Irving applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $5,643.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Irving Impact Fees by Project Type

Irving: Single-Family Impact Fees

A new single-family home in Irving pays at least $5,643.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Irving) — Service Area 1, 5.30 veh-mi × $500/veh-mi ($2,650.00), Water Impact Fee (City of Irving) — 5/8" x 3/4" ($1,605.00) and Wastewater Impact Fee (City of Irving) — 5/8" x 3/4" ($1,088.00).

Drainage Impact Fee (City of Irving) — Heritage District is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Irving Impact Fee Schedule
Water$1,905.00
Sewer$1,088.00
City$2,650.00
  • Roadway Impact Fee (City of Irving) — Service Area 1, 5.30 veh-mi × $500/veh-mi
    City of Irving
    Chapter 395 roadway impact fee, effective July 15, 2024: $500 per vehicle-mile in four of Irving's five roadway service areas and $146 in Service Area 3. A single-family detached home counts as 5.30 vehicle-miles, so $2,650 in the highest areas (highest of 5 service areas; $773.80 in Service Area 3). Paid at building permit.
    $2,650.00
  • Drainage Impact Fee (City of Irving) — Heritage District
    City of Irving
    Chapter 395 drainage impact fee, effective July 15, 2024, charged only inside a mapped part of the Heritage District southwest of downtown Irving: $0.85 per sq ft of new impervious cover. No drainage impact fee applies elsewhere in Irving.
    Requires confirmation
County$0.00
Total (Irving): $5,643.00
Sources last checked Official fee schedules:City of Irving Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Irving: Multifamily Impact Fees

A new multifamily unit in Irving pays at least $6,828.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Irving, MF) — 5/8" x 3/4" ($2,756.00), Roadway Impact Fee (City of Irving, MF) — Service Area 2, 1.91 veh-mi × $1,000/veh-mi ($1,910.00) and Wastewater Impact Fee (City of Irving, MF) — 5/8" x 3/4" ($1,862.00).

Drainage Impact Fee (City of Irving, MF) — Heritage District is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Irving Impact Fee Schedule
Water$3,056.00
Sewer$1,862.00
City$1,910.00
  • Roadway Impact Fee (City of Irving, MF) — Service Area 2, 1.91 veh-mi × $1,000/veh-mi
    City of Irving
    Chapter 395 roadway impact fee for multifamily, effective July 15, 2024: $1,000 per vehicle-mile in three of five service areas ($688 in Service Area 1, $146 in Service Area 3). A mid-rise apartment unit (4 to 10 floors) counts as 1.91 vehicle-miles, so $1,910 per unit in the highest areas (highest of 5 service areas). Low-rise units count as 2.50 vehicle-miles.
    $1,910.00
  • Drainage Impact Fee (City of Irving, MF) — Heritage District
    City of Irving
    Chapter 395 drainage impact fee, effective July 15, 2024, charged only inside a mapped part of the Heritage District southwest of downtown Irving: $1.64 per sq ft of new impervious cover for multifamily. No drainage impact fee applies elsewhere in Irving.
    Requires confirmation
County$0.00
Total (Irving): $6,828.00
Sources last checked Official fee schedules:City of Irving Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Irving: Commercial Impact Fees

Commercial development in Irving pays $1.62 per square foot in impact fees, plus $7,661.10 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $88,661.10. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU ($4,333.50 one-time), Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU ($2,937.60 one-time) and Water Meter Cost and Installation (City of Irving) — 1" meter ($390.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Irving) is set by the utility and not published online. Drainage Impact Fee (City of Irving, Commercial) — per sq ft impervious, Heritage District only is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Irving Impact Fee Schedule
Water$4,723.50 one-time
  • Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU
    City of Irving
    Chapter 395 water impact fee, effective July 2024: $1,605 per service unit for most nonresidential uses, with a 5/8 x 3/4 inch meter as one unit and larger meters scaled by capacity (1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40, 6-inch 53.3, 8-inch 133.3 units). Manufacturing, warehouse and distribution uses pay $2,756 per unit. Irrigation and fire-only meter upsizing are treated separately. Paid at building permit.
    $4,333.50 one-time
  • Water Meter Cost and Installation (City of Irving) — 1" meter
    City of Irving
    Effective October 1, 2026, Irving charges for a radio-read water meter and its installation by size: 5/8 x 3/4 inch $300, 1 inch $390, 1.5 inch $745, 2 inch $875, plus a $50 inspection fee per connection and a $15 administration fee per project. Meters 4 inches and larger are supplied by the developer. Paid in addition to the water impact fee.
    $390.00 one-time
Sewer$2,937.60 one-time
  • Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU
    City of Irving
    Chapter 395 wastewater impact fee, effective July 2024: $1,088 per service unit for most nonresidential uses, counted by water meter size (5/8 x 3/4 inch = 1 unit, 1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40 units). Manufacturing, warehouse and distribution uses pay $1,862 per unit. Irrigation meters carry no wastewater units. Paid at building permit.
    $2,937.60 one-time
  • Sewer Tap Fee (City of Irving)
    City of Irving
    Irving runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$1.62/sq ft
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Irving): $1.62/sq ft + $7,661.10 one-time (≈ $88,661.10 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Irving Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Irving: Industrial Impact Fees

