Skip to content
IMPACTFEES.ORG

Glen Ridge, Florida Impact Fees

Glen Ridge applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $20,137.22 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Glen Ridge Impact Fees by Project Type

Glen Ridge: Single-Family Impact Fees

A new single-family home in Glen Ridge pays at least $20,137.22 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $18,637.22 and municipal or utility fees for $1,500.00.

The largest line items are School Impact Fee (SFR, 2,000-3,599 sq ft) ($7,905.90), Road Impact Fee (SFR Detached) ($5,597.40) and Water Connection (Capacity) Fee (PBC Water Utilities Dept) ($2,720.00).

Recreation and Open Space Impact Fee (Town of Glen Ridge) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Town of Glen Ridge) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Glen Ridge Impact Fee Schedule
Water$2,720.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept)
    Palm Beach County Water Utilities Department
    Water service is provided by the Palm Beach County Water Utilities Department. This is the one-time capacity/connection charge for a single-family home on a standard 5/8"×3/4" meter (PBCWUD Uniform Policies & Procedures Ch. 6; FY2026 rates effective October 2025).
    $2,720.00
Sewer$0.00
  • Sewer Connection Fee (Town of Glen Ridge)
    Town of Glen Ridge
    Water service is Palm Beach County Water Utilities, but no public record identifies the town's wastewater provider; some parcels may be on septic.
    Requires confirmation
City$1,500.00
  • Recreation and Open Space Impact Fee (Town of Glen Ridge)
    Town of Glen Ridge
    The Town of Glen Ridge charges a one-time impact fee for recreational facilities and open space when a developer of vacant property secures a building permit or site plan approval, in addition to Palm Beach County impact fees.
    $1,500.00Requires confirmation
County$15,917.22
  • School Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County / School District of PBC
    Palm Beach County public-school impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026. Applies countywide.
    $7,905.90
  • Road Impact Fee (SFR Detached)
    Palm Beach County
    Palm Beach County "Fair Share" road impact fee, single-family detached. Effective January 1, 2026. The County publishes a separate schedule for each municipality and updates them annually on January 1.
    $5,597.40
  • Parks Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County parks impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026.
    $1,225.26
  • Fire/Rescue Impact Fee (SFR)
    Palm Beach County
    Palm Beach County fire-rescue impact fee, single-family home. Effective January 1, 2026. Glen Ridge is served by Palm Beach County Fire Rescue.
    $393.30
  • Public Buildings Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County public buildings impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026.
    $317.30
  • Library Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County library impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026. Glen Ridge lies within the County library service district.
    $295.45
  • Law Enforcement Impact Fee (SFR)
    Palm Beach County
    Palm Beach County law-enforcement (patrol) impact fee, single-family home. Effective January 1, 2026. Glen Ridge is patrolled by the Palm Beach County Sheriff's Office.
    $182.61
Total (Glen Ridge): $20,137.22
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Glen Ridge: Multifamily Impact Fees

A new multifamily unit in Glen Ridge pays at least $13,828.74 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $12,328.74 and municipal or utility fees for $1,500.00.

The largest line items are School Impact Fee (MF, 801-1,399 sq ft) ($6,170.25), Road Impact Fee (MF, Mid/High-Rise 4+ levels) ($2,554.55) and Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF) ($1,714.00).

Recreation and Open Space Impact Fee (Town of Glen Ridge, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Town of Glen Ridge, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Glen Ridge Impact Fee Schedule
Water$1,714.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF)
    Palm Beach County Water Utilities Department
    Water service is provided by the Palm Beach County Water Utilities Department. This is the one-time capacity/connection charge per multifamily dwelling unit (0.63 ERC per unit, all meter sizes; PBCWUD Uniform Policies & Procedures Ch. 6; FY2026 rates effective October 2025).
    $1,714.00
Sewer$0.00
  • Sewer Connection Fee (Town of Glen Ridge, MF)
    Town of Glen Ridge
    Water service is Palm Beach County Water Utilities, but no public record identifies the town's wastewater provider; some parcels may be on septic.
    Requires confirmation
City$1,500.00
  • Recreation and Open Space Impact Fee (Town of Glen Ridge, MF)
    Town of Glen Ridge
    The Town of Glen Ridge charges a one-time impact fee for recreational facilities and open space when a developer of vacant property secures a building permit or site plan approval. The fee is charged per development, not per unit, so a multifamily project pays it once.
    $1,500.00Requires confirmation
County$10,614.74
  • School Impact Fee (MF, 801-1,399 sq ft)
    Palm Beach County / School District of PBC
    Palm Beach County public-school impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026. Applies countywide.
    $6,170.25
  • Road Impact Fee (MF, Mid/High-Rise 4+ levels)
    Palm Beach County
    Palm Beach County "Fair Share" road impact fee, multifamily in a building of 4+ stories. Effective January 1, 2026. Low-rise multifamily (1–3 stories) pays a different per-unit rate; see that tier.
    $2,554.55
  • Parks Impact Fee (MF, 801-1,399 sq ft)
    Palm Beach County
    Palm Beach County parks impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026.
    $1,046.35
  • Fire/Rescue Impact Fee (MF)
    Palm Beach County
    Palm Beach County fire-rescue impact fee, multifamily. Effective January 1, 2026. Glen Ridge is served by Palm Beach County Fire Rescue.
    $264.10
  • Public Buildings Impact Fee (MF, 801-1,399 sq ft)
    Palm Beach County
    Palm Beach County public buildings impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026.
    $243.20
  • Library Impact Fee (MF, 801-1,399 sq ft)
    Palm Beach County
    Palm Beach County library impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026. Glen Ridge lies within the County library service district.
    $236.55
  • Law Enforcement Impact Fee (MF)
    Palm Beach County
    Palm Beach County law-enforcement (patrol) impact fee, multifamily. Effective January 1, 2026. Glen Ridge is patrolled by the Palm Beach County Sheriff's Office.
    $99.74
Total (Glen Ridge): $13,828.74
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Glen Ridge: Commercial Impact Fees

