Haverhill, Florida Impact Fees

Haverhill does not levy its own municipal impact fees. New development in Haverhill pays Palm Beach County impact fees, shown below: $18,637.22 per single-family unit (rates sourced July 17, 2026).

Haverhill impact fees by project type

Haverhill: Single-Family Impact Fees

A new single-family home in Haverhill pays $18,637.22 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are School Impact Fee (SFR, 2,000-3,599 sq ft) ($7,905.90), Road Impact Fee (SFR Detached) ($5,597.40) and Water Connection (Capacity) Fee (PBC Water Utilities Dept) ($2,720.00).

View the full fee schedule
Water$2,720.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept)
    Palm Beach County Water Utilities Department
    CONFIRMED 7/14/2026 audit (was $0 with no provider and no URL). Haverhill is served by the PBCWUD central potable water system — stated in the Town's 2009 Comprehensive Plan Element 6 (Table 6.6-1) and corroborated by PBCWUD's 2024 Water Quality Report, which names 'the Town of Haverhill' in its eastern service area. PBCWUD UPAP Ch.6 §6.3.2 (Oct 2025, FY2026): SFR 5/8"x3/4" water connection fee = $2,720. (A few individual private wells remain.)
    $2,720.00
Sewer$0.00
  • Sewer Connection Fee (Town of Haverhill - septic)
    PBC Water Utilities Dept (likely)
    CONFIRMED $0 (7/14/2026 audit). This is a FINDING, not a gap: Haverhill has no central sanitary sewer. The Town's Comprehensive Plan Element 6, Policy 2.1 states that individual septic tanks (OSTDS) serve the town and that 'it is unnecessary to consider a plan for the provision of a sanitary sewer system to the unserved areas.' Central wastewater exists only where PBCWUD lines already run; if a parcel connects to PBCWUD sewer, the fee is $1,980 SFR (UPAP Ch.6 §6.3.2).
    $0.00
City$0.00
  • Municipal Impact Fees (Town of Haverhill)
    Town of Haverhill
    CONFIRMED $0 (7/14/2026 audit; previously an unsourced placeholder). The Town's full Municode chapter list contains no impact-fee chapter and no utilities chapter. Only PBC county impact fees apply.
    $0.00
County$15,917.22

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$20,617.22Atlantis$15,341.31Includes unconfirmed feesBelle Glade$4,700.00Includes unconfirmed feesBoca Raton$28,250.38Boynton Beach$19,078.24Includes unconfirmed feesBriny Breezes$14,709.90Includes unconfirmed feesCloud Lake$15,917.22Includes unconfirmed feesDelray Beach$16,689.38Glen Ridge$18,637.22Includes unconfirmed feesGolf$15,228.47Includes unconfirmed feesGreenacres$19,683.11Includes unconfirmed feesGulf Stream$15,372.47Includes unconfirmed fees
Haverhill$18,637.22this page
Highland Beach$14,842.47Includes unconfirmed feesHypoluxo$21,091.31Includes unconfirmed feesJuno Beach$18,231.22Includes unconfirmed feesJupiter$19,376.57Includes unconfirmed feesJupiter Inlet Colony$19,508.36Includes unconfirmed feesLake Clarke Shores$15,734.61Includes unconfirmed feesLake Park$17,973.66Includes unconfirmed feesLake Worth Beach$21,013.54Includes unconfirmed feesLantana$14,710.68Includes unconfirmed feesLoxahatchee Groves$15,917.22Includes unconfirmed feesManalapan$14,842.47Includes unconfirmed feesMangonia Park$15,175.81Includes unconfirmed feesNorth Palm Beach$17,580.36Includes unconfirmed feesOcean Ridge$15,137.92Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$17,101.95Includes unconfirmed feesPalm Beach Gardens$29,323.11Includes unconfirmed feesPalm Beach Shores$19,409.90Includes unconfirmed feesPalm Springs$15,273.66Includes unconfirmed feesRiviera Beach$18,257.38Includes unconfirmed feesRoyal Palm Beach$20,076.41Includes unconfirmed feesSouth Bay$4,700.00Includes unconfirmed feesSouth Palm Beach$22,780.70Includes unconfirmed feesTequesta$23,387.66Wellington$21,691.41West Palm Beach$18,937.66Includes unconfirmed feesWestlake$15,917.22Includes unconfirmed fees

