Haverhill impact fees by project type
Haverhill: Single-Family Impact Fees
A new single-family home in Haverhill pays $18,637.22 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.
The largest line items are School Impact Fee (SFR, 2,000-3,599 sq ft) ($7,905.90), Road Impact Fee (SFR Detached) ($5,597.40) and Water Connection (Capacity) Fee (PBC Water Utilities Dept) ($2,720.00).
View the full fee schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept)$2,720.00Palm Beach County Water Utilities DepartmentCONFIRMED 7/14/2026 audit (was $0 with no provider and no URL). Haverhill is served by the PBCWUD central potable water system — stated in the Town's 2009 Comprehensive Plan Element 6 (Table 6.6-1) and corroborated by PBCWUD's 2024 Water Quality Report, which names 'the Town of Haverhill' in its eastern service area. PBCWUD UPAP Ch.6 §6.3.2 (Oct 2025, FY2026): SFR 5/8"x3/4" water connection fee = $2,720. (A few individual private wells remain.)
- Sewer Connection Fee (Town of Haverhill - septic)$0.00PBC Water Utilities Dept (likely)CONFIRMED $0 (7/14/2026 audit). This is a FINDING, not a gap: Haverhill has no central sanitary sewer. The Town's Comprehensive Plan Element 6, Policy 2.1 states that individual septic tanks (OSTDS) serve the town and that 'it is unnecessary to consider a plan for the provision of a sanitary sewer system to the unserved areas.' Central wastewater exists only where PBCWUD lines already run; if a parcel connects to PBCWUD sewer, the fee is $1,980 SFR (UPAP Ch.6 §6.3.2).
- Municipal Impact Fees (Town of Haverhill)$0.00Town of HaverhillCONFIRMED $0 (7/14/2026 audit; previously an unsourced placeholder). The Town's full Municode chapter list contains no impact-fee chapter and no utilities chapter. Only PBC county impact fees apply.
- School Impact Fee (SFR, 2,000-3,599 sq ft)$7,905.90Palm Beach County / School District of PBCPBC School impact fee, 2,000-3,599 sf. Eff 1/1/2026.
- Road Impact Fee (SFR Detached)$5,597.40Palm Beach CountyPBC Fair Share Road impact fee, SF Detached. Eff 1/1/2026.
- Parks Impact Fee (SFR, 2,000-3,599 sq ft)$1,225.26Palm Beach CountyPBC Parks impact fee, 2,000-3,599 sf. Eff 1/1/2026.
- Fire/Rescue Impact Fee (SFR)$393.30Palm Beach CountyPBC Fire Rescue impact fee, Single Family, Haverhill (served by PBC Fire Rescue). Eff 1/1/2026.
- Public Buildings Impact Fee (SFR, 2,000-3,599 sq ft)$317.30Palm Beach CountyPBC Public Buildings impact fee, 2,000-3,599 sf. Eff 1/1/2026.
- Library Impact Fee (SFR, 2,000-3,599 sq ft)$295.45Palm Beach CountyPBC Library impact fee, 2,000-3,599 sf (Haverhill in county library district). Eff 1/1/2026.
- Law Enforcement Impact Fee (SFR)$182.61Palm Beach CountyPBC Law Enforcement (Patrol) impact fee, Single Family, Haverhill (PBSO patrol). Eff 1/1/2026.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Haverhill: Multifamily Impact Fees
A new multifamily unit in Haverhill pays $12,328.74 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.
The largest line items are School Impact Fee (MF, 801-1,399 sq ft) ($6,170.25), Road Impact Fee (MF, Mid/High-Rise 4+ levels) ($2,554.55) and Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF) ($1,714.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF)$1,714.00Palm Beach County Water Utilities DepartmentCONFIRMED 7/14/2026 audit (was $0 with no provider and no URL). Haverhill is on the PBCWUD central water system (Town Comp Plan Element 6, Table 6.6-1; PBCWUD 2024 CCR names the Town). PBCWUD UPAP Ch.6 §6.3.2 (Oct 2025, FY2026): Multi-Family per dwelling unit water = $1,714.
