North Palm Beach, Florida Impact Fees

North Palm Beach applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $21,822.19 per unit (rates sourced ). The full breakdown is below.

North Palm Beach Impact Fees by Project Type

North Palm Beach: Single-Family Impact Fees

A new single-family home in North Palm Beach pays $21,822.19 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $14,880.36 and municipal or utility fees for $6,941.83.

The largest line items are School Impact Fee (School District of Palm Beach County) ($7,905.90), Road Impact Fee (Palm Beach County Fair Share) ($5,597.40) and Water System Connection Charge (Seacoast Utility Authority) ($1,500.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full North Palm Beach Impact Fee Schedule
Water$1,500.00
  • Water System Connection Charge (Seacoast Utility Authority)
    5/8" meter
    Seacoast Utility Authority
    Water service is provided by Seacoast Utility Authority. One-time system connection charge for a single-family home on a 5/8" meter, under the rates and fees schedule revised October 1, 2026.
    $1,500.00
Sewer$1,200.00
  • Sewer System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority
    Sewer service is provided by Seacoast Utility Authority. One-time system connection charge for a single-family home, the same for every meter size, under the rates and fees schedule revised October 1, 2026.
    $1,200.00
City$4,241.83
County$14,880.36
Total (North Palm Beach): $21,822.19

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

North Palm Beach: Multifamily Impact Fees

A new multifamily unit in North Palm Beach pays $15,021.11 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $9,873.02 and municipal or utility fees for $5,148.09.

The largest line items are School Impact Fee (School District of Palm Beach County, MF) ($6,170.25), Road Impact Fee (Palm Beach County Fair Share, MF) ($2,554.55) and Park & Recreation Impact Fee (Village of North Palm Beach, MF) ($1,094.78).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full North Palm Beach Impact Fee Schedule
Water$1,071.00
Sewer$1,092.00
City$2,985.09
County$9,873.02
Total (North Palm Beach): $15,021.11

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

North Palm Beach: Commercial Impact Fees

Commercial development in North Palm Beach pays $10.47 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $526,444.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft).

View the Full North Palm Beach Impact Fee Schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); the water portion is $1,500 of the $2,700 combined water and sewer charge per ERC. The 1-ERC minimum is shown.
    $1,500.00 one-time
Sewer$1,200.00 one-time
  • Sewer System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); sewer only is $1,200 per ERC. The 1-ERC minimum is shown.
    $1,200.00 one-time
City$2.10/sq ft
County$8.37/sq ft
Total (North Palm Beach): $10.47/sq ft + $2,700.00 one-time (≈ $526,444.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Village of North Palm Beach

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96Glen Ridge$448,196.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed feesHighland Beach$418,665.00Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$437,368.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed fees
North Palm Beach$526,444.00this page
Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$495,425.00Includes unconfirmed feesPalm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed feesRoyal Palm Beach$609,395.00Includes unconfirmed feesSouth Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

North Palm Beach: Industrial Impact Fees

Industrial development in North Palm Beach pays $4.14 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $209,893.50. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft).

View the Full North Palm Beach Impact Fee Schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); the water portion is $1,500 of the $2,700 combined water and sewer charge per ERC. The 1-ERC minimum is shown.
    $1,500.00 one-time
Sewer$1,200.00 one-time
  • Sewer System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); sewer only is $1,200 per ERC. The 1-ERC minimum is shown.
    $1,200.00 one-time
City$1.87/sq ft
County$2.27/sq ft
Total (North Palm Beach): $4.14/sq ft + $2,700.00 one-time (≈ $209,893.50 at 50,000 sq ft)
Sources last checked Official fee schedule:Village of North Palm Beach

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96Glen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed feesHighland Beach$113,715.00Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$129,948.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed fees
North Palm Beach$209,893.50this page
Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$190,475.00Includes unconfirmed feesPalm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed feesRoyal Palm Beach$177,125.00South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

North Palm Beach: Office Impact Fees

Office development in North Palm Beach pays $7.25 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $184,051.00. The calculator below adjusts to your exact square footage.

The largest line items are Water System Connection Charge (Seacoast Utility Authority) ($1,500.00 one-time), Sewer System Connection Charge (Seacoast Utility Authority) ($1,200.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft).

View the Full North Palm Beach Impact Fee Schedule
Water$1,500.00 one-time
  • Water System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); the water portion is $1,500 of the $2,700 combined water and sewer charge per ERC. The 1-ERC minimum is shown.
    $1,500.00 one-time
Sewer$1,200.00 one-time
  • Sewer System Connection Charge (Seacoast Utility Authority)
    Seacoast Utility Authority nonresidential system connection charge, rates and fees schedule revised October 1, 2026. Flow-based: charged per 275 gallons of average daily peak-month flow (1 ERC); sewer only is $1,200 per ERC. The 1-ERC minimum is shown.
    $1,200.00 one-time
City$2.20/sq ft
County$5.06/sq ft
Total (North Palm Beach): $7.25/sq ft + $2,700.00 one-time (≈ $184,051.00 at 25,000 sq ft)
Sources last checked Official fee schedule:Village of North Palm Beach

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21Glen Ridge$145,851.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed feesHighland Beach$126,421.25Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$138,735.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed fees
North Palm Beach$184,051.00this page
Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$178,431.25Includes unconfirmed feesPalm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed feesRoyal Palm Beach$174,658.50South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

North Palm Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

North Palm Beach Impact Fee FAQs

What are the total impact fees for a single-family home in North Palm Beach, Florida?

A new single-family home in North Palm Beach pays $21,822.19 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in North Palm Beach?

Commercial development in North Palm Beach pays $10.47 per square foot in impact fees, plus $2,700.00 in one-time water and sewer connection fees, about $526,444.00 for a 50,000 sq ft building.

Does North Palm Beach charge its own impact fees?

Yes. North Palm Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in North Palm Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.