Skip to content
IMPACTFEES.ORG

Cedar Hill, Texas Impact Fees

Cedar Hill applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays $8,886.84 per unit (rates sourced ). The full breakdown is below.

Cedar Hill Impact Fees by Project Type

Cedar Hill: Single-Family Impact Fees

A new single-family home in Cedar Hill pays $8,886.84 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Cedar Hill) ($3,981.84), Water Impact Fee (City of Cedar Hill) — 1" meter, 1 SU × $4,489 × 0.6 ($2,693.40) and Wastewater Impact Fee (City of Cedar Hill) — 1" meter, 1 SU × $1,686 × 0.6 ($1,011.60).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cedar Hill Impact Fee Schedule
Water$2,693.40
  • Water Impact Fee (City of Cedar Hill) — 1" meter, 1 SU × $4,489 × 0.6
    City of Cedar Hill
    Water impact fee for single-family and townhouse uses by meter size: $4,489 per service unit (a 1 in. meter, the City's smallest, is one service unit), reduced 40%, under the ordinance effective September 1, 2024. Larger meters pay by their service unit equivalency.
    $2,693.40
Sewer$1,011.60
City$5,181.84
  • Roadway Impact Fee (City of Cedar Hill)
    City of Cedar Hill
    Roadway impact fee for a single-family home: 3.76 vehicle-miles at $1,059 per vehicle-mile, the same in all four service areas, under the ordinance effective September 1, 2024.
    $3,981.84
  • Park Development Fee (City of Cedar Hill)
    City of Cedar Hill
    City of Cedar Hill charges $700 per dwelling unit as a park development fee. It is paid at final plat or at the building permit.
    $700.00
  • Parkland Dedication Fee in Lieu (City of Cedar Hill)
    City of Cedar Hill
    City of Cedar Hill charges $500 per dwelling unit as money in lieu of parkland dedication. It is paid at final plat or at the building permit. Dedicating land may replace it.
    $500.00
County$0.00
Total (Cedar Hill): $8,886.84
Sources last checked Official fee schedules:City of Cedar Hill Dallas County

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Hill: Multifamily Impact Fees

A new multifamily unit in Cedar Hill pays $9,535.36 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Cedar Hill, MF) — 1" meter ($4,489.00), Roadway Impact Fee (City of Cedar Hill, MF) ($2,160.36) and Wastewater Impact Fee (City of Cedar Hill, MF) — 1" meter ($1,686.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Cedar Hill Impact Fee Schedule
Water$4,489.00
  • Water Impact Fee (City of Cedar Hill, MF) — 1" meter
    City of Cedar Hill
    Water impact fee per service unit (a 1 in. meter, the City's smallest), charged by meter size with no per-unit rate: a building on one meter pays once, at its meter's equivalency. The 40% reduction applies to single-family and townhouse uses only.
    $4,489.00
Sewer$1,686.00
  • Wastewater Impact Fee (City of Cedar Hill, MF) — 1" meter
    City of Cedar Hill
    Wastewater impact fee per service unit (a 1 in. meter, the City's smallest), charged by meter size with no per-unit rate: a building on one meter pays once, at its meter's equivalency. The 40% reduction applies to single-family and townhouse uses only.
    $1,686.00
City$3,360.36
County$0.00
Total (Cedar Hill): $9,535.36
Sources last checked Official fee schedules:City of Cedar Hill Dallas County

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Hill: Commercial Impact Fees

Commercial development in Cedar Hill pays $11.27 per square foot in impact fees, plus $6,175.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $569,563.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Cedar Hill) — 1" meter ($4,489.00 one-time), Wastewater Impact Fee (City of Cedar Hill) — 1" meter ($1,686.00 one-time) and Roadway Impact Fee (City of Cedar Hill, Commercial) — ITE 821, 10.64 veh-mi × $1,059/veh-mi ($11.27/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Meter Fee (City of Cedar Hill) and Sewer Tap Fee (City of Cedar Hill) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Hill Impact Fee Schedule
Water$4,489.00 one-time
  • Water Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 water impact fee, effective September 1, 2024: $4,489 per service unit, with a 1-inch meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate tap or meter charge may also apply.
    $4,489.00 one-time
  • Water Tap and Meter Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own retail water utility. Any one-time water tap or meter set charge by meter size is in addition to the water impact fee.
    Requires confirmation
Sewer$1,686.00 one-time
  • Wastewater Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 wastewater impact fee, effective September 1, 2024: $1,686 per service unit, with a 1-inch water meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate sewer tap charge may also apply.
    $1,686.00 one-time
  • Sewer Tap Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$11.27/sq ft
  • Roadway Impact Fee (City of Cedar Hill, Commercial) — ITE 821, 10.64 veh-mi × $1,059/veh-mi
    City of Cedar Hill
    Chapter 395 roadway impact fee, effective September 1, 2024: $1,059 per vehicle-mile, one rate citywide. A shopping center of 40,000 to 150,000 sq ft of leasable area generates 10.64 vehicle-miles per 1,000 sq ft. Other retail and service uses are charged by their own land-use row of the City's equivalency table. Assessed at plat recordation under state law.
    $11.27/sq ft
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cedar Hill): $11.27/sq ft + $6,175.00 one-time (≈ $569,563.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Hill Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Hill: Industrial Impact Fees