- Sewer Connection Fee (Town of Haverhill - septic, MF)$0.00PBC Water Utilities Dept (likely)CONFIRMED $0 (7/14/2026 audit). A FINDING, not a gap: Haverhill has no central sanitary sewer. Comp Plan Element 6, Policy 2.1 — individual septic tanks (OSTDS) serve the town and 'it is unnecessary to consider a plan for the provision of a sanitary sewer system to the unserved areas.' Where PBCWUD lines exist, MF sewer would be $1,247/unit.
- Municipal Impact Fees (Town of Haverhill, MF)$0.00Town of HaverhillCONFIRMED $0 (7/14/2026 audit). No impact-fee chapter and no utilities chapter in the Town's full Municode chapter list. Only PBC county fees apply.
- School Impact Fee (MF, 801-1,399 sq ft)$6,170.25Palm Beach County / School District of PBCPBC School impact fee, 801-1,399 sf. Eff 1/1/2026.
- Road Impact Fee (MF, Mid/High-Rise 4+ levels)$2,554.55Palm Beach CountyPBC Fair Share Road, MF Mid/High-Rise (>4 levels). Eff 1/1/2026. Default MF tier.
- Parks Impact Fee (MF, 801-1,399 sq ft)$1,046.35Palm Beach CountyPBC Parks impact fee, 801-1,399 sf. Eff 1/1/2026.
- Fire/Rescue Impact Fee (MF)$264.10Palm Beach CountyPBC Fire Rescue impact fee, Multifamily, Haverhill (PBC Fire Rescue). Eff 1/1/2026.
- Public Buildings Impact Fee (MF, 801-1,399 sq ft)$243.20Palm Beach CountyPBC Public Buildings impact fee, 801-1,399 sf. Eff 1/1/2026.
- Library Impact Fee (MF, 801-1,399 sq ft)$236.55Palm Beach CountyPBC Library impact fee, 801-1,399 sf. Eff 1/1/2026.
- Law Enforcement Impact Fee (MF)$99.74Palm Beach CountyPBC Law Enforcement impact fee, Multifamily, Haverhill (PBSO). Eff 1/1/2026.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Haverhill: Commercial Impact Fees
Commercial development in Haverhill pays $8.62 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $446,696.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePBCWUD UPAP Ch.6 §6.3.2 Non-Residential potable water connection fee, FY2026. Canonical 1" meter. Full ladder: 5/8x3/4"=$4,624, 1"=$15,776, 1.5"=$28,288, 2"=$49,776, 3"=$119,136, 4"+ By Dept Analysis. PBCWUD serves Haverhill.
- Sewer Connection Fee (Town of Haverhill — septic/OSTDS, no central sewer)$0.00CONFIRMED $0. Haverhill has no central sanitary sewer (Comp Plan Element 6 Policy 2.1: septic/OSTDS serve the town). Where a parcel abuts an existing PBCWUD sewer line, PBCWUD's nonres wastewater connection fee applies (UPAP Ch.6 §6.3.2: 1"=$11,484, full ladder in PBCWUD records).
- City Impact Fees (Town of Haverhill, Commercial)$0.00CONFIRMED $0. Town's full Municode chapter list has no impact-fee chapter and no utilities chapter; only PBC county impact fees apply.
- Road (Fair Share) Impact Fee (Palm Beach County, Commercial)$7.91/sq ftPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: General Commercial Retail 40,000-150,000 sf. Per 1,000 sf.
- Public Buildings Impact Fee (Palm Beach County, Commercial)$0.47/sq ftPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: Retail 40,000-150,000 sf. Per 1,000 sf.
- Fire Rescue Impact Fee (Palm Beach County, Commercial)$0.16/sq ftHaverhill served by PBC Fire Rescue — nonres fee applies. Schedule row: Retail 40,000-150,000 sf. Per 1,000 sf, eff 1/1/2026.
- Law Enforcement Impact Fee (Palm Beach County, Commercial)$0.08/sq ftCloud Lake/Haverhill served by PBSO (Law Enforcement Patrol). Schedule row: Retail 40,000-150,000 sf. Per 1,000 sf, eff 1/1/2026.
- Parks/Library/School Impact Fees (Palm Beach County, Commercial)$0.00PBC Parks, Library and School impact fees have no nonresidential rows (residential-only). $0 confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Haverhill: Industrial Impact Fees
Industrial development in Haverhill pays $2.40 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to about $135,716.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePBCWUD UPAP Ch.6 §6.3.2 Non-Residential potable water connection fee, FY2026. Canonical 1" meter. Full ladder: 5/8x3/4"=$4,624, 1"=$15,776, 1.5"=$28,288, 2"=$49,776, 3"=$119,136, 4"+ By Dept Analysis. PBCWUD serves Haverhill.
