer's cost.
- City Impact Fee (Town of Highland Park, Commercial)$0.00Town of Highland ParkHighland Park has not adopted a Chapter 395 roadway, water or wastewater impact fee. Texas law allows no city impact fees for parks, fire, police or other general services.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Park: Industrial Impact Fees
Industrial development in Highland Park pays no per-square-foot impact fees, but owes $1,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $1,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (Town of Highland Park) — 1" meter ($850.00 one-time) and Sewer Tap Fee (Town of Highland Park) ($750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Highland Park Impact Fee Schedule
- Water Meter Fee (Town of Highland Park) — 1" meter$850.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 water impact fee. The Town charges a one-time water meter fee by size: $750 for 5/8 inch, $850 for 1 inch and $1,400 for 1.5 inch (proof of water demand required for 1.5 inch). Excavation is at the customer's cost. Larger meters are not on the published schedule.
- Sewer Tap Fee (Town of Highland Park)$750.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 wastewater impact fee. A one-time sewer tap fee of $750 is required for new construction, plus excavation at the customer's cost.
- City Impact Fee (Town of Highland Park, Industrial)$0.00Town of Highland ParkHighland Park has not adopted a Chapter 395 roadway, water or wastewater impact fee. Texas law allows no city impact fees for parks, fire, police or other general services.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Park: Office Impact Fees
Office development in Highland Park pays no per-square-foot impact fees, but owes $1,600.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $1,600.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (Town of Highland Park) — 1" meter ($850.00 one-time) and Sewer Tap Fee (Town of Highland Park) ($750.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Highland Park Impact Fee Schedule
- Water Meter Fee (Town of Highland Park) — 1" meter$850.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 water impact fee. The Town charges a one-time water meter fee by size: $750 for 5/8 inch, $850 for 1 inch and $1,400 for 1.5 inch (proof of water demand required for 1.5 inch). Excavation is at the customer's cost. Larger meters are not on the published schedule.
- Sewer Tap Fee (Town of Highland Park)$750.00 one-timeTown of Highland ParkHighland Park has no Chapter 395 wastewater impact fee. A one-time sewer tap fee of $750 is required for new construction, plus excavation at the customer's cost.
- City Impact Fee (Town of Highland Park, Office)$0.00Town of Highland ParkHighland Park has not adopted a Chapter 395 roadway, water or wastewater impact fee. Texas law allows no city impact fees for parks, fire, police or other general services.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Highland Park Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Highland Park Impact Fee FAQs
What are the total impact fees for a single-family home in Highland Park, Texas?
A new single-family home in Highland Park pays $3,900.00 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Highland Park?
Commercial development in Highland Park pays no per-square-foot impact fees, but owes $1,600.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Highland Park charge its own impact fees?
Yes. Highland Park levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Highland Park. The schedule on this page shows every fee that applies to development in Highland Park.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.