Gulf Stream impact fees by project type
Gulf Stream: Single-Family Impact Fees
A new single-family home in Gulf Stream pays at least $15,372.47 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $14,842.47 and municipal or utility fees for $530.00.
The largest line items are School Impact Fee (SFR, 2,000-3,599 sq ft) ($7,905.90), Road Impact Fee (SFR Detached) ($5,597.40) and Parks Impact Fee (SFR, 2,000-3,599 sq ft) ($1,021.87).
Sewer Connection Fee (Town of Gulf Stream) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water System Capital Connection Charge (Town of Gulf Stream)$530.00Town of Gulf Stream (bulk water from City of Delray Beach)CONFIRMED 7/14/2026 audit (was $0 with no source). Gulf Stream DOES levy a water capital connection charge: Code §34-34 = $530 per single-family or multifamily unit (up to $13,250 for a 4-inch meter). The Town owns and bills its distribution system but buys all treated water in bulk from the City of Delray Beach Utilities (§34-32(b)(2); confirmed again in the Town's 2025 Water Quality Report). Not a 'no utility' town.
- Sewer Connection Fee (Town of Gulf Stream)Requires confirmationCity of Delray Beach (likely)UNCONFIRMED (re-searched 7/14/2026). Gulf Stream runs NO sewer utility — Code Ch.34 has a water article but no sewer article, and the town website has zero sewer content. Most homes are on private septic/grinder systems; sewered portions discharge into the City of Delray Beach system → South Central Regional WWTP. Whether a Delray connection charge is passed through to a Gulf Stream permit is unresolved. CALL Town Hall (561) 276-5116 or Delray Beach Utilities (561) 243-7318.
- Municipal Impact Fees (Town of Gulf Stream)$0.00Town of Gulf StreamCONFIRMED $0 (7/14/2026 audit). Gulf Stream levies no parks, fire, police or transportation impact fee. NOTE: it DOES levy a water system capital connection charge (§34-34, $530/unit) — captured on the Water record, not here.
- School Impact Fee (SFR, 2,000-3,599 sq ft)$7,905.90Palm Beach County / School District of PBCPBC School impact fee, 2,000-3,599 sf. Eff 1/1/2026.
- Road Impact Fee (SFR Detached)$5,597.40Palm Beach CountyPBC Fair Share Road impact fee, SF Detached. Eff 1/1/2026.
- Parks Impact Fee (SFR, 2,000-3,599 sq ft)$1,021.87Palm Beach CountyPBC Parks impact fee, Town of Gulf Stream schedule, 2,000-3,599 sf. Eff 1/1/2026.
- Public Buildings Impact Fee (SFR, 2,000-3,599 sq ft)$317.30Palm Beach CountyPBC Public Buildings impact fee, 2,000-3,599 sf. Eff 1/1/2026.
- Library Impact Fee (SFR)$0.00Palm Beach CountyPBC 2026 Gulf Stream schedule shows $0 Library. Documents that we checked.
- Fire/Rescue Impact Fee (SFR)$0.00Palm Beach CountyPBC Fire Rescue impact fee = $0 for Gulf Stream per 2026 schedule (fire via Delray Beach contract).
- Law Enforcement Impact Fee (SFR)$0.00Palm Beach CountyPBC Law Enforcement impact fee = $0 for Gulf Stream — town operates own police dept. Per PBC 2026 schedule.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Gulf Stream: Multifamily Impact Fees
A new multifamily unit in Gulf Stream pays at least $10,370.67 per unit in impact fees (rates sourced July 17, 2026). Of that, Palm Beach County-levied fees account for $9,840.67 and municipal or utility fees for $530.00.
The largest line items are School Impact Fee (MF, 801-1,399 sq ft) ($6,170.25), Road Impact Fee (MF, Mid/High-Rise 4+ levels) ($2,554.55) and Parks Impact Fee (MF, 801-1,399 sq ft) ($872.67).
Sewer Connection Fee (Town of Gulf Stream, MF) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water System Capital Connection Charge (Town of Gulf Stream, MF)$530.00Town of Gulf Stream (bulk water from City of Delray Beach)CONFIRMED 7/14/2026 audit (was $0 with no source). Gulf Stream Code §34-34 sets the water capital connection charge at $530 per unit and names MULTIFAMILY explicitly alongside single-family — so MF = SFR by the ordinance's own words. The Town buys bulk treated water from City of Delray Beach Utilities (§34-32(b)(2)).