- Sewer Connection Fee (Town of Haverhill — septic/OSTDS, no central sewer)$0.00CONFIRMED $0. Haverhill has no central sanitary sewer (Comp Plan Element 6 Policy 2.1: septic/OSTDS serve the town). Where a parcel abuts an existing PBCWUD sewer line, PBCWUD's nonres wastewater connection fee applies (UPAP Ch.6 §6.3.2: 1"=$11,484, full ladder in PBCWUD records).
- City Impact Fees (Town of Haverhill, Industrial)$0.00CONFIRMED $0. Town's full Municode chapter list has no impact-fee chapter and no utilities chapter; only PBC county impact fees apply.
- Road (Fair Share) Impact Fee (Palm Beach County, Industrial)$2.17/sq ftPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: General Industrial. Per 1,000 sf.
- Fire Rescue Impact Fee (Palm Beach County, Industrial)$0.11/sq ftHaverhill served by PBC Fire Rescue. Schedule row: General Industrial. Per 1,000 sf, eff 1/1/2026.
- Public Buildings Impact Fee (Palm Beach County, Industrial)$0.10/sq ftPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: General Industrial. Per 1,000 sf.
- Law Enforcement Impact Fee (Palm Beach County, Industrial)$0.01/sq ftHaverhill served by PBSO. Schedule row: General Industrial. Per 1,000 sf, eff 1/1/2026.
- Parks/Library/School Impact Fees (Palm Beach County, Industrial)$0.00PBC Parks, Library and School impact fees have no nonresidential rows (residential-only). $0 confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Haverhill: Office Impact Fees
Office development in Haverhill pays $5.14 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to about $144,351.50. The calculator below adjusts to your exact square footage.
The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the full fee schedule
- Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter$15,776.00 one-timePBCWUD UPAP Ch.6 §6.3.2 Non-Residential potable water connection fee, FY2026. Canonical 1" meter. Full ladder: 5/8x3/4"=$4,624, 1"=$15,776, 1.5"=$28,288, 2"=$49,776, 3"=$119,136, 4"+ By Dept Analysis. PBCWUD serves Haverhill.
- Sewer Connection Fee (Town of Haverhill — septic/OSTDS, no central sewer)$0.00CONFIRMED $0. Haverhill has no central sanitary sewer (Comp Plan Element 6 Policy 2.1: septic/OSTDS serve the town). Where a parcel abuts an existing PBCWUD sewer line, PBCWUD's nonres wastewater connection fee applies (UPAP Ch.6 §6.3.2: 1"=$11,484, full ladder in PBCWUD records).
- City Impact Fees (Town of Haverhill, Office)$0.00CONFIRMED $0. Town's full Municode chapter list has no impact-fee chapter and no utilities chapter; only PBC county impact fees apply.
- Road (Fair Share) Impact Fee (Palm Beach County, Office)$4.87/sq ftPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: General Office. Per 1,000 sf.
- Public Buildings Impact Fee (Palm Beach County, Office)$0.19/sq ftPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: General Office. Per 1,000 sf.
- Fire Rescue Impact Fee (Palm Beach County, Office)$0.07/sq ftHaverhill served by PBC Fire Rescue. Schedule row: General Office. Per 1,000 sf, eff 1/1/2026.
- Law Enforcement Impact Fee (Palm Beach County, Office)$0.01/sq ftHaverhill served by PBSO. Schedule row: General Office. Per 1,000 sf, eff 1/1/2026.
- Parks/Library/School Impact Fees (Palm Beach County, Office)$0.00PBC Parks, Library and School impact fees have no nonresidential rows (residential-only). $0 confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Haverhill
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Haverhill, Florida?
A new single-family home in Haverhill pays $18,637.22 per unit in combined impact fees (rates sourced July 17, 2026).
How much are commercial impact fees in Haverhill?
Commercial development in Haverhill pays $8.62 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $446,696.50 for a 50,000 sq ft building.
Does Haverhill charge its own impact fees?
No. Haverhill does not levy its own municipal impact fees. New development in Haverhill pays Palm Beach County impact fees, shown on this page.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Palm Beach County impact fees page.