Ocean Ridge impact fees by project type
Ocean Ridge: Single-Family Impact Fees
A new single-family home in Ocean Ridge pays $18,637.92 per unit in impact fees (rates sourced August 5, 2026). Of that, Palm Beach County-levied fees account for $15,137.92 and municipal or utility fees for $3,500.00.
The largest line items are School Impact Fee (School District of Palm Beach County) ($7,905.90), Road Impact Fee (Palm Beach County Fair Share) ($5,597.40) and Water Capital Facilities Fee (City of Boynton Beach) ($3,500.00).
View the full fee schedule
- Water Capital Facilities Fee (City of Boynton Beach)$3,500.00City of Boynton BeachAMOUNT CONFIRMED, SECOND COMPONENT DISCLOSED 2026-08-05. The $3,500 is exactly right: FY2026 Boynton Beach rate sheet, single-family OUTSIDE city limits, 3 bedroom, and it reconciles arithmetically as 1.25 x the $2,800 inside-limits rate. UNDERSTATEMENT FOUND: the same adopted rate sheet carries a separate one-time 'Meter Connection Charges - 5/8 x 3/4 Inch $645.00' that no row covered. Combined one-time water cost $4,145. DECISION: disclosed in this public note rather than given its own row. The verifier recommended a NEW SIBLING ROW and deliberately left correctAmount null rather than restating this precisely-scoped row. I took the note route instead, for consistency with the same-session Umatilla decision (recLOmO4os5ZJJKsR), where a $750 meter connection charge was also disclosed in the note rather than split out: in both cases the second component is a physical connection cost attached to the same connection event, not a separately adopted impact fee like Montverde's $6,150 or Sopchoppy's $7,200, which did earn their own rows. The note route is also the reversible option. If a later session prefers the split, the figure and source are recorded here. SIBLING CHECK: Ocean Ridge's only other rows are recWCKME5JZMY1N5D Municipal Impact Fee $0 and recr6mS7CLVMfNqRj Sewer Connection Fee $0 (no central sewer, converted to documented zero 8/5/2026), so neither a note nor a new row could double-count. NOTE ON NAMING: this row is titled after the PROVIDER (City of Boynton Beach) rather than the jurisdiction, which is why it does not surface in an 'Ocean Ridge' name search — it is correctly linked to the Ocean Ridge jurisdiction record. Round-2 2026-08-05; docs/verify-r2-F-pbc-miami5.json.
- Sewer Connection Fee (Town of Ocean Ridge — no central sewer)$0.00City of Boynton BeachDOCUMENTED_0, converted 8/5/2026 on owner instruction after adversarial verification. Ocean Ridge Code Ch. 58 'Utilities' was pulled IN FULL via the Municode API at Supp. 15 and contains NO sewer rates, connection charge or capital fee - only water-shortage rules and a chapter governing the FENCING of privately owned package treatment plants, which is the opposite of a municipal collection system. Local reporting (The Coastal Star) confirms 'every home is on a system' - septic or package plants with deep injection wells. Boynton Beach's own service-area statements extend only WATER to Ocean Ridge. The previously published $2,250 was a real Boynton Beach charge applied to a town Boynton does not sewer. The town has set aside $924,943 toward a $30M+ conversion but negotiations with Boynton Beach broke off and nothing has been adopted, so there is no fee to publish. This is an affirmative documented zero, not an unknown.
- Municipal Impact Fee (Town of Ocean Ridge)$0.00Town of Ocean Ridge8/4/2026: DOCUMENTED $0 — The Town of Ocean Ridge levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Ocean Ridge (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/OceanRidge.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
- School Impact Fee (School District of Palm Beach County)$7,905.90School District of Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep SFR 2,000-3,599 sf.
- Road Impact Fee (Palm Beach County Fair Share)$5,597.40Palm Beach CountyPBC Fair Share Road, Single Family Detached, eff 1/1/2026.