Industrial development in Irving pays $3.23 per square foot in impact fees, plus $7,661.10 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $169,161.10. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU ($4,333.50 one-time), Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU ($2,937.60 one-time) and Water Meter Cost and Installation (City of Irving) — 1" meter ($390.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Irving) is set by the utility and not published online. Drainage Impact Fee (City of Irving, Industrial) — per sq ft impervious, Heritage District only is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Irving Impact Fee Schedule
Water$4,723.50 one-time
  • Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU
    City of Irving
    Chapter 395 water impact fee, effective July 2024: $1,605 per service unit for most nonresidential uses, with a 5/8 x 3/4 inch meter as one unit and larger meters scaled by capacity (1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40, 6-inch 53.3, 8-inch 133.3 units). Manufacturing, warehouse and distribution uses pay $2,756 per unit. Irrigation and fire-only meter upsizing are treated separately. Paid at building permit.
    $4,333.50 one-time
  • Water Meter Cost and Installation (City of Irving) — 1" meter
    City of Irving
    Effective October 1, 2026, Irving charges for a radio-read water meter and its installation by size: 5/8 x 3/4 inch $300, 1 inch $390, 1.5 inch $745, 2 inch $875, plus a $50 inspection fee per connection and a $15 administration fee per project. Meters 4 inches and larger are supplied by the developer. Paid in addition to the water impact fee.
    $390.00 one-time
Sewer$2,937.60 one-time
  • Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU
    City of Irving
    Chapter 395 wastewater impact fee, effective July 2024: $1,088 per service unit for most nonresidential uses, counted by water meter size (5/8 x 3/4 inch = 1 unit, 1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40 units). Manufacturing, warehouse and distribution uses pay $1,862 per unit. Irrigation meters carry no wastewater units. Paid at building permit.
    $2,937.60 one-time
  • Sewer Tap Fee (City of Irving)
    City of Irving
    Irving runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$3.23/sq ft
  • Roadway Impact Fee (City of Irving, Industrial) — Service Area 2, ITE 110, 3.23 veh-mi × $1,000/veh-mi
    City of Irving
    Chapter 395 roadway impact fee, effective July 2024. Manufacturing, warehouse and distribution uses pay the City's higher rate: $1,000 per vehicle-mile in service areas 2, 4 and 5, $688 in service area 1 and $146 in service area 3, so this is the highest of 5 rate districts. Light industrial space generates 3.23 vehicle-miles per 1,000 sq ft of floor area. Assessed at plat (or at building permit for land already platted) and paid at building permit.
    $3.23/sq ft
  • Drainage Impact Fee (City of Irving, Industrial) — per sq ft impervious, Heritage District only
    City of Irving
    Chapter 395 drainage impact fee, effective July 2024, charged only inside a mapped part of the Heritage District southwest of downtown Irving: $1.64 per sq ft of new impervious cover for manufacturing, warehouse and distribution uses (the City's typical figure for industrial sites is 72% of the lot). No drainage impact fee applies elsewhere in Irving.
    Requires confirmation
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Irving): $3.23/sq ft + $7,661.10 one-time (≈ $169,161.10 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Irving Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Irving: Office Impact Fees

Office development in Irving pays $4.34 per square foot in impact fees, plus $7,661.10 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $116,286.10. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU ($4,333.50 one-time), Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU ($2,937.60 one-time) and Water Meter Cost and Installation (City of Irving) — 1" meter ($390.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of Irving) is set by the utility and not published online. Drainage Impact Fee (City of Irving, Office) — per sq ft impervious, Heritage District only is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Irving Impact Fee Schedule
Water$4,723.50 one-time
  • Water Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,605/SU
    City of Irving
    Chapter 395 water impact fee, effective July 2024: $1,605 per service unit for most nonresidential uses, with a 5/8 x 3/4 inch meter as one unit and larger meters scaled by capacity (1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40, 6-inch 53.3, 8-inch 133.3 units). Manufacturing, warehouse and distribution uses pay $2,756 per unit. Irrigation and fire-only meter upsizing are treated separately. Paid at building permit.
    $4,333.50 one-time
  • Water Meter Cost and Installation (City of Irving) — 1" meter
    City of Irving
    Effective October 1, 2026, Irving charges for a radio-read water meter and its installation by size: 5/8 x 3/4 inch $300, 1 inch $390, 1.5 inch $745, 2 inch $875, plus a $50 inspection fee per connection and a $15 administration fee per project. Meters 4 inches and larger are supplied by the developer. Paid in addition to the water impact fee.
    $390.00 one-time
Sewer$2,937.60 one-time
  • Wastewater Impact Fee (City of Irving) — 1" meter, 2.7 SU × $1,088/SU
    City of Irving
    Chapter 395 wastewater impact fee, effective July 2024: $1,088 per service unit for most nonresidential uses, counted by water meter size (5/8 x 3/4 inch = 1 unit, 1-inch 2.7, 1.5-inch 3.3, 2-inch 6.7, 3-inch 23.3, 4-inch 40 units). Manufacturing, warehouse and distribution uses pay $1,862 per unit. Irrigation meters carry no wastewater units. Paid at building permit.
    $2,937.60 one-time
  • Sewer Tap Fee (City of Irving)
    City of Irving
    Irving runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$4.34/sq ft
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Irving): $4.34/sq ft + $7,661.10 one-time (≈ $116,286.10 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Irving Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Irving Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Irving Impact Fee FAQs

What are the total impact fees for a single-family home in Irving, Texas?

A new single-family home in Irving pays at least $5,643.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Irving?

Commercial development in Irving pays $1.62 per square foot in impact fees, plus $7,661.10 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $88,661.10 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Irving charge its own impact fees?

Yes. Irving levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Irving. The schedule on this page shows every fee that applies to development in Irving.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.