Tequesta, Florida Impact Fees

Tequesta applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $23,387.66 per unit (rates sourced July 17, 2026). The full breakdown is below.

Tequesta impact fees by project type

Tequesta: Single-Family Impact Fees

A new single-family home in Tequesta pays $23,387.66 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $14,983.11 and municipal or utility fees for $8,404.55.

The largest line items are County School (Educational Facilities) Impact Fee (SFR) ($7,905.90), County Road (Fair Share) Impact Fee (SFR) ($5,597.40) and Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($4,370.44).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$4,034.11
  • Water Capital Connection Charge (Village of Tequesta)
    Village of Tequesta Utilities Dept
    CONFIRMED 7/14/2026 audit (was $0). Resolution No. 14-23 (adopted 7/13/2023), Exhibit A 'Water Utilities Schedule of Rates and Charges' — Capital Connection Charge (New or Upgraded Development) by meter size. FY26 column (eff. 10/1/2025): 5/8"-3/4" = $4,034.11; 1" = $10,085.16. STEPS UP: FY27 (eff. 10/1/2026) = $4,175.30; FY28 = $4,321.44. Separate $2,462.27/connection Special Distribution Line Charge applies on Harbor Road North only. (Exhibit A is an image PDF — read via the Google Docs viewer.)
    $4,034.11
Sewer$4,370.44
City$0.00
  • Municipal Impact Fee (Village of Tequesta)
    Village of Tequesta
    $0 placeholder — no municipal (non-utility) impact fee found for Village of Tequesta; PBC county overlay impact fees apply. Confirm no city impact fee — Village 561-768-0450.
    $0.00
County$14,983.11

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$20,617.22Atlantis$15,341.31Includes unconfirmed feesBelle Glade$4,700.00Includes unconfirmed feesBoca Raton$28,250.38Boynton Beach$19,078.24Includes unconfirmed feesBriny Breezes$14,709.90Includes unconfirmed feesCloud Lake$15,917.22Includes unconfirmed feesDelray Beach$16,689.38Glen Ridge$18,637.22Includes unconfirmed feesGolf$15,228.47Includes unconfirmed feesGreenacres$19,683.11Includes unconfirmed feesGulf Stream$15,372.47Includes unconfirmed feesHaverhill$18,637.22Highland Beach$14,842.47Includes unconfirmed feesHypoluxo$21,091.31Includes unconfirmed feesJuno Beach$18,231.22Includes unconfirmed feesJupiter$19,376.57Includes unconfirmed feesJupiter Inlet Colony$19,508.36Includes unconfirmed feesLake Clarke Shores$15,734.61Includes unconfirmed feesLake Park$17,973.66Includes unconfirmed feesLake Worth Beach$21,013.54Includes unconfirmed feesLantana$14,710.68Includes unconfirmed feesLoxahatchee Groves$15,917.22Includes unconfirmed feesManalapan$14,842.47Includes unconfirmed feesMangonia Park$15,175.81Includes unconfirmed feesNorth Palm Beach$17,580.36Includes unconfirmed feesOcean Ridge$15,137.92Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$17,101.95Includes unconfirmed feesPalm Beach Gardens$29,323.11Includes unconfirmed feesPalm Beach Shores$19,409.90Includes unconfirmed feesPalm Springs$15,273.66Includes unconfirmed feesRiviera Beach$18,257.38Includes unconfirmed feesRoyal Palm Beach$20,076.41Includes unconfirmed feesSouth Bay$4,700.00Includes unconfirmed feesSouth Palm Beach$22,780.70Includes unconfirmed fees
Tequesta$23,387.66this page
Wellington$21,691.41West Palm Beach$18,937.66Includes unconfirmed feesWestlake$15,917.22Includes unconfirmed fees

Tequesta: Multifamily Impact Fees

A new multifamily unit in Tequesta pays at least $14,298.80 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $9,928.36 and municipal or utility fees for $4,370.44.

The largest line items are County School (Educational Facilities) Impact Fee (MF) ($6,170.25), County Road (Fair Share) Impact Fee (MF, Mid/High-Rise 4+) ($2,554.55) and County Parks & Recreation Impact Fee (MF) ($723.81).

Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Water Capital Connection Charge (Village of Tequesta, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Capital Connection Charge (Village of Tequesta, MF)
    Village of Tequesta Utilities Dept
    UNCONFIRMED per-unit basis (re-searched 7/14/2026). Tequesta's Capital Connection Charge (Res. 14-23, Exhibit A) is set BY METER SIZE ONLY — there is no multifamily per-dwelling-unit rate published, so an MF project's charge depends on master-meter sizing, not unit count. FY26 (eff. 10/1/2025): 5/8"-3/4" $4,034.11; 1" $10,085.16. Do NOT copy the SFR figure onto this row. CALL Tequesta Utilities to confirm how a master-metered apartment building is assessed.
    Requires confirmation
Sewer$4,370.44
City$0.00
County$9,928.36
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$13,575.74Atlantis$10,250.90Includes unconfirmed feesBelle Glade$2,961.00Includes unconfirmed feesBoca Raton$22,255.54Boynton Beach$12,529.62Includes unconfirmed feesBriny Breezes$9,711.70Includes unconfirmed feesCloud Lake$10,614.74Includes unconfirmed feesDelray Beach$11,764.54Glen Ridge$12,328.74Includes unconfirmed feesGolf$10,114.09Includes unconfirmed feesGreenacres$12,889.36Includes unconfirmed feesGulf Stream$10,370.67Includes unconfirmed feesHaverhill$12,328.74Highland Beach$9,840.67Includes unconfirmed feesHypoluxo$14,000.90Includes unconfirmed feesJuno Beach$12,504.32Includes unconfirmed feesJupiter$14,263.63Includes unconfirmed feesJupiter Inlet Colony$14,447.66Includes unconfirmed feesLake Clarke Shores$10,515.00Includes unconfirmed feesLake Park$12,300.12Includes unconfirmed feesLake Worth Beach$13,847.44Includes unconfirmed feesLantana$9,656.64Includes unconfirmed feesLoxahatchee Groves$10,614.74Includes unconfirmed feesManalapan$9,840.67Includes unconfirmed feesMangonia Park$10,109.57Includes unconfirmed feesNorth Palm Beach$12,036.02Includes unconfirmed feesOcean Ridge$10,077.22Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$9,475.15Includes unconfirmed feesPalm Beach Gardens$22,374.16Includes unconfirmed feesPalm Beach Shores$12,672.70Includes unconfirmed feesPalm Springs$10,137.12Includes unconfirmed feesRiviera Beach$13,332.54Includes unconfirmed feesRoyal Palm Beach$13,153.46Includes unconfirmed feesSouth Bay$2,961.00Includes unconfirmed feesSouth Palm Beach$15,042.96Includes unconfirmed fees
Tequesta$14,298.80this pageIncludes unconfirmed fees
Wellington$15,578.46West Palm Beach$9,691.81Includes unconfirmed feesWestlake$10,614.74Includes unconfirmed fees

Tequesta: Commercial Impact Fees

Commercial development in Tequesta pays $8.37 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $422,161.35. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).

Water Capital Connection Charge (Village of Tequesta Water Utility) is set by the utility and not published online. City Impact Fees (Village of Tequesta, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capital Connection Charge (Village of Tequesta Water Utility)
    Village of Tequesta
    Village of Tequesta Water Utility: Capital Connection Charge is actual cost + 10% admin (no fixed published capacity fee); monthly Capacity Reservation Fee $11.92/ERU is recurring (not a one-time impact fee). $0 placeholder — VERIFY (561) 768-0700.
    Requires confirmation
Sewer$3,496.35 one-time
City$0.00
County$8.37/sq ft
Total (Tequesta): $8.37/sq ft + $3,496.35 one-time (≈ $422,161.35 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed feesJuno Beach$429,535.00Includes unconfirmed feesJupiter$430,331.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed fees
Tequesta$422,161.35this pageIncludes unconfirmed fees
Wellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Tequesta: Industrial Impact Fees

Industrial development in Tequesta pays $2.27 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $117,211.35. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

Water Capital Connection Charge (Village of Tequesta Water Utility) is set by the utility and not published online. City Impact Fees (Village of Tequesta, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capital Connection Charge (Village of Tequesta Water Utility)
    Village of Tequesta
    Village of Tequesta Water Utility: Capital Connection Charge is actual cost + 10% admin (no fixed published capacity fee); monthly Capacity Reservation Fee $11.92/ERU is recurring (not a one-time impact fee). $0 placeholder — VERIFY (561) 768-0700.
    Requires confirmation
Sewer$3,496.35 one-time
City$0.00
County$2.27/sq ft
Total (Tequesta): $2.27/sq ft + $3,496.35 one-time (≈ $117,211.35 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed feesJuno Beach$122,115.00Includes unconfirmed feesJupiter$122,911.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed fees
Tequesta$117,211.35this pageIncludes unconfirmed fees
Wellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Tequesta: Office Impact Fees

Office development in Tequesta pays $5.06 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $129,917.60. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).

Water Capital Connection Charge (Village of Tequesta Water Utility) is set by the utility and not published online. City Impact Fees (Village of Tequesta, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Capital Connection Charge (Village of Tequesta Water Utility)
    Village of Tequesta
    Village of Tequesta Water Utility: Capital Connection Charge is actual cost + 10% admin (no fixed published capacity fee); monthly Capacity Reservation Fee $11.92/ERU is recurring (not a one-time impact fee). $0 placeholder — VERIFY (561) 768-0700.
    Requires confirmation
Sewer$3,496.35 one-time
City$0.00
County$5.06/sq ft
Total (Tequesta): $5.06/sq ft + $3,496.35 one-time (≈ $129,917.60 at 25,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed feesJuno Beach$130,902.50Includes unconfirmed feesJupiter$131,698.85Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed fees
Tequesta$129,917.60this pageIncludes unconfirmed fees
Wellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Estimate your project in Tequesta

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Tequesta, Florida?

A new single-family home in Tequesta pays $23,387.66 per unit in combined impact fees (rates sourced July 17, 2026).

How much are commercial impact fees in Tequesta?

Commercial development in Tequesta pays $8.37 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees, at least $422,161.35 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Tequesta charge its own impact fees?

Yes. Tequesta levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Tequesta, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000