Unincorporated Collin County: Single-Family Impact Fees
A new single-family home in unincorporated Collin County pays at least $4,300.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee — Culleoka WSC, 5/8" x 3/4" meter ($3,175 capital contribution + $1,125 installation) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee — On-site septic (Collin County Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Collin County Impact Fee Schedule
- Water Connection Fee — Culleoka WSC, 5/8" x 3/4" meter ($3,175 capital contribution + $1,125 installation)$4,300.00Requires confirmationCulleoka Water Supply CorporationUnincorporated Collin County is served by several rural water utilities depending on parcel location, or by private wells. Shown is Culleoka WSC, the largest rural system by connections; Bear Creek SUD, Nevada SUD, North Collin SUD and Wylie Northeast SUD are options. Culleoka's amounts are minimums and actual extension costs can be higher.
- Sewer Connection Fee — On-site septic (Collin County Unincorporated)Requires confirmationMost unincorporated parcels use on-site septic systems, with no connection fee. Parcels in Wylie Northeast SUD's sewer area pay a $2,500 capacity fee plus the district's tap cost; districts elsewhere set their own charges.
- City / Development Impact Fee (Collin County Unincorporated)$0.00No municipal impact fees apply in unincorporated Collin County.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Collin County: Multifamily Impact Fees
A new multifamily unit in unincorporated Collin County pays at least $4,300.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
Water Connection Fee (MF) — Culleoka WSC, 5/8" x 3/4" meter ($3,175 capital contribution + $1,125 installation) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (MF) — On-site septic (Collin County Unincorporated) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Collin County Impact Fee Schedule
- Water Connection Fee (MF) — Culleoka WSC, 5/8" x 3/4" meter ($3,175 capital contribution + $1,125 installation)$4,300.00Requires confirmationCulleoka Water Supply CorporationUnincorporated Collin County is served by several rural water utilities depending on parcel location. Shown is Culleoka WSC, the largest rural system by connections; Bear Creek SUD, Nevada SUD, North Collin SUD and Wylie Northeast SUD are options. Fees are per meter, so a building on one master meter pays once at that meter's size. Amounts are minimums.
- Sewer Connection Fee (MF) — On-site septic (Collin County Unincorporated)Requires confirmationMost unincorporated parcels use on-site septic systems. Parcels in Wylie Northeast SUD's sewer area pay a $2,500 capacity fee plus tap cost per connection; districts elsewhere set their own charges.
- City / Development Impact Fee (Collin County Unincorporated, MF)$0.00No municipal impact fees apply in unincorporated Collin County.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Collin County: Commercial Impact Fees
Commercial development in unincorporated Collin County pays no per-square-foot impact fees, but owes $7,550.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to at least $7,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Collin County Unincorporated, septic or district) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Collin County Impact Fee Schedule
- Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation)$7,550.00 one-timeRequires confirmationCulleoka Water Supply CorporationUnincorporated Collin County is served by several rural water utilities by location. Culleoka WSC (south of Princeton, north of Lake Lavon) charges a one-time front end capital contribution plus a meter installation fee by meter size; the figures are minimums, and service on meters above 5/8 inch is non-standard, adding actual line extension and engineering costs. A $200 refundable membership fee also applies. Rates effective October 1, 2026. North Collin SUD quotes commercial connections case by case. Parcels on private wells pay no utility connection fee.
- Sewer Connection Fee (Collin County Unincorporated, septic or district)Requires confirmationOn-site septic or local utility districtMost unincorporated Collin County parcels use on-site septic systems, which carry no utility connection fee. Sewer service in the unincorporated area otherwise comes from a municipal utility district or developer plant serving a specific subdivision, or from Wylie Northeast SUD near Wylie and St. Paul, each with its own charges.
- City Impact Fee (Collin County - Unincorporated, Commercial)$0.00None (unincorporated)This is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Collin County: Industrial Impact Fees
Industrial development in unincorporated Collin County pays no per-square-foot impact fees, but owes $7,550.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to at least $7,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Collin County Unincorporated, septic or district) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Collin County Impact Fee Schedule
- Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation)$7,550.00 one-timeRequires confirmationCulleoka Water Supply CorporationUnincorporated Collin County is served by several rural water utilities by location. Culleoka WSC (south of Princeton, north of Lake Lavon) charges a one-time front end capital contribution plus a meter installation fee by meter size; the figures are minimums, and service on meters above 5/8 inch is non-standard, adding actual line extension and engineering costs. A $200 refundable membership fee also applies. Rates effective October 1, 2026. North Collin SUD quotes commercial connections case by case. Parcels on private wells pay no utility connection fee.
- Sewer Connection Fee (Collin County Unincorporated, septic or district)Requires confirmationOn-site septic or local utility districtMost unincorporated Collin County parcels use on-site septic systems, which carry no utility connection fee. Sewer service in the unincorporated area otherwise comes from a municipal utility district or developer plant serving a specific subdivision, or from Wylie Northeast SUD near Wylie and St. Paul, each with its own charges.
- City Impact Fee (Collin County - Unincorporated, Industrial)$0.00None (unincorporated)This is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Unincorporated Collin County: Office Impact Fees
Office development in unincorporated Collin County pays no per-square-foot impact fees, but owes $7,550.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to at least $7,550.00. The calculator below adjusts to your exact square footage.
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Sewer Connection Fee (Collin County Unincorporated, septic or district) is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Collin County Impact Fee Schedule
- Water Connection Fee — Culleoka WSC, 1" meter ($5,800 capital contribution + $1,750 installation)$7,550.00 one-timeRequires confirmationCulleoka Water Supply CorporationUnincorporated Collin County is served by several rural water utilities by location. Culleoka WSC (south of Princeton, north of Lake Lavon) charges a one-time front end capital contribution plus a meter installation fee by meter size; the figures are minimums, and service on meters above 5/8 inch is non-standard, adding actual line extension and engineering costs. A $200 refundable membership fee also applies. Rates effective October 1, 2026. North Collin SUD quotes commercial connections case by case. Parcels on private wells pay no utility connection fee.
- Sewer Connection Fee (Collin County Unincorporated, septic or district)Requires confirmationOn-site septic or local utility districtMost unincorporated Collin County parcels use on-site septic systems, which carry no utility connection fee. Sewer service in the unincorporated area otherwise comes from a municipal utility district or developer plant serving a specific subdivision, or from Wylie Northeast SUD near Wylie and St. Paul, each with its own charges.
- City Impact Fee (Collin County - Unincorporated, Office)$0.00None (unincorporated)This is unincorporated county land with no municipal government, so no city impact fees apply.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Collin County Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Collin County Impact Fee FAQs
What are single-family impact fees in Collin County, Texas?
A new single-family home in unincorporated Collin County pays at least $4,300.00 per unit in impact fees (rates sourced November 19, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Inside city limits, fees are set by each city's own schedule and may be completely different. See the city pages for their rates.
How much are multifamily impact fees in Collin County?
Multifamily development in unincorporated Collin County pays at least $4,300.00 per unit in impact fees (rates sourced November 19, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. Rates inside city limits depend on the municipality. Pick your city on this page.
How much are commercial impact fees in Collin County?
Commercial development in unincorporated Collin County pays no per-square-foot impact fees, but owes $7,550.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
Do cities in Collin County charge their own impact fees?
Yes. Every incorporated city applies its own fee schedule. 21 of 23 cities in Collin County levy municipal impact or utility fees; each city page shows the full schedule that applies inside its limits.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.