Jupiter Inlet Colony, Florida Impact Fees

Jupiter Inlet Colony applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $19,508.36 per unit (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Jupiter Inlet Colony impact fees by project type

Jupiter Inlet Colony: Single-Family Impact Fees

A new single-family home in Jupiter Inlet Colony pays at least $19,508.36 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $15,137.92 and municipal or utility fees for $4,370.44.

The largest line items are School Impact Fee (Palm Beach County) ($7,905.90), Road / Fair Share Impact Fee (Palm Beach County) ($5,597.40) and Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) — 2 toilets = 1.25 EC × $3,496.35/EC ($4,370.44).

Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)
    Town of Jupiter Utilities
    INFERRED_0 (re-checked 8/4/2026; unchanged). Town of Jupiter Utilities' connection fee basis is codified (Code Ch.20 Art.II, Ord. 42-08): plant capacity fee + off-site line fee per ERC (1 ERC = 350 gpd), MF unit = 71.42% of an SFR ERC (Sec.20-20), ENR-indexed annually (Sec.20-34), +4% admin. The DOLLAR schedule remains deliberately unpublished — jupiter.fl.us/275/Schedule-of-Fees still says to request it via Utilities@jupiter.fl.us or (561) 741-2300 opt. 2 (confirmed 8/4/2026). CALL/EMAIL for current per-ERC amounts. Jupiter Inlet Colony is served by Town of Jupiter Utilities; the same schedule applies.
    Requires confirmation
Sewer$4,370.44
City$0.00
  • Municipal Impact Fee (Town of Jupiter Inlet Colony)
    Town of Jupiter Inlet Colony
    8/4/2026: DOCUMENTED $0 — The Town of Jupiter Inlet Colony levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Jupiter Inlet Colony (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/JupiterInletColony.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
    $0.00
County$15,137.92
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jupiter Inlet Colony: Multifamily Impact Fees

A new multifamily unit in Jupiter Inlet Colony pays at least $14,447.66 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $10,077.22 and municipal or utility fees for $4,370.44.

The largest line items are School Impact Fee (Palm Beach County, MF) ($6,170.25), Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON, MF) — 2 toilets = 1.25 EC × $3,496.35/EC ($4,370.44) and Road / Fair Share Impact Fee (Palm Beach County, MF Mid/High-Rise) ($2,554.55).

Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities, MF)
    Town of Jupiter Utilities
    INFERRED_0 (re-checked 8/4/2026; unchanged). Town of Jupiter Utilities' connection fee basis is codified (Code Ch.20 Art.II, Ord. 42-08): plant capacity fee + off-site line fee per ERC (1 ERC = 350 gpd), MF unit = 71.42% of an SFR ERC (Sec.20-20), ENR-indexed annually (Sec.20-34), +4% admin. The DOLLAR schedule remains deliberately unpublished — jupiter.fl.us/275/Schedule-of-Fees still says to request it via Utilities@jupiter.fl.us or (561) 741-2300 opt. 2 (confirmed 8/4/2026). CALL/EMAIL for current per-ERC amounts. Jupiter Inlet Colony is served by Town of Jupiter Utilities; the same schedule applies. MF = 0.7142 x the SFR ERC rate once obtained.
    Requires confirmation
Sewer$4,370.44
City$0.00
  • Municipal Impact Fee (Town of Jupiter Inlet Colony, MF)
    Town of Jupiter Inlet Colony
    8/4/2026: DOCUMENTED $0 — The Town of Jupiter Inlet Colony levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Jupiter Inlet Colony (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/JupiterInletColony.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
    $0.00
County$10,077.22
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Jupiter Inlet Colony: Commercial Impact Fees

Commercial development in Jupiter Inlet Colony pays $8.54 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $430,331.35. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).

Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)
    Jupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
    Requires confirmation
Sewer$3,496.35 one-time
  • Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)
    LRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
    $3,496.35 one-time
City$0.00
County$8.54/sq ft
Total (Jupiter Inlet Colony): $8.54/sq ft + $3,496.35 one-time (≈ $430,331.35 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed feesJuno Beach$429,535.00Includes unconfirmed feesJupiter$430,331.35Includes unconfirmed fees
Jupiter Inlet Colony$430,331.35this pageIncludes unconfirmed fees
Lake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed feesTequesta$422,161.35Includes unconfirmed feesWellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Jupiter Inlet Colony: Industrial Impact Fees

Industrial development in Jupiter Inlet Colony pays $2.27 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $117,211.35. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)
    Jupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
    Requires confirmation
Sewer$3,496.35 one-time
  • Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)
    LRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
    $3,496.35 one-time
City$0.00
County$2.27/sq ft
Total (Jupiter Inlet Colony): $2.27/sq ft + $3,496.35 one-time (≈ $117,211.35 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed feesJuno Beach$122,115.00Includes unconfirmed feesJupiter$122,911.35Includes unconfirmed fees
Jupiter Inlet Colony$117,211.35this pageIncludes unconfirmed fees
Lake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed feesTequesta$117,211.35Includes unconfirmed feesWellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Jupiter Inlet Colony: Office Impact Fees

Office development in Jupiter Inlet Colony pays $5.06 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $129,917.60. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON) ($3,496.35 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).

Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities) is set by the utility and not published online. City Impact Fees (Town of Jupiter Inlet Colony, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection (Plant Capacity + Line) Fee (Town of Jupiter Utilities)
    Jupiter Inlet Colony is served by Town of Jupiter Utilities for water. Connection fee = plant capacity + off-site line fee per ERC (1 ERC = 350 gpd; nonres ERC by fixture/flow), ENR-indexed, +4% admin (Ord. 42-08). DOLLAR SCHEDULE unpublished ('on file with town clerk'). $0 placeholder — CALL Jupiter Utilities (561) 741-2300 opt. 2.
    Requires confirmation
Sewer$3,496.35 one-time
  • Wastewater Connection (Capacity) Charge (Loxahatchee River District / ENCON)
    LRD/ENCON is sole sewer provider. Connection charge per Equivalent Connection (EC); per-EC build-up eff. 4/1/2026 = $2,006.00 plant + $1,302.00 line + 9.39% admin = $3,496.35 new construction (1.00 EC minimum). Nonres EC count by fixtures/flow per Rule 31-10. Canonical = 1.00 EC minimum. Source: LRD Rule 31-10 eff. 4/1/2026.
    $3,496.35 one-time
City$0.00
County$5.06/sq ft
Total (Jupiter Inlet Colony): $5.06/sq ft + $3,496.35 one-time (≈ $129,917.60 at 25,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed feesJuno Beach$130,902.50Includes unconfirmed feesJupiter$131,698.85Includes unconfirmed fees
Jupiter Inlet Colony$129,917.60this pageIncludes unconfirmed fees
Lake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed feesTequesta$129,917.60Includes unconfirmed feesWellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Estimate your project in Jupiter Inlet Colony

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Jupiter Inlet Colony, Florida?

A new single-family home in Jupiter Inlet Colony pays at least $19,508.36 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Jupiter Inlet Colony?

Commercial development in Jupiter Inlet Colony pays $8.54 per square foot in impact fees, plus $3,496.35 in one-time water and sewer connection fees, at least $430,331.35 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Jupiter Inlet Colony charge its own impact fees?

Yes. Jupiter Inlet Colony levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Jupiter Inlet Colony, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.