- Sewer Connection Fee (Town of Gulf Stream, MF)Requires confirmationCity of Delray Beach (likely)UNCONFIRMED (re-searched 7/14/2026). Gulf Stream runs no sewer utility (Code Ch.34 has no sewer article); most properties are on septic/grinder systems, sewered portions discharge to City of Delray Beach → South Central Regional WWTP. CALL Town Hall (561) 276-5116 or Delray Beach Utilities (561) 243-7318.
- Municipal Impact Fees (Town of Gulf Stream, MF)$0.00Town of Gulf StreamCONFIRMED $0 (7/14/2026 audit). No parks/fire/police/transportation impact fee. The Town's $530/unit water capital connection charge (§34-34) is captured on the Water record.
- School Impact Fee (MF, 801-1,399 sq ft)$6,170.25Palm Beach County / School District of PBCPBC School impact fee, 801-1,399 sf. Eff 1/1/2026.
- Road Impact Fee (MF, Mid/High-Rise 4+ levels)$2,554.55Palm Beach CountyPBC Fair Share Road, MF Mid/High-Rise (>4 levels). Eff 1/1/2026. Default MF tier.
- Parks Impact Fee (MF, 801-1,399 sq ft)$872.67Palm Beach CountyPBC Parks impact fee, Town of Gulf Stream schedule, 801-1,399 sf. Eff 1/1/2026.
- Public Buildings Impact Fee (MF, 801-1,399 sq ft)$243.20Palm Beach CountyPBC Public Buildings impact fee, 801-1,399 sf. Eff 1/1/2026.
- Fire/Rescue Impact Fee (MF)$0.00Palm Beach CountyPBC Fire Rescue = $0 for Gulf Stream per 2026 schedule (fire via Delray Beach contract).
- Law Enforcement Impact Fee (MF)$0.00Palm Beach CountyPBC Law Enforcement = $0 for Gulf Stream — own police dept. Per PBC 2026 schedule.
- Library Impact Fee (MF)$0.00Palm Beach CountyPBC 2026 Gulf Stream schedule shows $0 Library. Documents that we checked.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Gulf Stream: Commercial Impact Fees
Commercial development in Gulf Stream pays $8.37 per square foot in impact fees, plus $1,325.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $419,990.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter ($1,325.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter$1,325.00 one-timeTown of Gulf StreamCode §34-34(c), Ord. 94-3. 1" meter = ERF 2.5. Canonical default. Bulk water from Delray.
- Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility)Requires confirmationTown of Gulf Stream (no sewer utility)UNCONFIRMED. Town runs NO sewer utility — Ch.34 has a water article but no sewer article. Most premises on private septic/grinder; sewered portions discharge to City of Delray Beach → South Central Regional WWTP. Whether a Delray connection charge passes through to a Gulf Stream permit is unresolved. Call Town Hall (561) 276-5116 or Delray Beach Utilities (561) 243-7318.
- City Impact Fees (Town of Gulf Stream, Commercial)$0.00Town of Gulf StreamCONFIRMED $0. Town levies no parks/fire/police/transportation impact fee. (It DOES levy a water system capital connection charge §34-34 — captured on the Water records.)
- Road (Fair Share) Impact Fee (Palm Beach County, Commercial)$7.91/sq ftPalm Beach CountyPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: Retail 40,000-150,000 sf. Per 1,000 sf.
- Public Buildings Impact Fee (Palm Beach County, Commercial)$0.47/sq ftPalm Beach CountyPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: Retail 40,000-150,000 sf. Per 1,000 sf.
- Parks/Library/School Impact Fees (Palm Beach County, Commercial)$0.00Palm Beach CountyPBC Parks, Library and School impact fees have no nonresidential rows (residential-only); Gulf Stream also outside county library district. $0 confirmed.
- Law Enforcement Impact Fee (Palm Beach County, Commercial)$0.00Palm Beach County$0 for Gulf Stream — town operates own police dept, per PBC 2026 schedule. Confirmed.
- Fire Rescue Impact Fee (Palm Beach County, Commercial)$0.00Palm Beach County$0 for Gulf Stream per 2026 county schedule (fire via Delray Beach contract, not PBC Fire Rescue impact-fee district). Confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Gulf Stream: Industrial Impact Fees
Industrial development in Gulf Stream pays $2.27 per square foot in impact fees, plus $1,325.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 50,000 sq ft building, that comes to at least $115,040.00. The calculator below adjusts to your exact square footage.
