Skip to content
IMPACTFEES.ORG

Highland Beach, Florida Impact Fees

Highland Beach applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $19,842.47 per unit (rates sourced ). The full breakdown is below.

Highland Beach Impact Fees by Project Type

Highland Beach: Single-Family Impact Fees

A new single-family home in Highland Beach pays $19,842.47 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $14,842.47 and municipal or utility fees for $5,000.00.

The largest line items are School Impact Fee (Palm Beach County) ($7,905.90), Road / Fair Share Impact Fee (Palm Beach County) ($5,597.40) and Water System Connection Charge (Town of Highland Beach) ($3,000.00).

View the Full Highland Beach Impact Fee Schedule
Water$3,000.00
  • Water System Connection Charge (Town of Highland Beach)
    Town of Highland Beach
    The Town of Highland Beach charges a water system connection charge of $3,000 per dwelling unit for new dwellings, set in the town's fee schedule for fiscal year 2025-2026. Meter installation is billed separately at time and materials plus 25 percent.
    $3,000.00
Sewer$1,000.00
  • Sewer System Connection Charge (Town of Highland Beach)
    Town of Highland Beach
    The Town of Highland Beach charges a sewer system connection charge of $1,000 per dwelling unit for new dwellings, set in the town's fee schedule for fiscal year 2025-2026. Physical installation costs are billed separately.
    $1,000.00
City$1,000.00
  • Open Space and Recreation In-Lieu Payment (Town of Highland Beach)
    Town of Highland Beach
    The Town of Highland Beach requires a one-time open space and recreation in-lieu payment of $1,000 per home, paid before the building permit, for a single-family home on a lot that has not been built on since the land was subdivided (Town Code Sec. 20-2). Palm Beach County's countywide impact fees also apply.
    $1,000.00
County$14,842.47
Total (Highland Beach): $19,842.47
Sources last checked Official fee schedules:Town of Highland Beach Palm Beach County School District Palm Beach County

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Highland Beach: Multifamily Impact Fees

A new multifamily unit in Highland Beach pays $14,840.67 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $9,840.67 and municipal or utility fees for $5,000.00.

The largest line items are School Impact Fee (Palm Beach County, MF) ($6,170.25), Water System Connection Charge (Town of Highland Beach, MF) ($3,000.00) and Road / Fair Share Impact Fee (Palm Beach County, MF Mid/High-Rise) ($2,554.55).

Open Space and Recreation In-Lieu Payment (Town of Highland Beach, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Highland Beach Impact Fee Schedule
Water$3,000.00
  • Water System Connection Charge (Town of Highland Beach, MF)
    Town of Highland Beach
    The Town of Highland Beach charges a water system connection charge of $3,000 per dwelling unit for new dwellings, set in the town's fee schedule for fiscal year 2025-2026. Meter installation is billed separately at time and materials plus 25 percent.
    $3,000.00
Sewer$1,000.00
  • Sewer System Connection Charge (Town of Highland Beach, MF)
    Town of Highland Beach
    The Town of Highland Beach charges a sewer system connection charge of $1,000 per dwelling unit for new dwellings, set in the town's fee schedule for fiscal year 2025-2026. Physical installation costs are billed separately.
    $1,000.00
City$1,000.00
  • Open Space and Recreation In-Lieu Payment (Town of Highland Beach, MF)
    Town of Highland Beach
    The Town of Highland Beach requires a one-time open space and recreation in-lieu payment of $1,000 per unit for a multifamily development, paid before the building permit, when the Town Commission finds that dedicating open space or recreation land is not feasible (Town Code Sec. 20-2). Palm Beach County's countywide impact fees also apply.
    $1,000.00Requires confirmation
County$9,840.67
Total (Highland Beach): $14,840.67
Sources last checked Official fee schedules:Town of Highland Beach Palm Beach County School District Palm Beach County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Highland Beach: Commercial Impact Fees

Commercial development in Highland Beach pays $8.37 per square foot in impact fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $418,665.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).