- Parks & Recreation Impact Fee (Palm Beach County)$1,021.87Palm Beach CountyPBC 2026 schedule for Town of Ocean Ridge, eff 1/1/2026. Rep SFR 2,000-3,599 sf.
- Public Buildings Impact Fee (Palm Beach County)$317.30Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep SFR 2,000-3,599 sf.
- Library Impact Fee (Palm Beach County)$295.45Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep SFR 2,000-3,599 sf. In county library district.
- Law Enforcement Impact Fee (Palm Beach County)$0.00Palm Beach County$0 on PBC 2026 schedule for Ocean Ridge (own police dept). Documented $0.
- Fire Rescue Impact Fee (Palm Beach County)$0.00Palm Beach County$0 on PBC 2026 schedule for Ocean Ridge (Boynton Beach fire contract). Documented $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Ridge: Multifamily Impact Fees
A new multifamily unit in Ocean Ridge pays $12,327.22 per unit in impact fees (rates sourced August 5, 2026). Of that, Palm Beach County-levied fees account for $10,077.22 and municipal or utility fees for $2,250.00.
The largest line items are School Impact Fee (School District of Palm Beach County, MF) ($6,170.25), Road Impact Fee (Palm Beach County Fair Share, MF) ($2,554.55) and Water Capital Facilities Fee (City of Boynton Beach, MF) ($2,250.00).
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the full fee schedule
- Water Capital Facilities Fee (City of Boynton Beach, MF)$2,250.00City of Boynton BeachVERIFIED 8/4/2026 from Boynton Beach FY2026 rate sheet — MF per-unit rates ARE published (not meter-size for residential). Water Capital Facilities Fee, apartments OUTSIDE city (Ocean Ridge), FY2026 per unit: 1BR $1,500; 2BR $2,250 (used); 3BR $3,000.
- Sewer Connection Fee (Town of Ocean Ridge — no central sewer, MF)$0.00City of Boynton BeachDOCUMENTED_0, converted 8/5/2026 on owner instruction after adversarial verification. Ocean Ridge Code Ch. 58 'Utilities' was pulled IN FULL via the Municode API at Supp. 15 and contains NO sewer rates, connection charge or capital fee - only water-shortage rules and a chapter governing the FENCING of privately owned package treatment plants. Local reporting confirms every home is on septic or a package plant with deep injection wells, and Boynton Beach's own service-area statements extend only WATER to the town. The previously published $1,500 exists on Boynton Beach's rate sheet but is inapplicable here. The row's former name even contained '/ septic', so it was asserting the absence while carrying an amount. Companion SFR row converted on the same evidence. This is an affirmative documented zero, not an unknown.
- Municipal Impact Fee (Town of Ocean Ridge, MF)$0.00Town of Ocean Ridge8/4/2026: DOCUMENTED $0 — The Town of Ocean Ridge levies no municipal impact fees of its own. Verified via PBC PZB 2026 impact fee schedule for The Town of Ocean Ridge (https://discover.pbcgov.org/pzb/administration/ImpactFeeSchedules/2026/OceanRidge.pdf), which lists only county-collected fees (Parks/Libraries/Public Bldgs/Schools/Fire-Rescue/Law Enf/Roads as applicable), and via Municode full-text search of the municipal code ('impact fee'), which returned no municipally-imposed impact fee (only concurrency/proportionate fair-share or utility provisions).
- School Impact Fee (School District of Palm Beach County, MF)$6,170.25School District of Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep MF 801-1,399 sf.
- Road Impact Fee (Palm Beach County Fair Share, MF)$2,554.55Mid/High-Rise (4+ stories)Palm Beach CountyPBC Fair Share Road, MF Mid/High-Rise (4+ levels), eff 1/1/2026. Default tier.
- Parks & Recreation Impact Fee (Palm Beach County, MF)$872.67Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep MF 801-1,399 sf.
