Royal Palm Beach, Florida Impact Fees

Royal Palm Beach applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $24,186.41 per unit (rates sourced ). The full breakdown is below.

Royal Palm Beach Impact Fees by Project Type

Royal Palm Beach: Single-Family Impact Fees

A new single-family home in Royal Palm Beach pays $24,186.41 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $20,076.41 and municipal or utility fees for $4,110.00.

The largest line items are School Impact Fee (School District of Palm Beach County) ($7,905.90), Road Impact Fee (Palm Beach County Fair Share) ($5,597.40) and Water Connection (Capacity) Fee (PBC Water Utilities Dept) ($2,720.00).

View the Full Royal Palm Beach Impact Fee Schedule
Water$2,720.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept)
    Palm Beach County Water Utilities Department
    Water service in Royal Palm Beach is provided by the Palm Beach County Water Utilities Department; the single-family water connection (capacity) fee is set on the department's utility rate schedule.
    $2,720.00
Sewer$1,980.00
  • Sewer Connection (Capacity) Fee (PBC Water Utilities Dept)
    Palm Beach County Water Utilities Department
    Sanitary sewer service in Royal Palm Beach is provided by the Palm Beach County Water Utilities Department; the single-family wastewater connection (capacity) fee is set on the department's utility rate schedule.
    $1,980.00
City$4,110.00
County$15,376.41
Total (Royal Palm Beach): $24,186.41

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Royal Palm Beach: Multifamily Impact Fees

A new multifamily unit in Royal Palm Beach pays $16,314.46 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $13,153.46 and municipal or utility fees for $3,161.00.

The largest line items are School Impact Fee (School District of Palm Beach County, MF) ($6,170.25), Road Impact Fee (Palm Beach County Fair Share, MF) ($2,554.55) and Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF) ($1,714.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Royal Palm Beach Impact Fee Schedule
Water$1,714.00
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept, MF)
    Palm Beach County Water Utilities Department
    Water service in Royal Palm Beach is provided by the Palm Beach County Water Utilities Department; the multifamily per-dwelling-unit water connection (capacity) fee is set on the department's utility rate schedule.
    $1,714.00
Sewer$1,247.00
  • Sewer Connection (Capacity) Fee (PBC Water Utilities Dept, MF)
    Palm Beach County Water Utilities Department
    Sanitary sewer service in Royal Palm Beach is provided by the Palm Beach County Water Utilities Department; the multifamily per-dwelling-unit wastewater connection (capacity) fee is set on the department's utility rate schedule.
    $1,247.00
City$3,161.00
County$10,192.46
Total (Royal Palm Beach): $16,314.46

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Royal Palm Beach: Commercial Impact Fees

Commercial development in Royal Palm Beach pays $11.64 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $609,395.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Local Roads Impact Fee (Village of Royal Palm Beach, Commercial) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Royal Palm Beach Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$11,484.00 one-time
  • Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
    $11,484.00 one-time
City$3.11/sq ft
  • Local Roads Impact Fee (Village of Royal Palm Beach, Commercial)
    Village of Royal Palm Beach
    Village of Royal Palm Beach local roads impact fee, shown for a 50,000 sq ft general commercial retail center, per 1,000 sq ft. The Village computes the actual rate from a trip generation formula based on building size. Charged in addition to the Palm Beach County road impact fee.
    $1.82/sq ftRequires confirmation
  • Public Buildings Impact Fee (Village of Royal Palm Beach, Commercial)
    Village of Royal Palm Beach
    Village of Royal Palm Beach public buildings impact fee for retail of 150,000 sq ft or less, charged per 1,000 sq ft (Ordinance 953, effective October 5, 2017); lower rates apply above 150,000 and above 400,000 sq ft. Charged in addition to Palm Beach County impact fees.
    $1.29/sq ft
  • City Impact Fees (Village of Royal Palm Beach, Commercial)
    Village of Royal Palm Beach
    The Village of Royal Palm Beach recreational facilities impact fee applies to residential and hotel development; other nonresidential development pays $0 for it. The Village's public buildings and local roads impact fees are listed separately.
    $0.00
County$8.54/sq ft
Total (Royal Palm Beach): $11.64/sq ft + $27,260.00 one-time (≈ $609,395.00 at 50,000 sq ft)
Sources last checked Official fee schedules:PBC Water Utilities Department Village of Royal Palm Beach Palm Beach County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96Glen Ridge$448,196.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed feesHighland Beach$418,665.00Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$437,368.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed feesNorth Palm Beach$526,444.00Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$495,425.00Includes unconfirmed feesPalm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed fees
Royal Palm Beach$609,395.00this pageIncludes unconfirmed fees
South Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Royal Palm Beach: Industrial Impact Fees

