Lake Clarke Shores applies its own fee schedule: municipal fees plus the Palm Beach County-levied fees that apply inside city limits. Combined, a new single-family home pays at least $15,734.61 per unit (rates sourced July 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Lake Clarke Shores impact fees by project type

Lake Clarke Shores: Single-Family Impact Fees

A new single-family home in Lake Clarke Shores pays at least $15,734.61 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are County School Impact Fee (Town of Lake Clarke Shores) ($7,905.90), County Road/Fair Share Impact Fee (Town of Lake Clarke Shores) ($5,597.40) and County Parks & Recreation Impact Fee (Town of Lake Clarke Shores) ($1,225.26).

Water Connection/Capacity Fee (Town of Lake Clarke Shores) and Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lake Clarke Shores)
    Town of Lake Clarke Shores
    INFERRED_0 (8/4/2026). Town-owned water utility confirmed. Code Ch.62 Sec.62-194 (Municode): water connection charges 'as established by town resolution' (meters >1" case-by-case); Sec.62-189: connection charges per schedules 'duly promulgated by ordinance'. The resolution/schedule amounts are NOT posted online (utility pages show only monthly rates; site is bot-blocked). CALL Town Hall Utility Support (561) 642-7870 or Town Clerk (561) 964-1515 for the current resolution.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (Town of Lake Clarke Shores)
    Town of Lake Clarke Shores
    INFERRED_0 (8/4/2026). Code Ch.62 Sec.62-190 (Municode): charges for connection to the town SEWER system are established 'on a case-by-case basis' — no fixed published amount exists by design; some areas are PBCWUD by location. CALL Town Hall Utility Support (561) 642-7870.
    Requires confirmation
City$0.00
  • Municipal Impact Fee (Town of Lake Clarke Shores)
    Town of Lake Clarke Shores
    8/4/2026: DOCUMENTED $0 — Town of Lake Clarke Shores levies no municipal impact fee. Only 'impact fee' provision in Municode is Sec. 10-90 ('Town excluded from county impact fee'), a legacy 1980s provision purporting to exclude the town from the county fair-share road fee (county Ord. 87-18); note the county's CURRENT 2026 schedule for Lake Clarke Shores nevertheless lists full county fees (SFD road $5,597.40 etc.), so the exclusion appears superseded/historic. No town-imposed fee exists.
    $0.00
County$15,734.61
Total (Lake Clarke Shores): $15,734.61
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Clarke Shores: Multifamily Impact Fees

A new multifamily unit in Lake Clarke Shores pays at least $10,515.00 per unit in impact fees (rates sourced July 17, 2026). All of it is levied by Palm Beach County.

The largest line items are County School Impact Fee (Town of Lake Clarke Shores) (MF) ($6,170.25), County Road/Fair Share Impact Fee (Town of Lake Clarke Shores) (MF) ($2,554.55) and County Parks & Recreation Impact Fee (Town of Lake Clarke Shores) (MF) ($1,046.35).

Water Connection/Capacity Fee (Town of Lake Clarke Shores) (MF) and Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) (MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lake Clarke Shores) (MF)
    Town of Lake Clarke Shores
    INFERRED_0 (8/4/2026). Town-owned water utility confirmed. Code Ch.62 Sec.62-194 (Municode): water connection charges 'as established by town resolution' (meters >1" case-by-case); Sec.62-189: connection charges per schedules 'duly promulgated by ordinance'. The resolution/schedule amounts are NOT posted online (utility pages show only monthly rates; site is bot-blocked). CALL Town Hall Utility Support (561) 642-7870 or Town Clerk (561) 964-1515 for the current resolution.
    Requires confirmation
Sewer$0.00
  • Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) (MF)
    Town of Lake Clarke Shores
    INFERRED_0 (8/4/2026). Code Ch.62 Sec.62-190 (Municode): charges for connection to the town SEWER system are established 'on a case-by-case basis' — no fixed published amount exists by design; some areas are PBCWUD by location. CALL Town Hall Utility Support (561) 642-7870.
    Requires confirmation
City$0.00
  • Municipal Impact Fee (Town of Lake Clarke Shores) (MF)
    Town of Lake Clarke Shores
    8/4/2026: DOCUMENTED $0 — Town of Lake Clarke Shores levies no municipal impact fee. Only 'impact fee' provision in Municode is Sec. 10-90 ('Town excluded from county impact fee'), a legacy 1980s provision purporting to exclude the town from the county fair-share road fee (county Ord. 87-18); note the county's CURRENT 2026 schedule for Lake Clarke Shores nevertheless lists full county fees (SFD road $5,597.40 etc.), so the exclusion appears superseded/historic. No town-imposed fee exists.
    $0.00
County$10,515.00
Total (Lake Clarke Shores): $10,515.00
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Lake Clarke Shores: Commercial Impact Fees

