Lantana, Florida Impact Fees

Lantana applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $18,221.68 per unit (rates sourced ). The full breakdown is below.

Lantana Impact Fees by Project Type

Lantana: Single-Family Impact Fees

A new single-family home in Lantana pays $18,221.68 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $14,710.68 and municipal or utility fees for $3,511.00.

The largest line items are County School Impact Fee (Town of Lantana) ($7,905.90), County Road/Fair Share Impact Fee (Town of Lantana) ($5,597.40) and Wastewater Plant Capacity Charge (Town of Lantana) ($2,000.00).

View the Full Lantana Impact Fee Schedule
Water$1,511.00
  • Water Plant Capacity Charge (Town of Lantana)
    Town of Lantana
    The Town of Lantana charges a water plant capacity charge of $1,511 per equivalent residential unit for new connections, under its rates and fees schedule effective October 1, 2025. A standard single-family home equals one unit. Meter installation and a small application charge are billed separately, and rates adjust each October with inflation.
    $1,511.00
Sewer$2,000.00
  • Wastewater Plant Capacity Charge (Town of Lantana)
    Town of Lantana
    The Town of Lantana charges a wastewater plant capacity charge of $2,000 per equivalent residential unit for new connections, plus the town's cost of purchasing regional treatment capacity from Lake Worth Beach, under its rates and fees schedule effective October 1, 2025. Rates adjust each October with inflation.
    $2,000.00
City$0.00
  • Municipal Impact Fee (Town of Lantana)
    Town of Lantana
    The Town of Lantana does not charge municipal impact fees of its own; only Palm Beach County's countywide impact fees apply to new construction in the Lantana (per the county's 2026 impact fee schedule).
    $0.00
County$14,710.68
Total (Lantana): $18,221.68

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lantana: Multifamily Impact Fees

A new multifamily unit in Lantana pays $12,114.34 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $9,656.64 and municipal or utility fees for $2,457.70.

The largest line items are County School Impact Fee (Town of Lantana) (MF) ($6,170.25), County Road/Fair Share Impact Fee (Town of Lantana) (MF) ($2,554.55) and Wastewater Plant Capacity Charge (Town of Lantana) (MF, per ERU) ($1,400.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Lantana Impact Fee Schedule
Water$1,057.70
  • Water Plant Capacity Charge (Town of Lantana) (MF, per ERU)
    Town of Lantana
    The Town of Lantana charges a water connection fee of $1,511 per equivalent residential unit. The town's code counts a multifamily unit on a 5/8-inch or 3/4-inch meter as 0.70 of an equivalent residential unit, so the charge is $1,057.70 per apartment unit.
    $1,057.70
Sewer$1,400.00
  • Wastewater Plant Capacity Charge (Town of Lantana) (MF, per ERU)
    Town of Lantana
    The Town of Lantana charges a sewer connection fee of $2,000 per equivalent residential unit. The town's code counts a multifamily unit on a 5/8-inch or 3/4-inch meter as 0.70 of an equivalent residential unit, so the charge is $1,400 per apartment unit. The town also passes through the cost of purchasing capacity from Lake Worth, so the total can be higher.
    $1,400.00
City$0.00
  • Municipal Impact Fee (Town of Lantana) (MF)
    Town of Lantana
    The Town of Lantana does not charge municipal impact fees of its own; only Palm Beach County's countywide impact fees apply to new construction in the Lantana (per the county's 2026 impact fee schedule).
    $0.00
County$9,656.64
Total (Lantana): $12,114.34

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lantana: Commercial Impact Fees

