Skip to content
IMPACTFEES.ORG

Mesquite, Texas Impact Fees

Mesquite applies its own fee schedule. Dallas County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $10,437.00 per unit (rates sourced ). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Mesquite Impact Fees by Project Type

Mesquite: Single-Family Impact Fees

A new single-family home in Mesquite pays at least $10,437.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Mesquite) ($3,879.50), Roadway Impact Fee (City of Mesquite) ($3,108.00) and Wastewater Impact Fee (City of Mesquite) ($2,904.50).

Parkland Fee in Lieu (City of Mesquite) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Mesquite Impact Fee Schedule
Water$4,424.50
  • Water Impact Fee (City of Mesquite)
    5/8" meter
    City of Mesquite
    Mesquite Chapter 395 water impact fee: $3,879.50 per service unit; a standard 5/8 in. meter is 1 service unit and larger meters pay by the ordinance's meter equivalents. Collected rate set by Ordinance 4993 (2022), invoiced with the building permit. A separate water meter and meter box charge also applies.
    $3,879.50
  • Water Meter and Box (City of Mesquite) — 5/8" meter, $410 + $135 box
    City of Mesquite
    One-time water meter and meter box charge from the city's fee schedule effective October 1, 2026: 5/8 in. meter $410 plus box $135. Meters larger than 2 in. are priced by quote.
    $545.00
Sewer$2,904.50
  • Wastewater Impact Fee (City of Mesquite)
    5/8" meter
    City of Mesquite
    Mesquite Chapter 395 wastewater impact fee: $2,904.50 per service unit; a standard 5/8 in. meter is 1 service unit and larger meters pay by the ordinance's meter equivalents. Collected rate set by Ordinance 4993 (2022), invoiced with the building permit.
    $2,904.50
City$3,108.00
  • Roadway Impact Fee (City of Mesquite)
    City of Mesquite
    Mesquite Ch.395 roadway impact fee, $3,108 per single-family dwelling (ITE 210). Mesquite collects one uniform citywide rate even though maximum fees vary by three service areas. Effective per the current collection-rate schedule.
    $3,108.00
  • Parkland Fee in Lieu (City of Mesquite)
    City of Mesquite
    Mesquite requires parkland dedication or a fee in lieu under its subdivision ordinance (Appendix B, Article VI). Plats creating four or fewer single-family lots must pay the fee. The fee is based on the land value of the required park acreage, so it varies by site.
    Requires confirmation
County$0.00
Total (Mesquite): $10,437.00
Sources last checked Official fee schedules:City of Mesquite Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mesquite: Multifamily Impact Fees

A new multifamily unit in Mesquite pays at least $9,256.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Mesquite, MF) ($3,879.50), Wastewater Impact Fee (City of Mesquite, MF) ($2,904.50) and Roadway Impact Fee (City of Mesquite, MF) ($1,927.00).

Parkland Fee in Lieu (City of Mesquite, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Mesquite Impact Fee Schedule
Water$4,424.50
  • Water Impact Fee (City of Mesquite, MF)
    5/8" meter
    City of Mesquite
    Mesquite charges the water impact fee by meter size, not per unit: $3,879.50 per service unit (a 5/8 in. meter is 1). A master-metered apartment building pays once for its meter size (for example a 2 in. meter is 8 service units).
    $3,879.50
  • Water Meter and Box (City of Mesquite, MF) — 5/8" meter, $410 + $135 box
    City of Mesquite
    One-time water meter and meter box charge (fee schedule effective October 1, 2026): 5/8 in. meter $410 plus box $135. A master-metered building pays once for its meter.
    $545.00
Sewer$2,904.50
  • Wastewater Impact Fee (City of Mesquite, MF)
    5/8" meter
    City of Mesquite
    Mesquite charges the wastewater impact fee by meter size, not per unit: $2,904.50 per service unit (a 5/8 in. meter is 1). A master-metered apartment building pays once for its meter size.
    $2,904.50
City$1,927.00
  • Roadway Impact Fee (City of Mesquite, MF)
    City of Mesquite
    Mesquite Ch.395 roadway impact fee, $1,927 per multifamily dwelling unit (ITE 220). One uniform citywide collected rate.
    $1,927.00
  • Parkland Fee in Lieu (City of Mesquite, MF)
    City of Mesquite
    Mesquite requires multifamily projects to dedicate parkland or pay a fee in lieu at building permit (Appendix B, Article VI). The fee is based on the land value of the required park acreage, so it varies by site.
    Requires confirmation
County$0.00
Total (Mesquite): $9,256.00
Sources last checked Official fee schedules:City of Mesquite Dallas County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mesquite: Commercial Impact Fees

Commercial development in Mesquite pays $2.04 per square foot in impact fees, plus $17,877.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $120,077.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU ($9,698.75 one-time), Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU ($7,261.25 one-time) and Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box ($917.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mesquite Impact Fee Schedule
Water$10,615.75 one-time
  • Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU
    City of Mesquite
    Mesquite water impact fee for a 1 inch meter: 2.5 service units at $3,879.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $7,759 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit; the meter and meter box are charged separately.
    $9,698.75 one-time
  • Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box
    City of Mesquite
    Mesquite charge for a 1 inch water meter ($497) and its meter box ($420), effective October 1, 2026. Meters larger than 2 inches are priced by quote, and fittings are billed at cost plus 20%. Charged in addition to the water and wastewater impact fees.
    $917.00 one-time
Sewer$7,261.25 one-time
  • Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU
    City of Mesquite
    Mesquite wastewater impact fee for a 1 inch meter: 2.5 service units at $2,904.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $5,809 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit.
    $7,261.25 one-time
City$2.04/sq ft
  • Roadway Impact Fee (City of Mesquite, Commercial)
    City of Mesquite
    Mesquite roadway impact fee for a shopping center (ITE 820): $2,044 per 1,000 sq ft of gross leasable area, one collection rate in all three roadway service areas (Ord. 4993, October 2022). Assessed and invoiced with the building permit. A 2026 roadway impact fee study update is expected to go to City Council in early 2027.
    $2.04/sq ft
County$0.00
  • County Impact Fee (Dallas County, Commercial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Mesquite): $2.04/sq ft + $17,877.00 one-time (≈ $120,077.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Mesquite Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mesquite: Industrial Impact Fees

Industrial development in Mesquite pays $1.26 per square foot in impact fees, plus $17,877.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $80,827.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU ($9,698.75 one-time), Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU ($7,261.25 one-time) and Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box ($917.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mesquite Impact Fee Schedule
Water$10,615.75 one-time
  • Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU
    City of Mesquite
    Mesquite water impact fee for a 1 inch meter: 2.5 service units at $3,879.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $7,759 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit; the meter and meter box are charged separately.
    $9,698.75 one-time
  • Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box
    City of Mesquite
    Mesquite charge for a 1 inch water meter ($497) and its meter box ($420), effective October 1, 2026. Meters larger than 2 inches are priced by quote, and fittings are billed at cost plus 20%. Charged in addition to the water and wastewater impact fees.
    $917.00 one-time
Sewer$7,261.25 one-time
  • Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU
    City of Mesquite
    Mesquite wastewater impact fee for a 1 inch meter: 2.5 service units at $2,904.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $5,809 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit.
    $7,261.25 one-time
City$1.26/sq ft
  • Roadway Impact Fee (City of Mesquite, Industrial)
    City of Mesquite
    Mesquite roadway impact fee for general light industrial (ITE 110): $1,259 per 1,000 sq ft of gross floor area, one collection rate in all three roadway service areas (Ord. 4993, October 2022). Assessed and invoiced with the building permit. A 2026 roadway impact fee study update is expected to go to City Council in early 2027.
    $1.26/sq ft
County$0.00
  • County Impact Fee (Dallas County, Industrial)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Mesquite): $1.26/sq ft + $17,877.00 one-time (≈ $80,827.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Mesquite Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mesquite: Office Impact Fees

Office development in Mesquite pays $2.11 per square foot in impact fees, plus $17,877.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $70,577.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU ($9,698.75 one-time), Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU ($7,261.25 one-time) and Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box ($917.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Mesquite Impact Fee Schedule
Water$10,615.75 one-time
  • Water Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $3,879.50/SU
    City of Mesquite
    Mesquite water impact fee for a 1 inch meter: 2.5 service units at $3,879.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $7,759 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit; the meter and meter box are charged separately.
    $9,698.75 one-time
  • Water Meter and Meter Box Charge (City of Mesquite) — 1" meter, $497 + $420 box
    City of Mesquite
    Mesquite charge for a 1 inch water meter ($497) and its meter box ($420), effective October 1, 2026. Meters larger than 2 inches are priced by quote, and fittings are billed at cost plus 20%. Charged in addition to the water and wastewater impact fees.
    $917.00 one-time
Sewer$7,261.25 one-time
  • Wastewater Impact Fee (City of Mesquite) — 1" meter, 2.5 SU × $2,904.50/SU
    City of Mesquite
    Mesquite wastewater impact fee for a 1 inch meter: 2.5 service units at $2,904.50 each (Ord. 4993, October 2022; the collection rate is 50% of the $5,809 maximum). One citywide service area covers the city and its ETJ. Larger meters pay by their service unit equivalents. Assessed and invoiced with the building permit.
    $7,261.25 one-time
City$2.11/sq ft
  • Roadway Impact Fee (City of Mesquite, Office)
    City of Mesquite
    Mesquite roadway impact fee for a general office building (ITE 710): $2,108 per 1,000 sq ft of gross floor area, one collection rate in all three roadway service areas (Ord. 4993, October 2022). Assessed and invoiced with the building permit. A 2026 roadway impact fee study update is expected to go to City Council in early 2027.
    $2.11/sq ft
County$0.00
  • County Impact Fee (Dallas County, Office)
    Dallas County
    Texas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
    $0.00
Total (Mesquite): $2.11/sq ft + $17,877.00 one-time (≈ $70,577.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Mesquite Dallas County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Dallas County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Mesquite Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Mesquite Impact Fee FAQs

What are the total impact fees for a single-family home in Mesquite, Texas?

A new single-family home in Mesquite pays at least $10,437.00 per unit in combined impact fees (rates sourced November 25, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Mesquite?

Commercial development in Mesquite pays $2.04 per square foot in impact fees, plus $17,877.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $120,077.00 for a 50,000 sq ft building.

Does Mesquite charge its own impact fees?

Yes. Mesquite levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Mesquite. The schedule on this page shows every fee that applies to development in Mesquite.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Dallas County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.