Cloud Lake, Florida Impact Fees

Cloud Lake applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $15,917.22 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Cloud Lake impact fees by project type

Cloud Lake: Single-Family Impact Fees

A new single-family home in Cloud Lake pays at least $15,917.22 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are School Impact Fee (SFR, 2,000-3,599 sq ft) ($7,905.90), Road Impact Fee (SFR Detached) ($5,597.40) and Parks Impact Fee (SFR, 2,000-3,599 sq ft) ($1,225.26).

Water Connection Fee (Town of Cloud Lake - provider unidentified) and Sewer Connection Fee (Town of Cloud Lake - provider unidentified) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Cloud Lake impact fee schedule
Water$0.00
Sewer$0.00
City$0.00
County$15,917.22
  • School Impact Fee (SFR, 2,000-3,599 sq ft)
    School District of Palm Beach County
    Palm Beach County public-school impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026. Applies countywide.
    $7,905.90
  • Road Impact Fee (SFR Detached)
    Palm Beach County
    Palm Beach County "Fair Share" road impact fee, single-family detached. Effective January 1, 2026. The County publishes a separate schedule for each municipality and updates them annually on January 1.
    $5,597.40
  • Parks Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County parks impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026.
    $1,225.26
  • Fire/Rescue Impact Fee (SFR)
    Palm Beach County Fire Rescue
    Palm Beach County fire-rescue impact fee, single-family home. Effective January 1, 2026. Cloud Lake is served by Palm Beach County Fire Rescue.
    $393.30
  • Public Buildings Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County public buildings impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026.
    $317.30
  • Library Impact Fee (SFR, 2,000-3,599 sq ft)
    Palm Beach County
    Palm Beach County library impact fee, single-family home 2,000–3,599 sq ft. Effective January 1, 2026. Cloud Lake lies within the County library service district.
    $295.45
  • Law Enforcement Impact Fee (SFR)
    Palm Beach County
    Palm Beach County law-enforcement (patrol) impact fee, single-family home. Effective January 1, 2026. Cloud Lake is patrolled by the Palm Beach County Sheriff's Office.
    $182.61
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cloud Lake: Multifamily Impact Fees

A new multifamily unit in Cloud Lake pays at least $10,614.74 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are School Impact Fee (801-1,399 sq ft unit) ($6,170.25), Road Impact Fee (MF Mid/High-Rise, 4+ stories) ($2,554.55) and Parks Impact Fee (801-1,399 sq ft unit) ($1,046.35).

Sewer Connection Fee (Town of Cloud Lake - provider unidentified, MF) and Water Connection Fee (Town of Cloud Lake - provider unidentified, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full Cloud Lake impact fee schedule
Water$0.00
Sewer$0.00
City$0.00
County$10,614.74
  • School Impact Fee (801-1,399 sq ft unit)
    School District of Palm Beach County
    Palm Beach County public-school impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026. Applies countywide.
    $6,170.25
  • Road Impact Fee (MF Mid/High-Rise, 4+ stories)
    Palm Beach County
    Palm Beach County "Fair Share" road impact fee, multifamily in a building of 4+ stories. Effective January 1, 2026. Low-rise multifamily (1–3 stories) pays a different per-unit rate — see that tier.
    $2,554.55
  • Parks Impact Fee (801-1,399 sq ft unit)
    Palm Beach County
    Palm Beach County parks impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026.
    $1,046.35
  • Fire/Rescue Impact Fee (MF)
    Palm Beach County Fire Rescue
    Palm Beach County fire-rescue impact fee, multifamily. Effective January 1, 2026. Cloud Lake is served by Palm Beach County Fire Rescue.
    $264.10
  • Public Buildings Impact Fee (801-1,399 sq ft unit)
    Palm Beach County
    Palm Beach County public buildings impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026.
    $243.20
  • Library Impact Fee (801-1,399 sq ft unit)
    Palm Beach County
    Palm Beach County library impact fee, multifamily unit 801–1,399 sq ft. Effective January 1, 2026. Cloud Lake lies within the County library service district.
    $236.55
  • Law Enforcement Impact Fee (MF)
    Palm Beach County
    Palm Beach County law-enforcement (patrol) impact fee, multifamily. Effective January 1, 2026. Cloud Lake is patrolled by the Palm Beach County Sheriff's Office.
    $99.74
Total (Cloud Lake): $10,614.74
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Cloud Lake: Commercial Impact Fees

Commercial development in Cloud Lake pays $8.62 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $430,920.50. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft), Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Commercial) ($0.16/sq ft).

Sewer Connection Fee (Town of Cloud Lake — provider unidentified) and Water Connection Fee (Town of Cloud Lake — provider unidentified) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Cloud Lake impact fee schedule
Water$0.00
Sewer$0.00
City$0.00
County$8.62/sq ft
Total (Cloud Lake): $8.62/sq ft (≈ $430,920.50 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Cloud Lake (provider unidentified) Town of Cloud Lake Palm Beach County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed fees
Cloud Lake$430,920.50this pageIncludes unconfirmed fees
Delray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed feesJuno Beach$429,535.00Includes unconfirmed feesJupiter$430,331.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed feesTequesta$422,161.35Includes unconfirmed feesWellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Cloud Lake: Industrial Impact Fees

Industrial development in Cloud Lake pays $2.40 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $119,940.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft), Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

Sewer Connection Fee (Town of Cloud Lake — provider unidentified) and Water Connection Fee (Town of Cloud Lake — provider unidentified) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Cloud Lake impact fee schedule
Water$0.00
Sewer$0.00
County$2.40/sq ft
Total (Cloud Lake): $2.40/sq ft (≈ $119,940.00 at 50,000 sq ft)
Sources last checked Official fee schedules:Town of Cloud Lake (provider unidentified) Town of Cloud Lake Palm Beach County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed fees
Cloud Lake$119,940.00this pageIncludes unconfirmed fees
Delray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed feesJuno Beach$122,115.00Includes unconfirmed feesJupiter$122,911.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed feesTequesta$117,211.35Includes unconfirmed feesWellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Cloud Lake: Office Impact Fees

Office development in Cloud Lake pays $5.14 per square foot in impact fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $128,575.50. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft), Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Office) ($0.07/sq ft).

Sewer Connection Fee (Town of Cloud Lake — provider unidentified) and Water Connection Fee (Town of Cloud Lake — provider unidentified) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full Cloud Lake impact fee schedule
Water$0.00
Sewer$0.00
City$0.00
County$5.14/sq ft
Total (Cloud Lake): $5.14/sq ft (≈ $128,575.50 at 25,000 sq ft)
Sources last checked Official fee schedules:Town of Cloud Lake (provider unidentified) Town of Cloud Lake Palm Beach County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed fees
Cloud Lake$128,575.50this pageIncludes unconfirmed fees
Delray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed feesJuno Beach$130,902.50Includes unconfirmed feesJupiter$131,698.85Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed feesTequesta$129,917.60Includes unconfirmed feesWellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Cloud Lake impact fee calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Cloud Lake impact fee FAQs

What are the total impact fees for a single-family home in Cloud Lake, Florida?

A new single-family home in Cloud Lake pays at least $15,917.22 per unit in combined impact fees (rates sourced July 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Cloud Lake?

Commercial development in Cloud Lake pays $8.62 per square foot in impact fees, at least $430,920.50 for a 50,000 sq ft building. 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Cloud Lake charge its own impact fees?

Yes. Cloud Lake levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Cloud Lake, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.