Haverhill: Multifamily Impact Fees

A new multifamily unit in Haverhill pays $12,328.74 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are School Impact Fee (MF, 801-1,399 sq ft) ($6,170.25), Road Impact Fee (MF, Mid/High-Rise 4+ levels) ($2,554.55) and Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF) ($1,714.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,714.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF)
    Palm Beach County Water Utilities Department
    CONFIRMED 7/14/2026 audit (was $0 with no provider and no URL). Haverhill is on the PBCWUD central water system (Town Comp Plan Element 6, Table 6.6-1; PBCWUD 2024 CCR names the Town). PBCWUD UPAP Ch.6 §6.3.2 (Oct 2025, FY2026): Multi-Family per dwelling unit water = $1,714.
    $1,714.00
Sewer$0.00
  • Sewer Connection Fee (Town of Haverhill - septic, MF)
    PBC Water Utilities Dept (likely)
    CONFIRMED $0 (7/14/2026 audit). A FINDING, not a gap: Haverhill has no central sanitary sewer. Comp Plan Element 6, Policy 2.1 — individual septic tanks (OSTDS) serve the town and 'it is unnecessary to consider a plan for the provision of a sanitary sewer system to the unserved areas.' Where PBCWUD lines exist, MF sewer would be $1,247/unit.
    $0.00
City$0.00
County$10,614.74

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$13,575.74Atlantis$10,250.90Includes unconfirmed feesBelle Glade$2,961.00Includes unconfirmed feesBoca Raton$22,255.54Boynton Beach$12,529.62Includes unconfirmed feesBriny Breezes$9,711.70Includes unconfirmed feesCloud Lake$10,614.74Includes unconfirmed feesDelray Beach$11,764.54Glen Ridge$12,328.74Includes unconfirmed feesGolf$10,114.09Includes unconfirmed feesGreenacres$12,889.36Includes unconfirmed feesGulf Stream$10,370.67Includes unconfirmed fees
Haverhill$12,328.74this page
Highland Beach$9,840.67Includes unconfirmed feesHypoluxo$14,000.90Includes unconfirmed feesJuno Beach$12,504.32Includes unconfirmed feesJupiter$14,263.63Includes unconfirmed feesJupiter Inlet Colony$14,447.66Includes unconfirmed feesLake Clarke Shores$10,515.00Includes unconfirmed feesLake Park$12,300.12Includes unconfirmed feesLake Worth Beach$13,847.44Includes unconfirmed feesLantana$9,656.64Includes unconfirmed feesLoxahatchee Groves$10,614.74Includes unconfirmed feesManalapan$9,840.67Includes unconfirmed feesMangonia Park$10,109.57Includes unconfirmed feesNorth Palm Beach$12,036.02Includes unconfirmed feesOcean Ridge$10,077.22Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$9,475.15Includes unconfirmed feesPalm Beach Gardens$22,374.16Includes unconfirmed feesPalm Beach Shores$12,672.70Includes unconfirmed feesPalm Springs$10,137.12Includes unconfirmed feesRiviera Beach$13,332.54Includes unconfirmed feesRoyal Palm Beach$13,153.46Includes unconfirmed feesSouth Bay$2,961.00Includes unconfirmed feesSouth Palm Beach$15,042.96Includes unconfirmed feesTequesta$14,298.80Includes unconfirmed feesWellington$15,578.46West Palm Beach$9,691.81Includes unconfirmed feesWestlake$10,614.74Includes unconfirmed fees

Haverhill: Commercial Impact Fees

Commercial development in Haverhill pays $8.62 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $446,696.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$15,776.00 one-time
Sewer$0.00
City$0.00
County$8.62/sq ft
Total (Haverhill): $8.62/sq ft + $15,776.00 one-time (≈ $446,696.50 at 50,000 sq ft)
Sources last checked July 17, 2026
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed fees
Haverhill$446,696.50this page
Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed feesJuno Beach$429,535.00Includes unconfirmed feesJupiter$430,331.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed feesTequesta$422,161.35Includes unconfirmed feesWellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Haverhill: Industrial Impact Fees

Industrial development in Haverhill pays $2.40 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to about $135,716.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$15,776.00 one-time
Sewer$0.00
City$0.00
County$2.40/sq ft
Total (Haverhill): $2.40/sq ft + $15,776.00 one-time (≈ $135,716.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed fees
Haverhill$135,716.00this page
Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed feesJuno Beach$122,115.00Includes unconfirmed feesJupiter$122,911.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed feesTequesta$117,211.35Includes unconfirmed feesWellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Haverhill: Office Impact Fees

Office development in Haverhill pays $5.14 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to about $144,351.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the full fee schedule
Water$15,776.00 one-time
Sewer$0.00
City$0.00
County$5.14/sq ft
Total (Haverhill): $5.14/sq ft + $15,776.00 one-time (≈ $144,351.50 at 25,000 sq ft)
Sources last checked July 17, 2026
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed fees
Haverhill$144,351.50this page
Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed feesJuno Beach$130,902.50Includes unconfirmed feesJupiter$131,698.85Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed feesTequesta$129,917.60Includes unconfirmed feesWellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Estimate your project in Haverhill

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Haverhill, Florida?

A new single-family home in Haverhill pays $18,637.22 per unit in combined impact fees (rates sourced July 17, 2026).

How much are commercial impact fees in Haverhill?

Commercial development in Haverhill pays $8.62 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $446,696.50 for a 50,000 sq ft building.

Does Haverhill charge its own impact fees?

No. Haverhill does not levy its own municipal impact fees. New development in Haverhill pays Palm Beach County impact fees, shown on this page.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.