Commercial development in Lantana pays $8.54 per square foot in impact fees, plus $10,533.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $437,368.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft), Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Commercial) ($0.16/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter and Water Plant Capacity Charge (Town of Lantana) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lantana Impact Fee Schedule
Water$4,533.00 one-time
  • Water Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana water plant capacity charge under Resolution R-07-2025: $1,511 per equivalent residential unit, with the number of units set by meter size in the Town code. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $4,533.00 one-timeRequires confirmation
Sewer$6,000.00 one-time
  • Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana wastewater plant capacity charge under Resolution R-07-2025: $2,000 per equivalent residential unit, with the number of units set by meter size in the Town code, plus the cost of purchasing treatment capacity from Lake Worth Beach for each new connection. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $6,000.00 one-timeRequires confirmation
City$0.00
County$8.54/sq ft
Total (Lantana): $8.54/sq ft + $10,533.00 one-time (≈ $437,368.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Lantana
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96Glen Ridge$448,196.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed feesHighland Beach$418,665.00Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed fees
Lantana$437,368.00this pageIncludes unconfirmed fees
Loxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed feesNorth Palm Beach$526,444.00Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$495,425.00Includes unconfirmed feesPalm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed feesRoyal Palm Beach$609,395.00Includes unconfirmed feesSouth Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Lantana: Industrial Impact Fees

Industrial development in Lantana pays $2.39 per square foot in impact fees, plus $10,533.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $129,948.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft), Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter and Water Plant Capacity Charge (Town of Lantana) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lantana Impact Fee Schedule
Water$4,533.00 one-time
  • Water Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana water plant capacity charge under Resolution R-07-2025: $1,511 per equivalent residential unit, with the number of units set by meter size in the Town code. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $4,533.00 one-timeRequires confirmation
Sewer$6,000.00 one-time
  • Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana wastewater plant capacity charge under Resolution R-07-2025: $2,000 per equivalent residential unit, with the number of units set by meter size in the Town code, plus the cost of purchasing treatment capacity from Lake Worth Beach for each new connection. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $6,000.00 one-timeRequires confirmation
City$0.00
County$2.39/sq ft
Total (Lantana): $2.39/sq ft + $10,533.00 one-time (≈ $129,948.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Lantana
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96Glen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed feesHighland Beach$113,715.00Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed fees
Lantana$129,948.00this pageIncludes unconfirmed fees
Loxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed feesNorth Palm Beach$209,893.50Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$190,475.00Includes unconfirmed feesPalm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed feesRoyal Palm Beach$177,125.00South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Lantana: Office Impact Fees

Office development in Lantana pays $5.13 per square foot in impact fees, plus $10,533.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $138,735.50. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft), Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Office) ($0.07/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter and Water Plant Capacity Charge (Town of Lantana) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Lantana Impact Fee Schedule
Water$4,533.00 one-time
  • Water Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana water plant capacity charge under Resolution R-07-2025: $1,511 per equivalent residential unit, with the number of units set by meter size in the Town code. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $4,533.00 one-timeRequires confirmation
Sewer$6,000.00 one-time
  • Wastewater Plant Capacity Charge (Town of Lantana) — 1" meter
    Town of Lantana
    Town of Lantana wastewater plant capacity charge under Resolution R-07-2025: $2,000 per equivalent residential unit, with the number of units set by meter size in the Town code, plus the cost of purchasing treatment capacity from Lake Worth Beach for each new connection. Amount shown for a 1 inch meter (2.5 units, rounded up to 3 under the Town code).
    $6,000.00 one-timeRequires confirmation
City$0.00
County$5.13/sq ft
Total (Lantana): $5.13/sq ft + $10,533.00 one-time (≈ $138,735.50 at 25,000 sq ft)
Sources last checked Official fee schedule:Town of Lantana
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21Glen Ridge$145,851.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed feesHighland Beach$126,421.25Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed fees
Lantana$138,735.50this pageIncludes unconfirmed fees
Loxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed feesNorth Palm Beach$184,051.00Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$178,431.25Includes unconfirmed feesPalm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed feesRoyal Palm Beach$174,658.50South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Lantana Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Lantana Impact Fee FAQs

What are the total impact fees for a single-family home in Lantana, Florida?

A new single-family home in Lantana pays $18,221.68 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in Lantana?

Commercial development in Lantana pays $8.54 per square foot in impact fees, plus $10,533.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $437,368.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Lantana charge its own impact fees?

Yes. Lantana levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lantana, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.