Jupiter Inlet Colony impact fees by project type
Jupiter Inlet Colony: Single-Family Impact Fees
A new single-family home in Jupiter Inlet Colony pays at least $19,508.36 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $15,137.92 and municipal or utility fees for $4,370.44.
The largest line items are School Impact Fee (Palm Beach County) ($7,905.90), Road / Fair Share Impact Fee (Palm Beach County) ($5,597.40) and Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) — 2 toilets = 1.25 EC × $3,496.35/EC ($4,370.44).
Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)Requires confirmationTown of Jupiter UtilitiesINFERRED_0 (re-checked 8/4/2026; unchanged). Town of Jupiter Utilities' connection fee basis is codified (Code Ch.20 Art.II, Ord. 42-08): plant capacity fee + off-site line fee per ERC (1 ERC = 350 gpd), MF unit = 71.42% of an SFR ERC (Sec.20-20), ENR-indexed annually (Sec.20-34), +4% admin. The DOLLAR schedule remains deliberately unpublished — jupiter.fl.us/275/Schedule-of-Fees still says to request it via Utilities@jupiter.fl.us or (561) 741-2300 opt. 2 (confirmed 8/4/2026). CALL/EMAIL for current per-ERC amounts. Jupiter Inlet Colony is served by Town of Jupiter Utilities; the same schedule applies.
- Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) — 2 toilets = 1.25 EC × $3,496.35/EC$4,370.44Loxahatchee River Environmental Control District (ENCON)CONFIRMED 7/14/2026 audit (was $0). LRD Residential Connection Fees, eff. 4/1/2026. Per Equivalent Connection, EC set by toilet count: 1 = 1.00 EC $3,496.35; 2 = 1.25 EC $4,370.44; 3 = 1.50 EC $5,244.53. Canonical 3BR/2BA SFR = 2 toilets.
- Municipal Impact Fee (Town of Jupiter Inlet Colony)$0.00Town of Jupiter Inlet Colony8/4/2026: DOCUMENTED $0 — The Town of Jupiter Inlet Colony levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Jupiter Inlet Colony (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/JupiterInletColony.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
- School Impact Fee (Palm Beach County)$7,905.90Palm Beach County School DistrictPBC schedule for Jupiter Inlet Colony, eff 1/1/2026. Schools by unit sq ft; rep 2,000-3,599 sf.
- Road / Fair Share Impact Fee (Palm Beach County)$5,597.40Palm Beach CountyPBC Fair Share Road, eff 1/1/2026. Single Family Detached per unit.
- Parks & Recreation Impact Fee (Palm Beach County)$1,021.87Palm Beach CountyPBC schedule for Jupiter Inlet Colony, eff 1/1/2026. Parks; rep SFR 2,000-3,599 sf.
- Public Buildings Impact Fee (Palm Beach County)$317.30Palm Beach CountyPBC schedule for Jupiter Inlet Colony, eff 1/1/2026. Public Buildings; rep 2,000-3,599 sf.
- Library Impact Fee (Palm Beach County)$295.45Palm Beach CountyPBC schedule for Jupiter Inlet Colony, eff 1/1/2026. Libraries; rep 2,000-3,599 sf.
- Fire Rescue Impact Fee (Palm Beach County)$0.00Palm Beach CountyPBC 2026 schedule shows $0 Fire Rescue for Jupiter Inlet Colony. Documented $0.
- Law Enforcement Impact Fee (Palm Beach County)$0.00Palm Beach CountyPBC 2026 schedule shows $0 Law Enforcement for Jupiter Inlet Colony (own police). Documented $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jupiter Inlet Colony: Multifamily Impact Fees
A new multifamily unit in Jupiter Inlet Colony pays at least $14,447.66 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $10,077.22 and municipal or utility fees for $4,370.44.
The largest line items are School Impact Fee (Palm Beach County, MF) ($6,170.25), Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON, MF) — 2 toilets = 1.25 EC × $3,496.35/EC ($4,370.44) and Road / Fair Share Impact Fee (Palm Beach County, MF Mid/High-Rise) ($2,554.55).
Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities, MF)Requires confirmationTown of Jupiter UtilitiesINFERRED_0 (re-checked 8/4/2026; unchanged). Town of Jupiter Utilities' connection fee basis is codified (Code Ch.20 Art.II, Ord. 42-08): plant capacity fee + off-site line fee per ERC (1 ERC = 350 gpd), MF unit = 71.42% of an SFR ERC (Sec.20-20), ENR-indexed annually (Sec.20-34), +4% admin. The DOLLAR schedule remains deliberately unpublished — jupiter.fl.us/275/Schedule-of-Fees still says to request it via Utilities@jupiter.fl.us or (561) 741-2300 opt. 2 (confirmed 8/4/2026). CALL/EMAIL for current per-ERC amounts. Jupiter Inlet Colony is served by Town of Jupiter Utilities; the same schedule applies. MF = 0.7142 x the SFR ERC rate once obtained.
- Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON, MF) — 2 toilets = 1.25 EC × $3,496.35/EC$4,370.44Loxahatchee River Environmental Control District (ENCON)PER-UNIT APPLICATION RESOLVED 8/3/2026 (LRD family — same evidence as the Jupiter/Tequesta MF siblings; Jupiter Inlet Colony is in LRD's service area). Schedule eff. 4/1/2026: 2 toilets = 1.25 EC = $4,370.44/unit; Rule 31-10.001(23) includes 'each separate living unit of… apartments' and Rule 31-10.002 computes EC per residential unit by toilet count.