- Public Buildings Impact Fee (Palm Beach County, MF)$243.20Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep MF 801-1,399 sf.
- Library Impact Fee (Palm Beach County, MF)$236.55Palm Beach CountyPBC 2026 schedule for Ocean Ridge, eff 1/1/2026. Rep MF 801-1,399 sf. In county library district.
- Fire Rescue Impact Fee (Palm Beach County, MF)$0.00Palm Beach County$0 on PBC 2026 schedule for Ocean Ridge. Documented $0.
- Law Enforcement Impact Fee (Palm Beach County, MF)$0.00Palm Beach County$0 on PBC 2026 schedule for Ocean Ridge (own police). Documented $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Ridge: Commercial Impact Fees
Commercial development in Ocean Ridge pays $8.37 per square foot in impact fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to at least $418,665.00. The calculator below adjusts to your exact square footage.
The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft) and Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft).
Sewer Connection Fee (City of Boynton Beach, outside-city / septic) and Water Connection Fee (City of Boynton Beach, outside-city) are set by the utility and not published online. City Impact Fees (Town of Ocean Ridge, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Boynton Beach, outside-city)Requires confirmationWater provider = City of Boynton Beach (outside-city, +25%). Boynton's nonres capital facilities/capacity fee is on an image-based FY26 rate sheet not machine-extractable (same limitation as Hypoluxo). $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- Sewer Connection Fee (City of Boynton Beach, outside-city / septic)Requires confirmationSewer via City of Boynton Beach (outside-city) where mains reach; much of the barrier island is on septic. Boynton nonres sewer capacity fee on image-based FY26 rate sheet not machine-extractable. $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- City Impact Fees (Town of Ocean Ridge, Commercial)Requires confirmationSmall barrier-island residential town; no municipal nonres impact-fee chapter found (Town collects PBC county fees). $0 placeholder — VERIFY 561-732-2635.
- Road (Fair Share) Impact Fee (Palm Beach County, Commercial)$7.91/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Commercial Retail 40,000-150,000 sq.ft.
- Public Buildings Impact Fee (Palm Beach County, Commercial)$0.47/sq ftPBC Public Buildings, eff 1/1/2026. Row: Retail 40,000-150,000 sq.ft.
- Parks/Library/School Impact Fees (Palm Beach County, Commercial)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
- Law Enforcement Impact Fee (Palm Beach County, Commercial)$0.00PBC 2026 schedule shows $0 Law Enforcement for Ocean Ridge (all nonres rows); Town has its own PD. Confirmed $0.
- Fire Rescue Impact Fee (Palm Beach County, Commercial)$0.00PBC 2026 schedule shows $0 Fire Rescue for Ocean Ridge (all nonres rows). Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Ridge: Industrial Impact Fees
Industrial development in Ocean Ridge pays $2.27 per square foot in impact fees (rates sourced August 5, 2026).
For a 50,000 sq ft building, that comes to at least $113,715.00. The calculator below adjusts to your exact square footage.
The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).
Sewer Connection Fee (City of Boynton Beach, outside-city / septic) and Water Connection Fee (City of Boynton Beach, outside-city) are set by the utility and not published online. City Impact Fees (Town of Ocean Ridge, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Boynton Beach, outside-city)Requires confirmationWater provider = City of Boynton Beach (outside-city, +25%). Boynton's nonres capital facilities/capacity fee is on an image-based FY26 rate sheet not machine-extractable (same limitation as Hypoluxo). $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- Sewer Connection Fee (City of Boynton Beach, outside-city / septic)Requires confirmationSewer via City of Boynton Beach (outside-city) where mains reach; much of the barrier island is on septic. Boynton nonres sewer capacity fee on image-based FY26 rate sheet not machine-extractable. $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- City Impact Fees (Town of Ocean Ridge, Industrial)Requires confirmationSmall barrier-island residential town; no municipal nonres impact-fee chapter found (Town collects PBC county fees). $0 placeholder — VERIFY 561-732-2635.
