IMPACTFEES.ORG

Juno Beach, Florida Impact Fees

Juno Beach applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $18,231.22 per unit (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Juno Beach impact fees by project type

Juno Beach: Single-Family Impact Fees

A new single-family home in Juno Beach pays at least $18,231.22 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $15,531.22 and municipal or utility fees for $2,700.00.

The largest line items are School Impact Fee (Palm Beach County) ($7,905.90), Road / Fair Share Impact Fee (Palm Beach County) ($5,597.40) and Water System Connection Charge (Seacoast Utility Authority) ($1,500.00).

Municipal Impact Fee (Town of Juno Beach) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,500.00
Sewer$1,200.00
City$0.00
County$15,531.22
Total (Juno Beach): $18,231.22
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$20,617.22Atlantis$15,341.31Includes unconfirmed feesBelle Glade$4,700.00Includes unconfirmed feesBoca Raton$28,250.38Boynton Beach$19,078.24Includes unconfirmed feesBriny Breezes$14,709.90Includes unconfirmed feesCloud Lake$15,917.22Includes unconfirmed feesDelray Beach$16,689.38Glen Ridge$18,637.22Includes unconfirmed feesGolf$15,228.47Includes unconfirmed feesGreenacres$19,683.11Includes unconfirmed feesGulf Stream$15,372.47Includes unconfirmed feesHaverhill$18,637.22Highland Beach$14,842.47Includes unconfirmed feesHypoluxo$21,091.31Includes unconfirmed fees
Juno Beach$18,231.22this pageIncludes unconfirmed fees
Jupiter$19,376.57Includes unconfirmed feesJupiter Inlet Colony$19,508.36Includes unconfirmed feesLake Clarke Shores$15,734.61Includes unconfirmed feesLake Park$17,973.66Includes unconfirmed feesLake Worth Beach$21,013.54Includes unconfirmed feesLantana$14,710.68Includes unconfirmed feesLoxahatchee Groves$15,917.22Includes unconfirmed feesManalapan$14,842.47Includes unconfirmed feesMangonia Park$15,175.81Includes unconfirmed feesNorth Palm Beach$17,580.36Includes unconfirmed feesOcean Ridge$15,137.92Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$17,101.95Includes unconfirmed feesPalm Beach Gardens$29,323.11Includes unconfirmed feesPalm Beach Shores$19,409.90Includes unconfirmed feesPalm Springs$15,273.66Includes unconfirmed feesRiviera Beach$18,257.38Includes unconfirmed feesRoyal Palm Beach$20,076.41Includes unconfirmed feesSouth Bay$4,700.00Includes unconfirmed feesSouth Palm Beach$22,780.70Includes unconfirmed feesTequesta$23,387.66Wellington$21,691.41West Palm Beach$18,937.66Includes unconfirmed feesWestlake$15,917.22Includes unconfirmed fees

Juno Beach: Multifamily Impact Fees

A new multifamily unit in Juno Beach pays at least $12,504.32 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $10,341.32 and municipal or utility fees for $2,163.00.

The largest line items are School Impact Fee (Palm Beach County, MF) ($6,170.25), Road / Fair Share Impact Fee (Palm Beach County, MF Mid/High-Rise) ($2,554.55) and Sewer System Connection Charge (Seacoast Utility Authority, MF) ($1,092.00).

Municipal Impact Fee (Town of Juno Beach, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$1,071.00
Sewer$1,092.00
City$0.00
County$10,341.32
Total (Juno Beach): $12,504.32
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$13,575.74Atlantis$10,250.90Includes unconfirmed feesBelle Glade$2,961.00Includes unconfirmed feesBoca Raton$22,255.54Boynton Beach$12,529.62Includes unconfirmed feesBriny Breezes$9,711.70Includes unconfirmed feesCloud Lake$10,614.74Includes unconfirmed feesDelray Beach$11,764.54Glen Ridge$12,328.74Includes unconfirmed feesGolf$10,114.09Includes unconfirmed feesGreenacres$12,889.36Includes unconfirmed feesGulf Stream$10,370.67Includes unconfirmed feesHaverhill$12,328.74Highland Beach$9,840.67Includes unconfirmed feesHypoluxo$14,000.90Includes unconfirmed fees
Juno Beach$12,504.32this pageIncludes unconfirmed fees
Jupiter$14,263.63Includes unconfirmed feesJupiter Inlet Colony$14,447.66Includes unconfirmed feesLake Clarke Shores$10,515.00Includes unconfirmed feesLake Park$12,300.12Includes unconfirmed feesLake Worth Beach$13,847.44Includes unconfirmed feesLantana$9,656.64Includes unconfirmed feesLoxahatchee Groves$10,614.74Includes unconfirmed feesManalapan$9,840.67Includes unconfirmed feesMangonia Park$10,109.57Includes unconfirmed feesNorth Palm Beach$12,036.02Includes unconfirmed feesOcean Ridge$10,077.22Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$9,475.15Includes unconfirmed feesPalm Beach Gardens$22,374.16Includes unconfirmed feesPalm Beach Shores$12,672.70Includes unconfirmed feesPalm Springs$10,137.12Includes unconfirmed feesRiviera Beach$13,332.54Includes unconfirmed feesRoyal Palm Beach$13,153.46Includes unconfirmed feesSouth Bay$2,961.00Includes unconfirmed feesSouth Palm Beach$15,042.96Includes unconfirmed feesTequesta$14,298.80Includes unconfirmed feesWellington$15,578.46West Palm Beach$9,691.81Includes unconfirmed feesWestlake$10,614.74Includes unconfirmed fees