Commercial development in Lake Clarke Shores pays $8.54 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $426,835.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Commercial) ($7.91/sq ft), Public Buildings Impact Fee (Palm Beach County, Commercial) ($0.47/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Commercial) ($0.16/sq ft).

Water Connection/Capacity Fee (Town of Lake Clarke Shores) and Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) are set by the utility and not published online. City Impact Fees (Town of Lake Clarke Shores, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lake Clarke Shores)
    Town operates its own water utility (~700 connections); some areas served by PBC Water Utilities Dept or Village of Palm Springs by location. Nonres capacity/connection fee not web-published. $0 placeholder — VERIFY Town Hall Utility Support 561-642-7870.
    Requires confirmation
Sewer$0.00
City$0.00
County$8.54/sq ft
Total (Lake Clarke Shores): $8.54/sq ft (≈ $426,835.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$458,180.50Atlantis$418,665.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$418,665.00Includes unconfirmed feesBoynton Beach$418,665.00Includes unconfirmed feesBriny Breezes$418,665.00Includes unconfirmed feesCloud Lake$430,920.50Includes unconfirmed feesDelray Beach$420,537.00Includes unconfirmed feesGlen Ridge$446,696.50Includes unconfirmed feesGolf$422,750.50Includes unconfirmed feesGreenacres$445,925.00Includes unconfirmed feesGulf Stream$419,990.00Includes unconfirmed feesHaverhill$446,696.50Highland Beach$418,665.00Includes unconfirmed feesHypoluxo$418,665.00Includes unconfirmed feesJuno Beach$429,535.00Includes unconfirmed feesJupiter$430,331.35Includes unconfirmed feesJupiter Inlet Colony$430,331.35Includes unconfirmed fees
Lake Clarke Shores$426,835.00this pageIncludes unconfirmed fees
Lake Park$429,535.00Includes unconfirmed feesLake Worth Beach$442,190.00Includes unconfirmed feesLantana$426,835.00Includes unconfirmed feesLoxahatchee Groves$430,920.50Includes unconfirmed feesManalapan$418,665.00Includes unconfirmed feesMangonia Park$418,665.00Includes unconfirmed feesNorth Palm Beach$421,365.00Includes unconfirmed feesOcean Ridge$418,665.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$418,665.00Includes unconfirmed feesPalm Beach Gardens$720,750.00Includes unconfirmed feesPalm Beach Shores$445,925.00Includes unconfirmed feesPalm Springs$438,643.00Includes unconfirmed feesRiviera Beach$592,176.00Royal Palm Beach$454,095.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$446,028.76Includes unconfirmed feesTequesta$422,161.35Includes unconfirmed feesWellington$442,622.00Includes unconfirmed feesWest Palm Beach$775,090.00Westlake$430,920.50Includes unconfirmed fees

Lake Clarke Shores: Industrial Impact Fees

Industrial development in Lake Clarke Shores pays $2.39 per square foot in impact fees (rates sourced July 17, 2026).

For a 50,000 sq ft building, that comes to at least $119,415.00. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Industrial) ($2.17/sq ft), Fire Rescue Impact Fee (Palm Beach County, Industrial) ($0.11/sq ft) and Public Buildings Impact Fee (Palm Beach County, Industrial) ($0.10/sq ft).