- Road (Fair Share) Impact Fee (Palm Beach County, Industrial)$2.17/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Industrial.
- Public Buildings Impact Fee (Palm Beach County, Industrial)$0.10/sq ftPBC Public Buildings, eff 1/1/2026. Row: General Industrial.
- Fire Rescue Impact Fee (Palm Beach County, Industrial)$0.00PBC 2026 schedule shows $0 Fire Rescue for Ocean Ridge (all nonres rows). Confirmed $0.
- Law Enforcement Impact Fee (Palm Beach County, Industrial)$0.00PBC 2026 schedule shows $0 Law Enforcement for Ocean Ridge (all nonres rows); Town has its own PD. Confirmed $0.
- Parks/Library/School Impact Fees (Palm Beach County, Industrial)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Ocean Ridge: Office Impact Fees
Office development in Ocean Ridge pays $5.06 per square foot in impact fees (rates sourced August 5, 2026).
For a 25,000 sq ft building, that comes to at least $126,421.25. The calculator below adjusts to your exact square footage.
The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft) and Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft).
Sewer Connection Fee (City of Boynton Beach, outside-city / septic) and Water Connection Fee (City of Boynton Beach, outside-city) are set by the utility and not published online. City Impact Fees (Town of Ocean Ridge, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
View the full fee schedule
- Water Connection Fee (City of Boynton Beach, outside-city)Requires confirmationWater provider = City of Boynton Beach (outside-city, +25%). Boynton's nonres capital facilities/capacity fee is on an image-based FY26 rate sheet not machine-extractable (same limitation as Hypoluxo). $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- Sewer Connection Fee (City of Boynton Beach, outside-city / septic)Requires confirmationSewer via City of Boynton Beach (outside-city) where mains reach; much of the barrier island is on septic. Boynton nonres sewer capacity fee on image-based FY26 rate sheet not machine-extractable. $0 placeholder — VERIFY Boynton Utilities 561-742-6000.
- City Impact Fees (Town of Ocean Ridge, Office)Requires confirmationSmall barrier-island residential town; no municipal nonres impact-fee chapter found (Town collects PBC county fees). $0 placeholder — VERIFY 561-732-2635.
- Road (Fair Share) Impact Fee (Palm Beach County, Office)$4.87/sq ftPBC Fair Share Road, eff 1/1/2026, countywide. Row: General Office.
- Public Buildings Impact Fee (Palm Beach County, Office)$0.19/sq ftPBC Public Buildings, eff 1/1/2026. Row: General Office.
- Law Enforcement Impact Fee (Palm Beach County, Office)$0.00PBC 2026 schedule shows $0 Law Enforcement for Ocean Ridge (all nonres rows); Town has its own PD. Confirmed $0.
- Fire Rescue Impact Fee (Palm Beach County, Office)$0.00PBC 2026 schedule shows $0 Fire Rescue for Ocean Ridge (all nonres rows). Confirmed $0.
- Parks/Library/School Impact Fees (Palm Beach County, Office)$0.00PBC 2026 schedule: Parks, Libraries, Schools columns are $0.00 for all nonresidential rows. Confirmed $0.
Where in Palm Beach County are you building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Estimate your project in Ocean Ridge
Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How impact fees work in Florida
Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.
Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.
Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.
Frequently asked questions
What are the total impact fees for a single-family home in Ocean Ridge, Florida?
A new single-family home in Ocean Ridge pays $18,637.92 per unit in combined impact fees (rates sourced August 5, 2026).
How much are commercial impact fees in Ocean Ridge?
Commercial development in Ocean Ridge pays $8.37 per square foot in impact fees, at least $418,665.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.
Does Ocean Ridge charge its own impact fees?
Yes. Ocean Ridge levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Ocean Ridge, with the combined total.
Can Florida impact fees increase at any time?
No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Palm Beach County impact fees page.