Skip to content
IMPACTFEES.ORG

Palm Beach Shores, Florida Impact Fees

Palm Beach Shores applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays $27,335.90 per unit (rates sourced ). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting. The full breakdown is below.

Palm Beach Shores Impact Fees by Project Type

Palm Beach Shores: Single-Family Impact Fees

A new single-family home in Palm Beach Shores pays $27,335.90 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $14,709.90 and municipal or utility fees for $12,626.00.

The largest line items are School Impact Fee (School District of Palm Beach County) ($7,905.90), Road Impact Fee (Palm Beach County Fair Share) ($5,597.40) and Parks & Recreation Impact Fee (Palm Beach County) ($593.85).

Public Facilities Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.65/sf, Sewer Capital Charge (City of Riviera Beach Utility Special District), Water Capital Charge (City of Riviera Beach Utility Special District), Fire Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.34/sf, and Parks Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.26/sf are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Palm Beach Shores Impact Fee Schedule
Water$8,222.00
  • Water Capital Charge (City of Riviera Beach Utility Special District)
    City of Riviera Beach Utility Special District
    Water service in Palm Beach Shores is provided by the City of Riviera Beach Utility Special District, and connection fees are paid to it under its own schedule (Town Code Sec. 14-83). Its water capital charge is $8,222 per equivalent residential unit, effective June 1, 2025; Riviera Beach counts each residence as one unit. An outside-city surcharge may apply.
    $8,222.00Requires confirmation
Sewer$1,904.00
  • Sewer Capital Charge (City of Riviera Beach Utility Special District)
    City of Riviera Beach Utility Special District
    Sanitary sewer service in Palm Beach Shores is provided by the City of Riviera Beach Utility Special District, and connection fees are paid to it under its own schedule (Town Code Sec. 14-83). Its wastewater capital charge is $1,904 per equivalent residential unit, effective June 1, 2025; Riviera Beach counts each residence as one unit.
    $1,904.00Requires confirmation
City$2,500.00
  • Public Facilities Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.65/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Public Facilities impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.65 per sq ft gives about $1,300 for a 2,000 sq ft home. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $1,300.00Requires confirmation
  • Fire Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.34/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Fire impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.34 per sq ft gives about $680 for a 2,000 sq ft home. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $680.00Requires confirmation
  • Parks Impact Fee (Town of Palm Beach Shores) — 2,000 sf × $0.26/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Parks impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.26 per sq ft gives about $520 for a 2,000 sq ft home. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $520.00Requires confirmation
County$14,709.90
Total (Palm Beach Shores): $27,335.90
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Beach Shores: Multifamily Impact Fees

A new multifamily unit in Palm Beach Shores pays $21,087.70 per unit in impact fees (rates sourced October 27, 2026). Of that, Palm Beach County-levied fees account for $9,711.70 and municipal or utility fees for $11,376.00.

The largest line items are School Impact Fee (School District of Palm Beach County, MF) ($6,170.25), Road Impact Fee (Palm Beach County Fair Share, MF) ($2,554.55) and Parks & Recreation Impact Fee (Palm Beach County, MF) ($507.15).

Parks Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.26/sf, Sewer Capital Charge (City of Riviera Beach Utility Special District, MF), Public Facilities Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.65/sf, Water Capital Charge (City of Riviera Beach Utility Special District, MF), and Fire Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.34/sf are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Palm Beach Shores Impact Fee Schedule
Water$8,222.00
  • Water Capital Charge (City of Riviera Beach Utility Special District, MF)
    City of Riviera Beach Utility Special District
    Water service in Palm Beach Shores is provided by the City of Riviera Beach Utility Special District, and connection fees are paid to it under its own schedule (Town Code Sec. 14-83). Its water capital charge is $8,222 per equivalent residential unit, effective June 1, 2025; Riviera Beach counts each residence as one unit, so a multifamily unit pays the full charge. An outside-city surcharge may apply.
    $8,222.00Requires confirmation
Sewer$1,904.00
  • Sewer Capital Charge (City of Riviera Beach Utility Special District, MF)
    City of Riviera Beach Utility Special District
    Sanitary sewer service in Palm Beach Shores is provided by the City of Riviera Beach Utility Special District, and connection fees are paid to it under its own schedule (Town Code Sec. 14-83). Its wastewater capital charge is $1,904 per equivalent residential unit, effective June 1, 2025; Riviera Beach counts each residence as one unit, so a multifamily unit pays the full charge.
    $1,904.00Requires confirmation
City$1,250.00
  • Public Facilities Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.65/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Public Facilities impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.65 per sq ft gives about $650 for a 1,000 sq ft unit. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $650.00Requires confirmation
  • Fire Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.34/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Fire impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.34 per sq ft gives about $340 for a 1,000 sq ft unit. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $340.00Requires confirmation
  • Parks Impact Fee (Town of Palm Beach Shores, MF) — 1,000 sf × $0.26/sf
    Town of Palm Beach Shores
    The Town of Palm Beach Shores charges a Parks impact fee per square foot of air-conditioned area, due at certificate of occupancy; the codified rate of $0.26 per sq ft gives about $260 for a 1,000 sq ft unit. The Town code adjusts the rates each year by the Consumer Price Index, effective the first Monday in October.
    $260.00Requires confirmation
County$9,711.70
Total (Palm Beach Shores): $21,087.70
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Palm Beach Shores: Commercial Impact Fees