Juno Beach: Commercial Impact Fees

Commercial development in Juno Beach pays $8.54 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $429,535.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft).

City Impact Fees (Town of Juno Beach, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC)
    SUA Exhibit A-1, eff 7/1/2026. Nonres (Commercial/Industrial/Institutional) System Connection Charge is FLOW-based, not meter-based: $2,700 water+sewer / $1,200 sewer-only per 275 gal average-day of peak month (= 1 ERC), per Exhibit B of the Uniform Extension Policy. Water portion = $2,700 - $1,200 = $1,500 per 275 gpd. 1-ERC minimum entered; actual = (peak-month avg gpd / 275) x $1,500. Same base as SFR 5/8".
    $1,500.00 one-time
Sewer$1,200.00 one-time
City$0.00
County$8.54/sq ft
Total (Juno Beach): $8.54/sq ft + $2,700.00 one-time (≈ $429,535.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed fees
Juno Beach$429,535.00this pageIncludes unconfirmed fees
Jupiter$430,331.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed feesTequesta$422,161.35Includes unconfirmed feesWellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Juno Beach: Industrial Impact Fees

Industrial development in Juno Beach pays $2.39 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $122,115.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft).

City Impact Fees (Town of Juno Beach, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC)
    SUA Exhibit A-1, eff 7/1/2026. Nonres (Commercial/Industrial/Institutional) System Connection Charge is FLOW-based, not meter-based: $2,700 water+sewer / $1,200 sewer-only per 275 gal average-day of peak month (= 1 ERC), per Exhibit B of the Uniform Extension Policy. Water portion = $2,700 - $1,200 = $1,500 per 275 gpd. 1-ERC minimum entered; actual = (peak-month avg gpd / 275) x $1,500. Same base as SFR 5/8".
    $1,500.00 one-time
Sewer$1,200.00 one-time
City$0.00
County$2.39/sq ft
Total (Juno Beach): $2.39/sq ft + $2,700.00 one-time (≈ $122,115.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed fees
Juno Beach$122,115.00this pageIncludes unconfirmed fees
Jupiter$122,911.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed feesTequesta$117,211.35Includes unconfirmed feesWellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Juno Beach: Office Impact Fees

Office development in Juno Beach pays $5.13 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $130,902.50. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft).

City Impact Fees (Town of Juno Beach, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the full fee schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority) — per 275 gpd (1 ERC)
    SUA Exhibit A-1, eff 7/1/2026. Nonres (Commercial/Industrial/Institutional) System Connection Charge is FLOW-based, not meter-based: $2,700 water+sewer / $1,200 sewer-only per 275 gal average-day of peak month (= 1 ERC), per Exhibit B of the Uniform Extension Policy. Water portion = $2,700 - $1,200 = $1,500 per 275 gpd. 1-ERC minimum entered; actual = (peak-month avg gpd / 275) x $1,500. Same base as SFR 5/8".
    $1,500.00 one-time
Sewer$1,200.00 one-time
City$0.00
County$5.13/sq ft
Total (Juno Beach): $5.13/sq ft + $2,700.00 one-time (≈ $130,902.50 at 25,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed fees
Juno Beach$130,902.50this pageIncludes unconfirmed fees
Jupiter$131,698.85Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed feesTequesta$129,917.60Includes unconfirmed feesWellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Estimate your project in Juno Beach

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Juno Beach, Florida?

A new single-family home in Juno Beach pays at least $18,231.22 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Juno Beach?

Commercial development in Juno Beach pays $8.54 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees, at least $429,535.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

Does Juno Beach charge its own impact fees?

Yes. Juno Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Juno Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000