Industrial development in Cedar Hill pays $2.75 per square foot in impact fees, plus $6,175.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to at least $143,845.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Cedar Hill) — 1" meter ($4,489.00 one-time), Wastewater Impact Fee (City of Cedar Hill) — 1" meter ($1,686.00 one-time) and Roadway Impact Fee (City of Cedar Hill, Industrial) — ITE 110, 2.60 veh-mi × $1,059/veh-mi ($2.75/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Meter Fee (City of Cedar Hill) and Sewer Tap Fee (City of Cedar Hill) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Hill Impact Fee Schedule
Water$4,489.00 one-time
  • Water Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 water impact fee, effective September 1, 2024: $4,489 per service unit, with a 1-inch meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate tap or meter charge may also apply.
    $4,489.00 one-time
  • Water Tap and Meter Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own retail water utility. Any one-time water tap or meter set charge by meter size is in addition to the water impact fee.
    Requires confirmation
Sewer$1,686.00 one-time
  • Wastewater Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 wastewater impact fee, effective September 1, 2024: $1,686 per service unit, with a 1-inch water meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate sewer tap charge may also apply.
    $1,686.00 one-time
  • Sewer Tap Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$2.75/sq ft
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cedar Hill): $2.75/sq ft + $6,175.00 one-time (≈ $143,845.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Hill Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Hill: Office Impact Fees

Office development in Cedar Hill pays $6.10 per square foot in impact fees, plus $6,175.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to at least $158,671.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Cedar Hill) — 1" meter ($4,489.00 one-time), Wastewater Impact Fee (City of Cedar Hill) — 1" meter ($1,686.00 one-time) and Roadway Impact Fee (City of Cedar Hill, Office) — ITE 710, 5.76 veh-mi × $1,059/veh-mi ($6.10/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Tap and Meter Fee (City of Cedar Hill) and Sewer Tap Fee (City of Cedar Hill) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the Full Cedar Hill Impact Fee Schedule
Water$4,489.00 one-time
  • Water Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 water impact fee, effective September 1, 2024: $4,489 per service unit, with a 1-inch meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate tap or meter charge may also apply.
    $4,489.00 one-time
  • Water Tap and Meter Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own retail water utility. Any one-time water tap or meter set charge by meter size is in addition to the water impact fee.
    Requires confirmation
Sewer$1,686.00 one-time
  • Wastewater Impact Fee (City of Cedar Hill) — 1" meter
    City of Cedar Hill
    Chapter 395 wastewater impact fee, effective September 1, 2024: $1,686 per service unit, with a 1-inch water meter as one service unit and larger meters scaled by capacity (2-inch 3.2, 3-inch 7, 4-inch 12, 6-inch 27, 8-inch 36 units). The 40% reduction applies only to single-family and townhouse uses. A separate sewer tap charge may also apply.
    $1,686.00 one-time
  • Sewer Tap Fee (City of Cedar Hill)
    City of Cedar Hill
    Cedar Hill runs its own wastewater utility. Any one-time sewer tap charge is in addition to the wastewater impact fee.
    Requires confirmation
City$6.10/sq ft
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Cedar Hill): $6.10/sq ft + $6,175.00 one-time (≈ $158,671.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Cedar Hill Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cedar Hill Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Cedar Hill Impact Fee FAQs

What are the total impact fees for a single-family home in Cedar Hill, Texas?

A new single-family home in Cedar Hill pays $8,886.84 per unit in combined impact fees (rates sourced November 25, 2026).

How much are commercial impact fees in Cedar Hill?

Commercial development in Cedar Hill pays $11.27 per square foot in impact fees, plus $6,175.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $569,563.00 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Cedar Hill charge its own impact fees?

Yes. Cedar Hill levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Cedar Hill. The schedule on this page shows every fee that applies to development in Cedar Hill.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.