Commercial development in Palm Beach Shores pays $9.36 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $495,425.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Facilities Impact Fee (Town of Palm Beach Shores, Commercial) and Fire Rescue Impact Fee (Town of Palm Beach Shores, Commercial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Palm Beach Shores Impact Fee Schedule
Water$15,776.00 one-time
Sewer$11,484.00 one-time
City$0.99/sq ft
  • Public Facilities Impact Fee (Town of Palm Beach Shores, Commercial)
    Town of Palm Beach Shores
    Town of Palm Beach Shores public facilities impact fee of $0.65 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.65/sq ftRequires confirmation
  • Fire Rescue Impact Fee (Town of Palm Beach Shores, Commercial)
    Town of Palm Beach Shores
    Town of Palm Beach Shores fire rescue impact fee of $0.34 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.34/sq ftRequires confirmation
County$8.37/sq ft
Total (Palm Beach Shores): $9.36/sq ft + $27,260.00 one-time (≈ $495,425.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Palm Beach Shores
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$428,028.00Boynton Beach$460,065.00Briny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$421,064.96Glen Ridge$448,196.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$585,925.00Gulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Includes unconfirmed feesHighland Beach$418,665.00Hypoluxo$429,790.00Includes unconfirmed feesJuno Beach$459,325.00Includes unconfirmed feesJupiter$535,428.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed feesLake Clarke Shores$426,835.00Includes unconfirmed feesLake Park$543,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$437,368.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Manalapan$418,665.00Includes unconfirmed feesMangonia Park$501,315.00Includes unconfirmed feesNorth Palm Beach$526,444.00Ocean Ridge$425,415.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$426,758.75Palm Beach Gardens$720,750.00Includes unconfirmed fees
Palm Beach Shores$495,425.00this pageIncludes unconfirmed fees
Palm Springs$641,143.00Includes unconfirmed feesRiviera Beach$673,869.00Includes unconfirmed feesRoyal Palm Beach$609,395.00Includes unconfirmed feesSouth Bay$27,260.00*South Palm Beach$441,313.13Includes unconfirmed feesTequesta$441,099.49Includes unconfirmed feesWellington$841,772.00West Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Palm Beach Shores: Industrial Impact Fees

Industrial development in Palm Beach Shores pays $3.26 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 50,000 sq ft building, that comes to about $190,475.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Facilities Impact Fee (Town of Palm Beach Shores, Industrial) and Fire Rescue Impact Fee (Town of Palm Beach Shores, Industrial) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Palm Beach Shores Impact Fee Schedule
Water$15,776.00 one-time
Sewer$11,484.00 one-time
City$0.99/sq ft
  • Public Facilities Impact Fee (Town of Palm Beach Shores, Industrial)
    Town of Palm Beach Shores
    Town of Palm Beach Shores public facilities impact fee of $0.65 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.65/sq ftRequires confirmation
  • Fire Rescue Impact Fee (Town of Palm Beach Shores, Industrial)
    Town of Palm Beach Shores
    Town of Palm Beach Shores fire rescue impact fee of $0.34 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.34/sq ftRequires confirmation
County$2.27/sq ft
Total (Palm Beach Shores): $3.26/sq ft + $27,260.00 one-time (≈ $190,475.00 at 50,000 sq ft)
Sources last checked Official fee schedule:Town of Palm Beach Shores
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$123,078.00Boynton Beach$123,815.00Briny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$116,114.96Glen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Includes unconfirmed feesHighland Beach$113,715.00Hypoluxo$124,840.00Includes unconfirmed feesJuno Beach$151,905.00Includes unconfirmed feesJupiter$139,077.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed feesLake Clarke Shores$119,415.00Includes unconfirmed feesLake Park$153,615.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$129,948.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Manalapan$113,715.00Includes unconfirmed feesMangonia Park$124,565.00Includes unconfirmed feesNorth Palm Beach$209,893.50Ocean Ridge$120,465.00Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$121,808.75Palm Beach Gardens$265,500.00Includes unconfirmed fees
Palm Beach Shores$190,475.00this pageIncludes unconfirmed fees
Palm Springs$222,625.00Includes unconfirmed feesRiviera Beach$165,035.00Includes unconfirmed feesRoyal Palm Beach$177,125.00South Bay$27,260.00*South Palm Beach$133,893.13Includes unconfirmed feesTequesta$136,149.49Includes unconfirmed feesWellington$199,702.00West Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Palm Beach Shores: Office Impact Fees

Office development in Palm Beach Shores pays $6.05 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (rates sourced October 27, 2026).