View the Full Highland Beach Impact Fee Schedule
Water$0.00
  • Water Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its water system connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay meter installation at time and material plus 25 percent.
    $0.00
Sewer$0.00
  • Sewer Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its sewer connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay the installation cost: the Town builds connections under 4 inches at project cost plus 25 percent, and owners of 4 inch and larger service lines bear the full cost.
    $0.00
City$0.00
  • City Impact Fees (Town of Highland Beach, Commercial)
    The Town of Highland Beach levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply. The Town's open space and recreation in-lieu payment applies to residential units only.
    $0.00
County$8.37/sq ft
Total (Highland Beach): $8.37/sq ft (≈ $418,665.00 at 50,000 sq ft)
Sources last checked

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96Glen Ridge$448,196.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed fees
Highland Beach$418,665.00this page
Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$437,368.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed feesNorth Palm Beach$526,444.00Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$495,425.00Includes unconfirmed feesPalm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed feesRoyal Palm Beach$609,395.00Includes unconfirmed feesSouth Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Highland Beach: Industrial Impact Fees

Industrial development in Highland Beach pays $2.27 per square foot in impact fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $113,715.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

View the Full Highland Beach Impact Fee Schedule
Water$0.00
  • Water Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its water system connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay meter installation at time and material plus 25 percent.
    $0.00
Sewer$0.00
  • Sewer Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its sewer connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay the installation cost: the Town builds connections under 4 inches at project cost plus 25 percent, and owners of 4 inch and larger service lines bear the full cost.
    $0.00
City$0.00
  • City Impact Fees (Town of Highland Beach, Industrial)
    The Town of Highland Beach levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply. The Town's open space and recreation in-lieu payment applies to residential units only.
    $0.00
County$2.27/sq ft
Total (Highland Beach): $2.27/sq ft (≈ $113,715.00 at 50,000 sq ft)
Sources last checked

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96Glen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed fees
Highland Beach$113,715.00this page
Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$129,948.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed feesNorth Palm Beach$209,893.50Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$190,475.00Includes unconfirmed feesPalm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed feesRoyal Palm Beach$177,125.00South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Highland Beach: Office Impact Fees

Office development in Highland Beach pays $5.06 per square foot in impact fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $126,421.25. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).

View the Full Highland Beach Impact Fee Schedule
Water$0.00
  • Water Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its water system connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay meter installation at time and material plus 25 percent.
    $0.00
Sewer$0.00
  • Sewer Capacity/Connection Fee (Town of Highland Beach)
    The Town of Highland Beach charges its sewer connection charge per new dwelling unit only, under the fee schedule effective October 1, 2026 (Resolution 2026-016). Nonresidential connections pay the installation cost: the Town builds connections under 4 inches at project cost plus 25 percent, and owners of 4 inch and larger service lines bear the full cost.
    $0.00
City$0.00
  • City Impact Fees (Town of Highland Beach, Office)
    The Town of Highland Beach levies no municipal impact fee on nonresidential development; Palm Beach County impact fees apply. The Town's open space and recreation in-lieu payment applies to residential units only.
    $0.00
County$5.06/sq ft
Total (Highland Beach): $5.06/sq ft (≈ $126,421.25 at 25,000 sq ft)
Sources last checked

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21Glen Ridge$145,851.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed fees
Highland Beach$126,421.25this page
Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$138,735.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed feesNorth Palm Beach$184,051.00Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$178,431.25Includes unconfirmed feesPalm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed feesRoyal Palm Beach$174,658.50South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Highland Beach Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Highland Beach Impact Fee FAQs

What are the total impact fees for a single-family home in Highland Beach, Florida?

A new single-family home in Highland Beach pays $19,842.47 per unit in combined impact fees (rates sourced October 27, 2026).

How much are commercial impact fees in Highland Beach?

Commercial development in Highland Beach pays $8.37 per square foot in impact fees, about $418,665.00 for a 50,000 sq ft building.

Does Highland Beach charge its own impact fees?

Yes. Highland Beach levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Highland Beach, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000