Industrial development in Royal Palm Beach pays $3.00 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $177,125.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Royal Palm Beach Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$11,484.00 one-time
  • Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
    $11,484.00 one-time
City$0.61/sq ft
County$2.39/sq ft
Total (Royal Palm Beach): $3.00/sq ft + $27,260.00 one-time (≈ $177,125.00 at 50,000 sq ft)
Sources last checked Official fee schedules:PBC Water Utilities Department Village of Royal Palm Beach Palm Beach County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96Glen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed feesHighland Beach$113,715.00Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$129,948.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed feesNorth Palm Beach$209,893.50Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$190,475.00Includes unconfirmed feesPalm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed fees
Royal Palm Beach$177,125.00this page
South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Royal Palm Beach: Office Impact Fees

Office development in Royal Palm Beach pays $5.87 per square foot in impact fees, plus $27,906.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $174,658.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Local Roads Impact Fee (Village of Royal Palm Beach, Office) ($646.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Royal Palm Beach Impact Fee Schedule
Water$15,776.00 one-time
  • Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential potable water connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Meter drop and service installation fees are charged separately where the Department installs the service.
    $15,776.00 one-time
Sewer$11,484.00 one-time
  • Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter
    PBC Water Utilities Department
    Palm Beach County Water Utilities Department nonresidential wastewater connection fee for a 1 inch meter, from the Department's Uniform Policies and Procedures Manual Chapter 6 (October 2026 edition for FY2027; amounts unchanged from FY2026). Meters 4 inches and larger are priced by department analysis. Wastewater service installation is charged at cost.
    $11,484.00 one-time
City$0.74/sq ft + $646.00 one-time
  • Local Roads Impact Fee (Village of Royal Palm Beach, Office)
    Village of Royal Palm Beach
    Village of Royal Palm Beach local roads impact fee for a 25,000 sq ft general office building: $646 per 1,000 sq ft, from the Village's office trip formula (Code Sec. 10-72); the per-1,000 sq ft rate falls as buildings get larger. Palm Beach County's road impact fee also applies.
    $646.00 one-time
  • Public Buildings Impact Fee (Village of Royal Palm Beach, Office)
    Village of Royal Palm Beach
    Village of Royal Palm Beach public buildings impact fee for general office of 50,000 sq ft or less, charged per 1,000 sq ft (Ordinance 953, effective October 5, 2017); lower rates apply to larger buildings. Charged in addition to Palm Beach County impact fees.
    $0.74/sq ft
  • City Impact Fees (Village of Royal Palm Beach, Office)
    Village of Royal Palm Beach
    The Village of Royal Palm Beach recreational facilities impact fee applies to residential and hotel development; other nonresidential development pays $0 for it. The Village's public buildings and local roads impact fees are listed separately.
    $0.00
County$5.13/sq ft
Total (Royal Palm Beach): $5.87/sq ft + $27,906.00 one-time (≈ $174,658.50 at 25,000 sq ft)
Sources last checked Official fee schedules:PBC Water Utilities Department Village of Royal Palm Beach Palm Beach County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21Glen Ridge$145,851.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed feesHighland Beach$126,421.25Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$138,735.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed feesNorth Palm Beach$184,051.00Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$178,431.25Includes unconfirmed feesPalm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed fees
Royal Palm Beach$174,658.50this page
South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Royal Palm Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since a 2021 amendment (Ch. 2021-63, Laws of Florida), the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

New to impact fees? Our plain-English guide explains what they cover, who pays them, and why they exist.

Summary current as of September 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Royal Palm Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Royal Palm Beach, Florida?

A new single-family home in Royal Palm Beach pays $24,186.41 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in Royal Palm Beach?

Commercial development in Royal Palm Beach pays $11.64 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $609,395.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Royal Palm Beach charge its own impact fees?

Yes. Royal Palm Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Royal Palm Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.