Water Connection/Capacity Fee (Town of Lake Clarke Shores) and Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) are set by the utility and not published online. City Impact Fees (Town of Lake Clarke Shores, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lake Clarke Shores)
    Town operates its own water utility (~700 connections); some areas served by PBC Water Utilities Dept or Village of Palm Springs by location. Nonres capacity/connection fee not web-published. $0 placeholder — VERIFY Town Hall Utility Support 561-642-7870.
    Requires confirmation
Sewer$0.00
City$0.00
County$2.39/sq ft
Total (Lake Clarke Shores): $2.39/sq ft (≈ $119,415.00 at 50,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$147,200.00Atlantis$113,715.00Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$113,715.00Includes unconfirmed feesBoynton Beach$113,715.00Includes unconfirmed feesBriny Breezes$113,715.00Includes unconfirmed feesCloud Lake$119,940.00Includes unconfirmed feesDelray Beach$115,587.00Includes unconfirmed feesGlen Ridge$135,716.00Includes unconfirmed feesGolf$114,240.00Includes unconfirmed feesGreenacres$140,975.00Includes unconfirmed feesGulf Stream$115,040.00Includes unconfirmed feesHaverhill$135,716.00Highland Beach$113,715.00Includes unconfirmed feesHypoluxo$113,715.00Includes unconfirmed feesJuno Beach$122,115.00Includes unconfirmed feesJupiter$122,911.35Includes unconfirmed feesJupiter Inlet Colony$117,211.35Includes unconfirmed fees
Lake Clarke Shores$119,415.00this pageIncludes unconfirmed fees
Lake Park$122,115.00Includes unconfirmed feesLake Worth Beach$134,770.00Includes unconfirmed feesLantana$119,415.00Includes unconfirmed feesLoxahatchee Groves$119,940.00Includes unconfirmed feesManalapan$113,715.00Includes unconfirmed feesMangonia Park$113,715.00Includes unconfirmed feesNorth Palm Beach$116,415.00Includes unconfirmed feesOcean Ridge$113,715.00Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$113,715.00Includes unconfirmed feesPalm Beach Gardens$265,500.00Includes unconfirmed feesPalm Beach Shores$140,975.00Includes unconfirmed feesPalm Springs$123,325.00Includes unconfirmed feesRiviera Beach$151,303.50Royal Palm Beach$146,675.00South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$138,608.76Includes unconfirmed feesTequesta$117,211.35Includes unconfirmed feesWellington$135,202.00Includes unconfirmed feesWest Palm Beach$217,090.00Westlake$119,940.00Includes unconfirmed fees

Lake Clarke Shores: Office Impact Fees

Office development in Lake Clarke Shores pays $5.13 per square foot in impact fees (rates sourced July 17, 2026).

For a 25,000 sq ft building, that comes to at least $128,202.50. The calculator below adjusts to your exact square footage.

The largest line items are Road (Fair Share) Impact Fee (Palm Beach County, Office) ($4.87/sq ft), Public Buildings Impact Fee (Palm Beach County, Office) ($0.19/sq ft) and Fire Rescue Impact Fee (Palm Beach County, Office) ($0.07/sq ft).

Water Connection/Capacity Fee (Town of Lake Clarke Shores) and Sewer Connection/Capacity Fee (Town of Lake Clarke Shores) are set by the utility and not published online. City Impact Fees (Town of Lake Clarke Shores, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

