Lancaster Impact Fees by Project Type
Lancaster: Single-Family Impact Fees
A new single-family home in Lancaster pays $10,143.75 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Fee in Lieu of Dedication (City of Lancaster) ($1,400.00), Sewer Tap Fee (City of Lancaster) ($1,250.00) and Water Tap Fee (City of Lancaster) — 3/4" tap ($890.00).
Water Impact Fee (City of Lancaster), Roadway Impact Fee (City of Lancaster) — Service Area 2, 4.95 veh-mi × $485/veh-mi, and Wastewater Impact Fee (City of Lancaster) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lancaster Impact Fee Schedule
- Water Impact Fee (City of Lancaster)$1,689.00Requires confirmationCity of LancasterLancaster water impact fee: $1,689 per service unit (a standard 3/4 in. meter is one service unit), from the city's posted impact fee rate table under Ordinance 2021-07-27. Larger meters pay more.
- Water Tap Fee (City of Lancaster) — 3/4" tap$890.00City of LancasterLancaster charges a one-time residential water tap fee by size: $890 for a 3/4 inch tap, $997 for 1 inch, $1,250 for 1.5 inch and $1,496 for 2 inch. Where a tap already exists, a meter fee applies instead ($350 for a 3/4 inch meter).
- Wastewater Impact Fee (City of Lancaster)$2,514.00Requires confirmationCity of LancasterLancaster wastewater impact fee: $2,514 per service unit (a standard 3/4 in. meter is one service unit), from the city's posted impact fee rate table under Ordinance 2021-07-27. Larger meters pay more.
- Sewer Tap Fee (City of Lancaster)$1,250.00City of LancasterLancaster charges $1,250 for a residential 4 inch sewer tap (under 35 feet long and 10 feet deep); larger or deeper taps are installed by a bonded contractor at the owner's cost.
- Roadway Impact Fee (City of Lancaster) — Service Area 2, 4.95 veh-mi × $485/veh-mi$2,400.75Requires confirmationCity of LancasterLancaster roadway impact fee for a single-family home: 4.95 vehicle-miles at $485 each in Service Areas 2 and 3 (highest of 3 service areas; $363 in Service Area 1), from the city's posted rate table under Ordinance 2021-07-27.
- Park Fee in Lieu of Dedication (City of Lancaster)$1,400.00City of LancasterLancaster charges a park fee in lieu of parkland dedication of $1,400 per dwelling unit, for single-family and multifamily development, where land is not dedicated.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Lancaster.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lancaster: Multifamily Impact Fees
A new multifamily unit in Lancaster pays at least $6,670.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Park Fee in Lieu of Dedication (City of Lancaster, MF) ($1,400.00).
Roadway Impact Fee (City of Lancaster, MF) — Service Area 2, 2.2 veh-mi × $485/veh-mi, Wastewater Impact Fee (City of Lancaster, MF), and Water Impact Fee (City of Lancaster, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Lancaster, MF) and Water Tap Fee (City of Lancaster, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lancaster Impact Fee Schedule
- Water Impact Fee (City of Lancaster, MF)$1,689.00Requires confirmationCity of LancasterLancaster charges the water impact fee by meter size: $1,689 per service unit (a 3/4 in. meter is one). A building on one master meter pays once for its meter size.
- Water Tap Fee (City of Lancaster, MF)Requires confirmationCity of LancasterLancaster prices city water taps for residential service; commercial taps are installed by a third-party contractor. The fee schedule does not say which applies to multifamily buildings.
- Wastewater Impact Fee (City of Lancaster, MF)$2,514.00Requires confirmationCity of LancasterLancaster charges the wastewater impact fee by meter size: $2,514 per service unit (a 3/4 in. meter is one). A building on one master meter pays once for its meter size.
- Sewer Tap Fee (City of Lancaster, MF)Requires confirmationCity of LancasterLancaster prices a residential 4 inch sewer tap; commercial taps are installed by a third-party contractor. The fee schedule does not say which applies to multifamily buildings.
- Park Fee in Lieu of Dedication (City of Lancaster, MF)$1,400.00City of LancasterLancaster charges a park fee in lieu of parkland dedication of $1,400 per dwelling unit, multifamily included, where land is not dedicated.
- Roadway Impact Fee (City of Lancaster, MF) — Service Area 2, 2.2 veh-mi × $485/veh-mi$1,067.00Requires confirmationCity of LancasterLancaster roadway impact fee per mid-rise apartment unit: 2.2 vehicle-miles at $485 in Service Areas 2 and 3 (highest of 3 service areas; $363 in Service Area 1).
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Lancaster.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lancaster: Commercial Impact Fees
Commercial development in Lancaster pays $1.34 per square foot in impact fees, plus $7,074.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $74,312.30. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Lancaster) — 1" meter ($350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Lancaster, Commercial) — Service Area 2, ITE 820, 4.89 veh-mi × $275/veh-mi, Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU, and Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lancaster Impact Fee Schedule
- Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU$2,702.40 one-timeRequires confirmationCity of LancasterChapter 395 water impact fee. The City's posted collection rate is $1,689 per service unit, with a 3/4-inch meter as one unit and larger meters scaled by capacity (1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20, 6-inch 40, 8-inch 64 units).
- Water Meter Fee (City of Lancaster) — 1" meter$350.00 one-timeCity of LancasterLancaster charges a one-time meter fee by size: $350 for 3/4-inch and 1-inch, $500 for 1.5-inch and $375 for 2-inch meters, set included. Owners provide City-approved meters of 3 inches and larger. Commercial taps are installed by the developer's contractor under a right-of-way permit.
- Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU$4,022.40 one-timeRequires confirmationCity of LancasterChapter 395 wastewater impact fee. The City's posted collection rate is $2,514 per service unit, counted by water meter size (3/4-inch = 1 unit, 1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20 units).
- Sewer Tap Fee (City of Lancaster)$0.00City of LancasterLancaster does not install commercial sewer taps: the developer's contractor installs them at its own cost under a right-of-way permit, with the City's standard inspection fees.
- Roadway Impact Fee (City of Lancaster, Commercial) — Service Area 2, ITE 820, 4.89 veh-mi × $275/veh-mi$1.34/sq ftRequires confirmationCity of LancasterChapter 395 roadway impact fee. The City's posted collection rate for nonresidential development is $275 per vehicle-mile in service areas 2 and 3 and $230 in service area 1, so this is the highest of 3 rate districts. A shopping center generates 4.89 vehicle-miles per 1,000 sq ft of leasable area. Nonresidential uses are collected at about 19 to 22% of the maximum allowable fee.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lancaster: Industrial Impact Fees
Industrial development in Lancaster pays $0.87 per square foot in impact fees, plus $7,074.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $50,387.30. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Lancaster) — 1" meter ($350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Lancaster, Industrial) — Service Area 2, ITE 110, 3.15 veh-mi × $275/veh-mi, Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU, and Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lancaster Impact Fee Schedule
- Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU$2,702.40 one-timeRequires confirmationCity of LancasterChapter 395 water impact fee. The City's posted collection rate is $1,689 per service unit, with a 3/4-inch meter as one unit and larger meters scaled by capacity (1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20, 6-inch 40, 8-inch 64 units).
- Water Meter Fee (City of Lancaster) — 1" meter$350.00 one-timeCity of LancasterLancaster charges a one-time meter fee by size: $350 for 3/4-inch and 1-inch, $500 for 1.5-inch and $375 for 2-inch meters, set included. Owners provide City-approved meters of 3 inches and larger. Commercial taps are installed by the developer's contractor under a right-of-way permit.
- Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU$4,022.40 one-timeRequires confirmationCity of LancasterChapter 395 wastewater impact fee. The City's posted collection rate is $2,514 per service unit, counted by water meter size (3/4-inch = 1 unit, 1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20 units).
- Sewer Tap Fee (City of Lancaster)$0.00City of LancasterLancaster does not install commercial sewer taps: the developer's contractor installs them at its own cost under a right-of-way permit, with the City's standard inspection fees.
- Roadway Impact Fee (City of Lancaster, Industrial) — Service Area 2, ITE 110, 3.15 veh-mi × $275/veh-mi$0.87/sq ftRequires confirmationCity of LancasterChapter 395 roadway impact fee. The City's posted collection rate for nonresidential development is $275 per vehicle-mile in service areas 2 and 3 and $230 in service area 1, so this is the highest of 3 rate districts. General light industrial space generates 3.15 vehicle-miles per 1,000 sq ft of floor area.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lancaster: Office Impact Fees
Office development in Lancaster pays $1.58 per square foot in impact fees, plus $7,074.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $46,606.05. The calculator below adjusts to your exact square footage.
The largest line items are Water Meter Fee (City of Lancaster) — 1" meter ($350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Lancaster, Office) — Service Area 2, ITE 710, 5.75 veh-mi × $275/veh-mi, Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU, and Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Lancaster Impact Fee Schedule
- Water Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $1,689/SU$2,702.40 one-timeRequires confirmationCity of LancasterChapter 395 water impact fee. The City's posted collection rate is $1,689 per service unit, with a 3/4-inch meter as one unit and larger meters scaled by capacity (1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20, 6-inch 40, 8-inch 64 units).
- Water Meter Fee (City of Lancaster) — 1" meter$350.00 one-timeCity of LancasterLancaster charges a one-time meter fee by size: $350 for 3/4-inch and 1-inch, $500 for 1.5-inch and $375 for 2-inch meters, set included. Owners provide City-approved meters of 3 inches and larger. Commercial taps are installed by the developer's contractor under a right-of-way permit.
- Wastewater Impact Fee (City of Lancaster) — 1" meter, 1.6 SU × $2,514/SU$4,022.40 one-timeRequires confirmationCity of LancasterChapter 395 wastewater impact fee. The City's posted collection rate is $2,514 per service unit, counted by water meter size (3/4-inch = 1 unit, 1-inch 1.6, 1.5-inch 2, 2-inch 4, 3-inch 12.8, 4-inch 20 units).
- Sewer Tap Fee (City of Lancaster)$0.00City of LancasterLancaster does not install commercial sewer taps: the developer's contractor installs them at its own cost under a right-of-way permit, with the City's standard inspection fees.
- Roadway Impact Fee (City of Lancaster, Office) — Service Area 2, ITE 710, 5.75 veh-mi × $275/veh-mi$1.58/sq ftRequires confirmationCity of LancasterChapter 395 roadway impact fee. The City's posted collection rate for nonresidential development is $275 per vehicle-mile in service areas 2 and 3 and $230 in service area 1, so this is the highest of 3 rate districts. A general office building generates 5.75 vehicle-miles per 1,000 sq ft of floor area.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lancaster Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lancaster Impact Fee FAQs
What are the total impact fees for a single-family home in Lancaster, Texas?
A new single-family home in Lancaster pays $10,143.75 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Lancaster?
Commercial development in Lancaster pays $1.34 per square foot in impact fees, plus $7,074.80 in one-time water and sewer connection fees (assuming a 1-inch meter), about $74,312.30 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Lancaster charge its own impact fees?
Yes. Lancaster levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Lancaster. The schedule on this page shows every fee that applies to development in Lancaster.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.