For a 25,000 sq ft building, that comes to about $178,431.25. The calculator below adjusts to your exact square footage.

The largest line items are Water Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($15,776.00 one-time), Sewer Connection (Capacity) Fee (PBC Water Utilities Dept) — 1" meter ($11,484.00 one-time) and Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Public Facilities Impact Fee (Town of Palm Beach Shores, Office) and Fire Rescue Impact Fee (Town of Palm Beach Shores, Office) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full Palm Beach Shores Impact Fee Schedule
Water$15,776.00 one-time
Sewer$11,484.00 one-time
City$0.99/sq ft
  • Public Facilities Impact Fee (Town of Palm Beach Shores, Office)
    Town of Palm Beach Shores
    Town of Palm Beach Shores public facilities impact fee of $0.65 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.65/sq ftRequires confirmation
  • Fire Rescue Impact Fee (Town of Palm Beach Shores, Office)
    Town of Palm Beach Shores
    Town of Palm Beach Shores fire rescue impact fee of $0.34 per square foot of non-residential floor area (all floors). The Town indexes its impact fees to CPI each year, effective the first Monday in October, so the payable amount may be higher than the codified rate shown.
    $0.34/sq ftRequires confirmation
County$5.06/sq ft
Total (Palm Beach Shores): $6.05/sq ft + $27,260.00 one-time (≈ $178,431.25 at 25,000 sq ft)
Sources last checked Official fee schedule:Town of Palm Beach Shores
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Palm Beach County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Boca Raton$135,784.25Boynton Beach$140,996.25Briny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,821.21Glen Ridge$145,851.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$223,681.25Gulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Includes unconfirmed feesHighland Beach$126,421.25Hypoluxo$137,546.25Includes unconfirmed feesJuno Beach$145,797.50Includes unconfirmed feesJupiter$156,256.35Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed feesLake Clarke Shores$128,202.50Includes unconfirmed feesLake Park$162,152.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$138,735.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Manalapan$126,421.25Includes unconfirmed feesMangonia Park$135,021.25Includes unconfirmed feesNorth Palm Beach$184,051.00Ocean Ridge$133,171.25Includes unconfirmed feesPahokee$27,260.00*Includes unconfirmed feesPalm Beach$134,515.00Palm Beach Gardens$221,475.00Includes unconfirmed fees
Palm Beach Shores$178,431.25this pageIncludes unconfirmed fees
Palm Springs$240,732.50Includes unconfirmed feesRiviera Beach$179,624.50Includes unconfirmed feesRoyal Palm Beach$174,658.50South Bay$27,260.00*South Palm Beach$142,680.63Includes unconfirmed feesTequesta$144,605.74Includes unconfirmed feesWellington$228,089.50West Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Palm Beach Shores Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Amendments since 2021 also limit how fast fees can rise: an increase of up to 25% phases in over two years and one of 25–50% over four years, no single increase may exceed 50%, and a fee can be raised no more than once every four years. Going beyond those limits requires a recent study showing extraordinary circumstances, two public workshops, and a unanimous vote of the governing body, and even then the increase is capped at 100%.

Counties and cities can both levy impact fees. Inside an incorporated city, a project usually pays the county fees that apply countywide plus any municipal fees the city has adopted; in some counties, county fees apply only in unincorporated areas. That is why totals differ between a city and the unincorporated county around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Palm Beach Shores Impact Fee FAQs

What are the total impact fees for a single-family home in Palm Beach Shores, Florida?

A new single-family home in Palm Beach Shores pays $27,335.90 per unit in combined impact fees (rates sourced October 27, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

How much are commercial impact fees in Palm Beach Shores?

Commercial development in Palm Beach Shores pays $9.36 per square foot in impact fees, plus $27,260.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $495,425.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Palm Beach Shores charge its own impact fees?

Yes. Palm Beach Shores levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Palm Beach Shores, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes caps an increase at 50%, phased in over two to four years, and allows a fee to be raised no more than once every four years. Going beyond that requires an extraordinary-circumstances study, two public workshops, and a unanimous vote of the governing body, and is still capped at 100%.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.

0/1000