- Municipal Impact Fee (Town of Jupiter Inlet Colony, MF)$0.00Town of Jupiter Inlet Colony8/4/2026: DOCUMENTED $0 — The Town of Jupiter Inlet Colony levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Jupiter Inlet Colony (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/JupiterInletColony.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
- School Impact Fee (Palm Beach County, MF)$6,170.25Palm Beach County School DistrictPBC schedule Jupiter Inlet Colony, eff 1/1/2026. Schools (MF); rep 801-1,399 sf.
- Road / Fair Share Impact Fee (Palm Beach County, MF Mid/High-Rise)$2,554.55Multi-Family Mid/High-Rise 4+ levelsPalm Beach CountyPBC Fair Share Road, eff 1/1/2026. MF Mid/High-Rise 4+ per unit (default).
- Parks & Recreation Impact Fee (Palm Beach County, MF)$872.67Palm Beach CountyPBC schedule Jupiter Inlet Colony, eff 1/1/2026. Parks (MF); rep 801-1,399 sf.
- Public Buildings Impact Fee (Palm Beach County, MF)$243.20Palm Beach CountyPBC schedule Jupiter Inlet Colony, eff 1/1/2026. Public Buildings (MF); rep 801-1,399 sf.
- Library Impact Fee (Palm Beach County, MF)$236.55Palm Beach CountyPBC schedule Jupiter Inlet Colony, eff 1/1/2026. Libraries (MF); rep 801-1,399 sf.
- Fire Rescue Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPBC 2026 schedule shows $0 Fire Rescue for Jupiter Inlet Colony. Documented $0.
- Law Enforcement Impact Fee (Palm Beach County, MF)$0.00Palm Beach CountyPBC 2026 schedule shows $0 Law Enforcement for Jupiter Inlet Colony (own police). Documented $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jupiter Inlet Colony: Commercial Impact Fees
Commercial development in Jupiter Inlet Colony pays $8.54 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $430,331.35. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).
Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)Requires confirmationJupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
- Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)$3,496.35 one-timeLRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
- City Impact Fees (Town of Jupiter Inlet Colony, Commercial)Requires confirmationNo separate municipal nonres impact fee found; tiny residential town relies on PBC overlays. $0 placeholder — VERIFY with Town (561) 746-3787.
- Road (Fair Share) Impact Fee (Palm Beach County, Commercial)$7.91/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Commercial Retail 40,000-150,000 sq.ft.
- Public Buildings Impact Fee (Palm Beach County, Commercial)$0.47/sq ftPBC Public Buildings, eff 1/1/2026. Row: Retail 40,000-150,000 sq.ft.
- Fire Rescue Impact Fee (Palm Beach County, Commercial)$0.16/sq ftPBC 2026 JIC schedule: Fire Rescue nonzero only on Retail rows (Retail 40,000-150,000 = $163.40/1,000 sf); Office and Industrial Fire = $0. Row: Retail 40,000-150,000 sq.ft.
- Parks/Library/School Impact Fees (Palm Beach County, Commercial)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
- Law Enforcement Impact Fee (Palm Beach County, Commercial)$0.00PBC 2026 schedule shows $0 Law Enforcement for Jupiter Inlet Colony (Town has own police). Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jupiter Inlet Colony: Industrial Impact Fees
Industrial development in Jupiter Inlet Colony pays $2.27 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $117,211.35. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).
Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)Requires confirmationJupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
- Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)$3,496.35 one-timeLRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
- City Impact Fees (Town of Jupiter Inlet Colony, Industrial)Requires confirmationNo separate municipal nonres impact fee found; tiny residential town relies on PBC overlays. $0 placeholder — VERIFY with Town (561) 746-3787.
- Road (Fair Share) Impact Fee (Palm Beach County, Industrial)$2.17/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Industrial.
- Public Buildings Impact Fee (Palm Beach County, Industrial)$0.10/sq ftPBC Public Buildings, eff 1/1/2026. Row: General Industrial.
- Parks/Library/School Impact Fees (Palm Beach County, Industrial)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
- Fire Rescue Impact Fee (Palm Beach County, Industrial)$0.00PBC 2026 JIC schedule shows $0 Fire Rescue for General Industrial. Confirmed $0.
- Law Enforcement Impact Fee (Palm Beach County, Industrial)$0.00PBC 2026 schedule shows $0 Law Enforcement for Jupiter Inlet Colony (Town has own police). Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Jupiter Inlet Colony: Office Impact Fees
Office development in Jupiter Inlet Colony pays $5.06 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $129,917.60. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).
Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)Requires confirmationJupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
- Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)$3,496.35 one-timeLRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
- City Impact Fees (Town of Jupiter Inlet Colony, Office)Requires confirmationNo separate municipal nonres impact fee found; tiny residential town relies on PBC overlays. $0 placeholder — VERIFY with Town (561) 746-3787.
- Road (Fair Share) Impact Fee (Palm Beach County, Office)$4.87/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Office.
- Public Buildings Impact Fee (Palm Beach County, Office)$0.19/sq ftPBC Public Buildings, eff 1/1/2026. Row: General Office.
- Law Enforcement Impact Fee (Palm Beach County, Office)$0.00PBC 2026 schedule shows $0 Law Enforcement for Jupiter Inlet Colony (Town has own police). Confirmed $0.
- Parks/Library/School Impact Fees (Palm Beach County, Office)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
- Fire Rescue Impact Fee (Palm Beach County, Office)$0.00PBC 2026 JIC schedule shows $0 Fire Rescue for General Office. Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Jupiter Inlet Colony
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Jupiter Inlet Colony, Florida?
A new single-family home in Jupiter Inlet Colony pays at least $19,508.36 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Jupiter Inlet Colony?
Commercial development in Jupiter Inlet Colony pays $8.54 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees, at least $430,331.35 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Jupiter Inlet Colony charge its own impact fees?
Yes. Jupiter Inlet Colony levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Jupiter Inlet Colony, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Palm Beach County impact fees page.