The largest line items are Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter ($1,325.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter$1,325.00 one-timeTown of Gulf StreamCode §34-34(c), Ord. 94-3. 1" meter = ERF 2.5. Canonical default. Bulk water from Delray.
- Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility)Requires confirmationTown of Gulf Stream (no sewer utility)UNCONFIRMED. Town runs NO sewer utility — Ch.34 has a water article but no sewer article. Most premises on private septic/grinder; sewered portions discharge to City of Delray Beach → South Central Regional WWTP. Whether a Delray connection charge passes through to a Gulf Stream permit is unresolved. Call Town Hall (561) 276-5116 or Delray Beach Utilities (561) 243-7318.
- City Impact Fees (Town of Gulf Stream, Industrial)$0.00Town of Gulf StreamCONFIRMED $0. No municipal impact fee.
- Road (Fair Share) Impact Fee (Palm Beach County, Industrial)$2.17/sq ftPalm Beach CountyPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: General Industrial. Per 1,000 sf.
- Public Buildings Impact Fee (Palm Beach County, Industrial)$0.10/sq ftPalm Beach CountyPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: General Industrial. Per 1,000 sf.
- Fire Rescue Impact Fee (Palm Beach County, Industrial)$0.00Palm Beach County$0 for Gulf Stream per 2026 county schedule. Confirmed.
- Law Enforcement Impact Fee (Palm Beach County, Industrial)$0.00Palm Beach County$0 for Gulf Stream — own police dept. Confirmed.
- Parks/Library/School Impact Fees (Palm Beach County, Industrial)$0.00Palm Beach CountyPBC Parks, Library and School impact fees have no nonresidential rows (residential-only). $0 confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Gulf Stream: Office Impact Fees
Office development in Gulf Stream pays $5.06 per square foot in impact fees, plus $1,325.00 in one-time water and sewer connection fees (rates sourced July 17, 2026).
For a 25,000 sq ft building, that comes to at least $127,746.25. The calculator below adjusts to your exact square footage.
The largest line items are Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter ($1,325.00 one-time), Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the full fee schedule
- Water System Capital Connection Charge (Town of Gulf Stream) — 1" meter$1,325.00 one-timeTown of Gulf StreamCode §34-34(c), Ord. 94-3. 1" meter = ERF 2.5. Canonical default. Bulk water from Delray.
- Sewer Connection Fee (Town of Gulf Stream — no municipal sewer utility)Requires confirmationTown of Gulf Stream (no sewer utility)UNCONFIRMED. Town runs NO sewer utility — Ch.34 has a water article but no sewer article. Most premises on private septic/grinder; sewered portions discharge to City of Delray Beach → South Central Regional WWTP. Whether a Delray connection charge passes through to a Gulf Stream permit is unresolved. Call Town Hall (561) 276-5116 or Delray Beach Utilities (561) 243-7318.
- City Impact Fees (Town of Gulf Stream, Office)$0.00Town of Gulf StreamCONFIRMED $0. No municipal impact fee (water capital connection charge on Water records).
- Road (Fair Share) Impact Fee (Palm Beach County, Office)$4.87/sq ftPalm Beach CountyPBC Fair Share Road impact fee, countywide, eff 1/1/2026. Schedule row: General Office. Per 1,000 sf.
- Public Buildings Impact Fee (Palm Beach County, Office)$0.19/sq ftPalm Beach CountyPBC Public Buildings impact fee, countywide, eff 1/1/2026. Schedule row: General Office. Per 1,000 sf.
- Law Enforcement Impact Fee (Palm Beach County, Office)$0.00Palm Beach County$0 for Gulf Stream — own police dept. Confirmed.
- Parks/Library/School Impact Fees (Palm Beach County, Office)$0.00Palm Beach CountyPBC Parks, Library and School impact fees have no nonresidential rows (residential-only). $0 confirmed.
- Fire Rescue Impact Fee (Palm Beach County, Office)$0.00Palm Beach County$0 for Gulf Stream per 2026 county schedule (fire via Delray contract). Confirmed.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Gulf Stream
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Gulf Stream, Florida?
A new single-family home in Gulf Stream pays at least $15,372.47 per unit in combined impact fees (rates sourced July 17, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Gulf Stream?
Commercial development in Gulf Stream pays $8.37 per square foot in impact fees, plus $1,325.00 in one-time water and sewer connection fees (assuming a 1-inch meter), at least $419,990.00 for a 50,000 sq ft building. One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Gulf Stream charge its own impact fees?
Yes. Gulf Stream levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Gulf Stream, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Palm Beach County impact fees page.