View the full fee schedule
Water$0.00
  • Water Connection/Capacity Fee (Town of Lake Clarke Shores)
    Town operates its own water utility (~700 connections); some areas served by PBC Water Utilities Dept or Village of Palm Springs by location. Nonres capacity/connection fee not web-published. $0 placeholder — VERIFY Town Hall Utility Support 561-642-7870.
    Requires confirmation
Sewer$0.00
City$0.00
County$5.13/sq ft
Total (Lake Clarke Shores): $5.13/sq ft (≈ $128,202.50 at 25,000 sq ft)
Sources last checked July 17, 2026
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Palm Beach County are you building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including one-time water/sewer fees (assuming a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Unincorporated Palm Beach County$155,835.50Atlantis$126,421.25Includes unconfirmed feesBelle Glade$27,260.00*Includes unconfirmed feesBoca Raton$126,421.25Includes unconfirmed feesBoynton Beach$126,421.25Includes unconfirmed feesBriny Breezes$126,421.25Includes unconfirmed feesCloud Lake$128,575.50Includes unconfirmed feesDelray Beach$128,293.25Includes unconfirmed feesGlen Ridge$144,351.50Includes unconfirmed feesGolf$126,794.25Includes unconfirmed feesGreenacres$153,681.25Includes unconfirmed feesGulf Stream$127,746.25Includes unconfirmed feesHaverhill$144,351.50Highland Beach$126,421.25Includes unconfirmed feesHypoluxo$126,421.25Includes unconfirmed feesJuno Beach$130,902.50Includes unconfirmed feesJupiter$131,698.85Includes unconfirmed feesJupiter Inlet Colony$129,917.60Includes unconfirmed fees
Lake Clarke Shores$128,202.50this pageIncludes unconfirmed fees
Lake Park$130,902.50Includes unconfirmed feesLake Worth Beach$143,557.50Includes unconfirmed feesLantana$128,202.50Includes unconfirmed feesLoxahatchee Groves$128,575.50Includes unconfirmed feesManalapan$126,421.25Includes unconfirmed feesMangonia Park$126,421.25Includes unconfirmed feesNorth Palm Beach$129,121.25Includes unconfirmed feesOcean Ridge$126,421.25Includes unconfirmed feesPahokee$0.00Includes unconfirmed feesPalm Beach$126,421.25Includes unconfirmed feesPalm Beach Gardens$221,475.00Includes unconfirmed feesPalm Beach Shores$153,681.25Includes unconfirmed feesPalm Springs$131,682.50Includes unconfirmed feesRiviera Beach$165,265.25Royal Palm Beach$155,462.50South Bay$27,260.00*Includes unconfirmed feesSouth Palm Beach$147,396.26Includes unconfirmed feesTequesta$129,917.60Includes unconfirmed feesWellington$143,989.50Includes unconfirmed feesWest Palm Beach$251,096.25Westlake$128,575.50Includes unconfirmed fees

Estimate your project in Lake Clarke Shores

Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Loading map…
Search an address or click anywhere on the map to begin.

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How impact fees work in Florida

Florida impact fees are one-time charges on new development, governed by Section 163.31801, Florida Statutes (the Florida Impact Fee Act). The statute requires fees to be based on the most recent and localized data, spent on the infrastructure category they were collected for, and adopted by ordinance.

Since 2021, the law also limits how fast fees can rise: increases up to 25% phase in over two years, increases of 25–50% phase in over four years, and increases above 50% are allowed only with a demonstrated extraordinary-circumstances study and at least a two-thirds vote of the governing body.

Counties and cities can both levy impact fees. Inside an incorporated city, a project typically pays the county's countywide fees plus any municipal fees the city has adopted, which is why totals differ between a city and the unincorporated county around it.

Frequently asked questions

What are the total impact fees for a single-family home in Lake Clarke Shores, Florida?

A new single-family home in Lake Clarke Shores pays at least $15,734.61 per unit in combined impact fees (rates sourced July 17, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Lake Clarke Shores?

Commercial development in Lake Clarke Shores pays $8.54 per square foot in impact fees, at least $426,835.00 for a 50,000 sq ft building. 3 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

Does Lake Clarke Shores charge its own impact fees?

Yes. Lake Clarke Shores levies its own municipal impact or utility fees, and county-levied fees also apply inside city limits. The schedule on this page shows every fee that applies to development in Lake Clarke Shores, with the combined total.

Can Florida impact fees increase at any time?

No. Section 163.31801, Florida Statutes limits increases to 50% at most, phased in over two to four years, unless the local government makes extraordinary-circumstances findings and approves the increase by at least a two-thirds vote.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Palm Beach County impact fees page.

Missing a jurisdiction? Get in touch.

Request coverage for a city or county, report an issue, ask about enterprise access, or inquire about sponsorship opportunities. We typically reply within one business day.