Commercial development in Glen Ridge pays $8.62 per square foot in impact fees, plus $17,276.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $448,196.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Recreation and Open Space Impact Fee (Town of Glen Ridge, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Glen Ridge Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    Palm Beach County Water Utilities Dept
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed)
    Town of Glen Ridge (sewer provider unconfirmed)
    Water service in Glen Ridge is provided by the Palm Beach County Water Utilities Department, but no public record identifies the town's wastewater provider, and some parcels may be on septic. The Town code has no utilities chapter.
    Requires confirmation
City$1,500.00 one-time
  • Recreation and Open Space Impact Fee (Town of Glen Ridge, Commercial)
    Town of Glen Ridge
    The Town of Glen Ridge charges a one-time $1,500 impact fee for recreational facilities and open space when a developer of vacant property secures a building permit or site plan approval, in addition to Palm Beach County impact fees. The fee is charged per development.
    $1,500.00 one-timeRequires confirmation
County$8.62/sq ft
Total (Glen Ridge): $8.62/sq ft + $17,276.00 one-time (≈ $448,196.50 at 50,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96
Glen Ridge$448,196.50this pageIncludes unconfirmed fees
Golf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed feesHighland Beach$418,665.00Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$437,368.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed feesNorth Palm Beach$526,444.00Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$495,425.00Includes unconfirmed feesPalm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed feesRoyal Palm Beach$609,395.00Includes unconfirmed feesSouth Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Glen Ridge: Industrial Impact Fees

Industrial development in Glen Ridge pays $2.40 per square foot in impact fees, plus $15,776.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to at least $135,716.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Glen Ridge Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    Palm Beach County Water Utilities Dept
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed)
    Town of Glen Ridge (sewer provider unconfirmed)
    Water service in Glen Ridge is provided by the Palm Beach County Water Utilities Department, but no public record identifies the town's wastewater provider, and some parcels may be on septic. The Town code has no utilities chapter.
    Requires confirmation
City$0.00
County$2.40/sq ft
Total (Glen Ridge): $2.40/sq ft + $15,776.00 one-time (≈ $135,716.00 at 50,000 sq ft)
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96
Glen Ridge$135,716.00this pageIncludes unconfirmed fees
Golf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed feesHighland Beach$113,715.00Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$129,948.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed feesNorth Palm Beach$209,893.50Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$190,475.00Includes unconfirmed feesPalm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed feesRoyal Palm Beach$177,125.00South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Glen Ridge: Office Impact Fees

Office development in Glen Ridge pays $5.14 per square foot in impact fees, plus $17,276.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to at least $145,851.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Recreation and Open Space Impact Fee (Town of Glen Ridge, Office) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

View the Full Glen Ridge Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    Palm Beach County Water Utilities Dept
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$0.00
  • Sewer Connection Fee (Town of Glen Ridge — sewer provider unconfirmed)
    Town of Glen Ridge (sewer provider unconfirmed)
    Water service in Glen Ridge is provided by the Palm Beach County Water Utilities Department, but no public record identifies the town's wastewater provider, and some parcels may be on septic. The Town code has no utilities chapter.
    Requires confirmation
City$1,500.00 one-time
  • Recreation and Open Space Impact Fee (Town of Glen Ridge, Office)
    Town of Glen Ridge
    The Town of Glen Ridge charges a one-time $1,500 impact fee for recreational facilities and open space when a developer of vacant property secures a building permit or site plan approval, in addition to Palm Beach County impact fees. The fee is charged per development.
    $1,500.00 one-timeRequires confirmation
County$5.14/sq ft
Total (Glen Ridge): $5.14/sq ft + $17,276.00 one-time (≈ $145,851.50 at 25,000 sq ft)
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21
Glen Ridge$145,851.50this pageIncludes unconfirmed fees
Golf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed feesHighland Beach$126,421.25Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$138,735.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed feesNorth Palm Beach$184,051.00Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$178,431.25Includes unconfirmed feesPalm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed feesRoyal Palm Beach$174,658.50South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Glen Ridge Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Glen Ridge Impact Fee FAQs

What are the total impact fees for a single-family home in Glen Ridge, Florida?

A new single-family home in Glen Ridge pays at least $20,137.22 per unit in combined impact fees (rates sourced October 27, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Glen Ridge?

Commercial development in Glen Ridge pays $8.62 per square foot in impact fees, plus $17,276.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $448,196.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

Does Glen Ridge charge its own impact fees?

Yes. Glen Ridge levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Glen Ridge, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000