Belle Glade Impact Fees by Project Type
Belle Glade: Single-Family Impact Fees
A new single-family home in Belle Glade pays $4,700.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept - Glades) ($2,720.00) and Sewer Connection (Capacity) Fee (PBC Water Utilities Dept - Glades) ($1,980.00).
View the Full Belle Glade Impact Fee Schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept - Glades)$2,720.00Palm Beach County Water Utilities DeptWater service is provided by the Palm Beach County Water Utilities Department. One-time connection/capacity charge for a single-family home on a 5/8"×3/4" meter ($2,720, FY2026). County impact fees are $0 in the Glades, but this utility connection charge is separate and still applies.
- Sewer Connection (Capacity) Fee (PBC Water Utilities Dept - Glades)$1,980.00Palm Beach County Water Utilities DeptWastewater service is provided by the Palm Beach County Water Utilities Department. One-time connection/capacity charge for a single-family home ($1,980, FY2026). County impact fees are $0 in the Glades, but this utility connection charge is separate and still applies.
- Municipal Impact Fees (City of Belle Glade)$0.00City of Belle GladeThe City of Belle Glade does not charge municipal impact fees of its own; only Palm Beach County's countywide impact fees apply to new construction in the Belle Glade (per the county's 2026 impact fee schedule). Under the county's 2026 schedule, county impact fee amounts for construction in Belle Glade are $0 across all categories.
- Library Impact Fee (Palm Beach County)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Road Impact Fee (SFR Detached)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Parks Impact Fee (SFR)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Fire Rescue Impact Fee (Palm Beach County)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Law Enforcement Impact Fee (Palm Beach County)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- School Impact Fee (SFR)$0.00School District of Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Public Buildings Impact Fee (Palm Beach County)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
Where in Palm Beach County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belle Glade: Multifamily Impact Fees
A new multifamily unit in Belle Glade pays $2,961.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept - Glades, MF) ($1,714.00) and Sewer Connection (Capacity) Fee (PBC Water Utilities Dept - Glades, MF) ($1,247.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Belle Glade Impact Fee Schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept - Glades, MF)$1,714.00Palm Beach County Water Utilities DeptWater service is provided by the Palm Beach County Water Utilities Department. One-time connection/capacity charge per multifamily dwelling unit ($1,714, FY2026). County impact fees are $0 in the Glades, but this utility connection charge is separate and still applies.
- Sewer Connection (Capacity) Fee (PBC Water Utilities Dept - Glades, MF)$1,247.00Palm Beach County Water Utilities DeptWastewater service is provided by the Palm Beach County Water Utilities Department. One-time connection/capacity charge per multifamily dwelling unit ($1,247, FY2026). County impact fees are $0 in the Glades, but this utility connection charge is separate and still applies.
- Municipal Impact Fees (City of Belle Glade, MF)$0.00City of Belle GladeThe City of Belle Glade does not charge municipal impact fees of its own; only Palm Beach County's countywide impact fees apply to new construction in the Belle Glade (per the county's 2026 impact fee schedule). Under the county's 2026 schedule, county impact fee amounts for construction in Belle Glade are $0 across all categories.
- Parks Impact Fee (MF)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- School Impact Fee (MF)$0.00School District of Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Law Enforcement Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Public Buildings Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Road Impact Fee (MF)$0.00MF Mid/High-Rise, 4+ levelsPalm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Fire Rescue Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
- Library Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPalm Beach County impact fees are not levied in Belle Glade: the County's 2026 schedule shows $0 in every category for the Glades-area municipalities (Belle Glade, Pahokee, South Bay). Utility water and sewer connection charges still apply separately.
Where in Palm Beach County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belle Glade: Commercial Impact Fees
Commercial development in Belle Glade pays no per-square-foot impact fees, but owes $27,260.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $27,260.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time) and Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Belle Glade Impact Fee Schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
- Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$11,484.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
- City Impact Fees (City of Belle Glade, Commercial)$0.00City of Belle GladeThe City of Belle Glade levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply.
- County Impact Fees (Palm Beach County, Commercial)$0.00Palm Beach CountyAll Palm Beach County nonresidential impact fees are fully waived in this Glades-area municipality ($0 across every county component). Effective January 1, 2026.
Where in Palm Beach County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belle Glade: Industrial Impact Fees
Industrial development in Belle Glade pays no per-square-foot impact fees, but owes $27,260.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $27,260.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time) and Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Belle Glade Impact Fee Schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
- Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$11,484.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
- City Impact Fees (City of Belle Glade, Industrial)$0.00City of Belle GladeThe City of Belle Glade levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply.
- County Impact Fees (Palm Beach County, Industrial)$0.00Palm Beach CountyPalm Beach County's impact fee table for the City of Belle Glade, effective January 1, 2026, prints $0.00 for every county impact fee (public buildings, road, fire rescue, law enforcement, parks, library, school) on nonresidential development.
Where in Palm Beach County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belle Glade: Office Impact Fees
Office development in Belle Glade pays no per-square-foot impact fees, but owes $27,260.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to about $27,260.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time) and Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Belle Glade Impact Fee Schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
- Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$11,484.00 one-timePalm Beach County Water Utilities DeptPalm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
- City Impact Fees (City of Belle Glade, Office)$0.00City of Belle GladeThe City of Belle Glade levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply.
- County Impact Fees (Palm Beach County, Office)$0.00Palm Beach CountyPalm Beach County's impact fee table for the City of Belle Glade, effective January 1, 2026, prints $0.00 for every county impact fee (public buildings, road, fire rescue, law enforcement, parks, library, school) on nonresidential development.
Where in Palm Beach County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Belle Glade Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.
Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.
New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Belle Glade Impact Fee FAQs
What are the total impact fees for a single-family home in Belle Glade, Florida?
A new single-family home in Belle Glade pays $4,700.00 per unit in combined impact fees (rates sourced July 17, 2026).
How much are commercial impact fees in Belle Glade?
Commercial development in Belle Glade pays no per-square-foot impact fees, but owes $27,260.00 in one-time water and sewer connection fees (assuming a 1-inch meter).
Does Belle Glade charge its own impact fees?
No. Belle Glade does not levy its own municipal impact fees. New development in Belle Glade pays Palm Beach County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Palm Beach County impact fees page.