Wylie Impact Fees by Project Type
Wylie: Single-Family Impact Fees
A new single-family home in Wylie pays $20,748.82 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Tap Fee (City of Wylie) ($6,500.00), Water Tap Fee (City of Wylie) — Up to 1", opposite side of street ($6,000.00) and Water Impact Fee (City of Wylie) — 5/8" & 3/4" meter ($4,137.06).
Park Land Dedication Fee (City of Wylie) — 5+ lots per acre is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Wylie Impact Fee Schedule
- Water Tap Fee (City of Wylie) — Up to 1", opposite side of street$6,000.00City of WylieWater tap for a service up to 1 inch when the service is on the opposite side of the street from the tap ($5,000 base plus $1,000). The highest of 2 tap locations; a same-side tap pays $5,000. Paid in addition to the water impact fee and the meter and connection fee.
- Water Impact Fee (City of Wylie) — 5/8" & 3/4" meter$4,137.06City of WylieWater impact fee for a home on a 5/8 or 3/4 inch meter (1 living unit equivalent), for development with final plat approval after May 11, 2020. Larger residential meters pay more.
- Water Meter and Connection Fee (City of Wylie) — 3/4" meter$390.00City of WylieOne-time meter and connection fee for a 3/4 inch domestic meter, adopted September 13, 2022. Larger meters pay more. A refundable service deposit is separate.
- Wastewater Tap Fee (City of Wylie)$6,500.00City of WylieWastewater tap at a depth of 0 to 8 feet, adopted September 13, 2022. A tap deeper than 8 feet is charged at cost plus $500. Paid in addition to the wastewater impact fee.
- Wastewater Impact Fee (City of Wylie) — 5/8" & 3/4" meter$876.35City of WylieWastewater impact fee for a home on a 5/8 or 3/4 inch meter (1 living unit equivalent), for development with final plat approval after May 11, 2020. Larger residential meters pay more.
- Park Land Dedication Fee (City of Wylie) — 5+ lots per acre$1,500.00Requires confirmationCity of WyliePark land dedication fee in lieu of land, per lot, set by lot density: $1,500 per lot at five or more lots per acre (a typical 8,000 sq ft lot), $2,000 at three or four, $3,000 at one or two. Comprehensive Fee Schedule Section IX.B as amended by Ordinance 2024-07 (March 12, 2024). It is paid at final plat, so a lot already platted has paid it; dedicating land may replace it.
- Roadway Impact Fee (City of Wylie) — 2.97 veh-mi × $453/veh-mi$1,345.41City of WylieRoadway impact fee per single-family home for development with final plat approval after May 11, 2020; the same rate applies in both city service areas.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wylie: Multifamily Impact Fees
A new multifamily unit in Wylie pays $19,301.37 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Tap Fee (City of Wylie, MF) ($6,500.00), Water Tap Fee (City of Wylie, MF) — Up to 1", opposite side of street ($6,000.00) and Water Impact Fee (City of Wylie, MF) — 5/8" & 3/4" meter ($4,137.06).
Park Land Dedication Fee (City of Wylie, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Wylie Impact Fee Schedule
- Water Tap Fee (City of Wylie, MF) — Up to 1", opposite side of street$6,000.00City of WylieCharged per tap, not per unit: a building on one connection pays once. Shown for a tap up to 1 inch on the opposite side of the street ($5,000 base plus $1,000), the highest of 2 tap locations; a same-side tap pays $5,000.
- Water Impact Fee (City of Wylie, MF) — 5/8" & 3/4" meter$4,137.06City of WylieCharged by water meter size, not per unit: a building on one master meter pays once at its meter size, from $4,137.06 at a 5/8 or 3/4 inch meter (1 living unit equivalent). Applies to final plats approved after May 11, 2020.
- Water Meter and Connection Fee (City of Wylie, MF) — 3/4" meter$390.00City of WylieCharged per meter, not per unit: a building on one meter pays once at its size, from $390 at a 3/4 inch domestic meter. A refundable service deposit is separate.
- Wastewater Tap Fee (City of Wylie, MF)$6,500.00City of WylieCharged per tap, not per unit: a building on one connection pays once. Shown for a tap 0 to 8 feet deep; a deeper tap is charged at cost plus $500.
- Wastewater Impact Fee (City of Wylie, MF) — 5/8" & 3/4" meter$876.35City of WylieCharged by water meter size, not per unit: a building on one master meter pays once at its meter size, from $876.35 at a 5/8 or 3/4 inch meter (1 living unit equivalent). Applies to final plats approved after May 11, 2020.
- Park Land Dedication Fee (City of Wylie, MF)$800.00Requires confirmationCity of WyliePark land dedication fee in lieu of land of $800 per apartment unit, Comprehensive Fee Schedule Section IX.B as amended by Ordinance 2024-07 (March 12, 2024). It is paid at final plat, so a lot already platted has paid it; dedicating land may replace it.
- Roadway Impact Fee (City of Wylie, MF) — Mid-Rise, 1.32 veh-mi × $453/veh-mi$597.96City of WylieRoadway impact fee per mid-rise apartment unit for final plats approved after May 11, 2020; the same rate applies in both city service areas.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wylie: Commercial Impact Fees
Commercial development in Wylie pays $3.42 per square foot in impact fees, plus $20,467.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $191,248.80. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Wylie) — 1" meter ($7,033.00 one-time), Wastewater Tap Fee (City of Wylie) ($6,500.00 one-time) and Water Tap Fee (City of Wylie) — up to 1" ($5,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wylie Impact Fee Schedule
- Water Impact Fee (City of Wylie) — 1" meter$7,033.00 one-timeCity of WylieWylie water impact fee for a 1 inch meter: 1.7 living unit equivalents at $4,137.06 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $910,153.20 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Water Tap Fee (City of Wylie) — up to 1"$5,000.00 one-timeCity of WylieWylie water tap fee for a service up to 1 inch, charged in addition to the impact fees and the meter and connection fee; $1,000 more when the service is on the opposite side of the street from the tap.
- Water Meter and Connection Fee (City of Wylie) — 1" meter$445.00 one-timeCity of WylieWylie water meter and connection fee for a 1 inch domestic meter ($390 for 3/4 inch, $1,150 for 2 inch), in addition to the tap fee and impact fees.
- Wastewater Tap Fee (City of Wylie)$6,500.00 one-timeCity of WylieWylie wastewater tap fee for a tap up to 8 feet deep, in addition to the wastewater impact fee; deeper taps are billed at cost plus $500.
- Wastewater Impact Fee (City of Wylie) — 1" meter$1,489.80 one-timeCity of WylieWylie wastewater impact fee for a 1 inch meter: 1.7 living unit equivalents at $876.35 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $192,797 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Roadway Impact Fee (City of Wylie, Commercial) — 7.54 veh-mi × $453/veh-mi$3.42/sq ftCity of WylieWylie thoroughfare impact fee for shopping center space, per 1,000 sq ft of gross floor area: 7.54 vehicle-miles at $453 per vehicle-mile, the same in the East and West service areas. Applies to development with final plat approval after May 11, 2020. The city began a new impact fee study in December 2025, so a revised schedule may follow.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wylie: Industrial Impact Fees
Industrial development in Wylie pays $0.86 per square foot in impact fees, plus $20,467.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 50,000 sq ft building, that comes to about $63,276.30. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Wylie) — 1" meter ($7,033.00 one-time), Wastewater Tap Fee (City of Wylie) ($6,500.00 one-time) and Water Tap Fee (City of Wylie) — up to 1" ($5,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wylie Impact Fee Schedule
- