Sunnyvale Impact Fees by Project Type
Sunnyvale: Single-Family Impact Fees
A new single-family home in Sunnyvale pays $16,570.71 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (Town of Sunnyvale) ($6,927.00), Roadway Impact Fee (Town of Sunnyvale) — 2.18 veh-mi × $2,532.15/veh-mi ($5,520.09) and Town-Wide Park Fee (Town of Sunnyvale) ($2,844.62).
View the Full Sunnyvale Impact Fee Schedule
- Water Impact Fee (Town of Sunnyvale)$6,927.00Town of SunnyvaleSunnyvale water impact fee: $6,927 per service unit (one service unit is a standard 3/4 in. or 1 in. meter, a typical home), for land platted on or after Feb. 24, 2025. Land platted earlier pays the rate locked at its plat date.
- Wastewater Impact Fee (Town of Sunnyvale)$1,279.00Town of SunnyvaleSunnyvale wastewater impact fee: $1,279 per service unit (one service unit is a standard 3/4 in. or 1 in. meter, a typical home), for land platted on or after Feb. 24, 2025. Sewer taps are charged at contract cost plus 15%.
- Roadway Impact Fee (Town of Sunnyvale) — 2.18 veh-mi × $2,532.15/veh-mi$5,520.09Town of SunnyvaleSunnyvale roadway impact fee for a single-family home: 2.18 vehicle-miles at $2,532.15 each, for land platted on or after Feb. 24, 2025. Land platted earlier pays the rate locked at its plat date.
- Town-Wide Park Fee (Town of Sunnyvale)$2,844.62Town of SunnyvaleSunnyvale charges a town-wide park fee of $2,844.62 per dwelling unit, due before the building permit. Homes in a designated neighborhood park area can also owe a neighborhood park fee.
- County Impact Fees (Dallas County)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Sunnyvale.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunnyvale: Multifamily Impact Fees
A new multifamily unit in Sunnyvale pays at least $5,832.56 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Roadway Impact Fee (Town of Sunnyvale, MF) — 1.18 veh-mi × $2,532.15/veh-mi ($2,987.94) and Town-Wide Park Fee (Town of Sunnyvale, MF) ($2,844.62).
Wastewater Impact Fee (Town of Sunnyvale, MF) and Water Impact Fee (Town of Sunnyvale, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the Full Sunnyvale Impact Fee Schedule
- Water Impact Fee (Town of Sunnyvale, MF)Requires confirmationTown of SunnyvaleSunnyvale's water impact fee is $6,927 per service unit, where one service unit is a 3/4 in. or 1 in. meter. The fee for a multifamily building depends on the size of the meter serving it, and the Town has not published its meter table online.
- Wastewater Impact Fee (Town of Sunnyvale, MF)Requires confirmationTown of SunnyvaleSunnyvale's wastewater impact fee is $1,279 per service unit, where one service unit is a 3/4 in. or 1 in. meter. The fee for a multifamily building depends on the size of the meter serving it, and the Town has not published its meter table online.
- Roadway Impact Fee (Town of Sunnyvale, MF) — 1.18 veh-mi × $2,532.15/veh-mi$2,987.94Town of SunnyvaleSunnyvale roadway impact fee per multifamily unit: 1.18 vehicle-miles at $2,532.15 each, for land platted on or after Feb. 24, 2025.
- Town-Wide Park Fee (Town of Sunnyvale, MF)$2,844.62Town of SunnyvaleSunnyvale charges a town-wide park fee of $2,844.62 per dwelling unit, multifamily included, due before the building permit.
- County Impact Fees (Dallas County, MF)$0.00Dallas CountyTexas counties do not levy development impact fees; no county impact fee applies in Sunnyvale.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunnyvale: Commercial Impact Fees
Commercial development in Sunnyvale pays $12.90 per square foot in impact fees, plus $8,206.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $653,010.50. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (Town of Sunnyvale, Commercial) — 6.66 veh-mi per 1,000 sf × $1,936.35/veh-mi ($12.90/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of Sunnyvale) — 1" meter and Wastewater Impact Fee (Town of Sunnyvale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sunnyvale Impact Fee Schedule
- Water Impact Fee (Town of Sunnyvale) — 1" meter$6,927.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale water impact fee: $6,927 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Land platted earlier pays the rate in effect at plat recording. The meter, meter box and tap are billed separately at actual cost plus 25%.
- Wastewater Impact Fee (Town of Sunnyvale) — 1" meter$1,279.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale wastewater impact fee: $1,279 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Irrigation meters carry no wastewater service units.
- Roadway Impact Fee (Town of Sunnyvale, Commercial) — 6.66 veh-mi per 1,000 sf × $1,936.35/veh-mi$12.90/sq ftTown of SunnyvaleSunnyvale roadway impact fee for a shopping plaza (40,000 to 150,000 sq ft): 6.66 vehicle-miles per 1,000 sq ft of gross leasable area at $1,936.35 per vehicle-mile, $12,896.09 per 1,000 sq ft, for land platted on or after February 24, 2025 (Ordinance 2025-04; 65% of the $2,979 maximum). Land platted earlier pays the rate in effect at plat recording.
- County Impact Fee (Dallas County, Commercial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunnyvale: Industrial Impact Fees
Industrial development in Sunnyvale pays $2.92 per square foot in impact fees, plus $8,206.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $154,400.50. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (Town of Sunnyvale, Industrial) — 1.51 veh-mi per 1,000 sf × $1,936.35/veh-mi ($2.92/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of Sunnyvale) — 1" meter and Wastewater Impact Fee (Town of Sunnyvale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sunnyvale Impact Fee Schedule
- Water Impact Fee (Town of Sunnyvale) — 1" meter$6,927.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale water impact fee: $6,927 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Land platted earlier pays the rate in effect at plat recording. The meter, meter box and tap are billed separately at actual cost plus 25%.
- Wastewater Impact Fee (Town of Sunnyvale) — 1" meter$1,279.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale wastewater impact fee: $1,279 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Irrigation meters carry no wastewater service units.
- Roadway Impact Fee (Town of Sunnyvale, Industrial) — 1.51 veh-mi per 1,000 sf × $1,936.35/veh-mi$2.92/sq ftTown of SunnyvaleSunnyvale roadway impact fee for general light industrial use: 1.51 vehicle-miles per 1,000 sq ft of gross floor area at $1,936.35 per vehicle-mile, $2,923.89 per 1,000 sq ft, for land platted on or after February 24, 2025 (Ordinance 2025-04; 65% of the $2,979 maximum). Land platted earlier pays the rate in effect at plat recording.
- County Impact Fee (Dallas County, Industrial)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunnyvale: Office Impact Fees
Office development in Sunnyvale pays $5.96 per square foot in impact fees, plus $8,206.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $157,305.00. The calculator below adjusts to your exact square footage.
The largest line items are Roadway Impact Fee (Town of Sunnyvale, Office) — 3.08 veh-mi per 1,000 sf × $1,936.35/veh-mi ($5.96/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Impact Fee (Town of Sunnyvale) — 1" meter and Wastewater Impact Fee (Town of Sunnyvale) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full Sunnyvale Impact Fee Schedule
- Water Impact Fee (Town of Sunnyvale) — 1" meter$6,927.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale water impact fee: $6,927 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Land platted earlier pays the rate in effect at plat recording. The meter, meter box and tap are billed separately at actual cost plus 25%.
- Wastewater Impact Fee (Town of Sunnyvale) — 1" meter$1,279.00 one-timeRequires confirmationTown of SunnyvaleSunnyvale wastewater impact fee: $1,279 per service unit for land platted on or after February 24, 2025 (Ordinance 2025-04); the town code defines one service unit as a 3/4 inch or 1 inch water meter, and larger meters pay more service units. Irrigation meters carry no wastewater service units.
- Roadway Impact Fee (Town of Sunnyvale, Office) — 3.08 veh-mi per 1,000 sf × $1,936.35/veh-mi$5.96/sq ftTown of SunnyvaleSunnyvale roadway impact fee for a general office building: 3.08 vehicle-miles per 1,000 sq ft of gross floor area at $1,936.35 per vehicle-mile, $5,963.96 per 1,000 sq ft, for land platted on or after February 24, 2025 (Ordinance 2025-04; 65% of the $2,979 maximum). Land platted earlier pays the rate in effect at plat recording.
- County Impact Fee (Dallas County, Office)$0.00Dallas CountyTexas counties cannot levy impact fees under Local Government Code Chapter 395, so Dallas County charges no county impact fee on commercial, office or industrial development.
Where in Dallas County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Sunnyvale Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Sunnyvale Impact Fee FAQs
What are the total impact fees for a single-family home in Sunnyvale, Texas?
A new single-family home in Sunnyvale pays $16,570.71 per unit in combined impact fees (rates sourced November 25, 2026).
How much are commercial impact fees in Sunnyvale?
Commercial development in Sunnyvale pays $12.90 per square foot in impact fees, plus $8,206.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $653,010.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Sunnyvale charge its own impact fees?
Yes. Sunnyvale levies its own municipal impact or utility fees. Dallas County does not currently add county-level impact fees inside Sunnyvale. The schedule on this page shows every fee that applies to development in Sunnyvale.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Dallas County impact fees page.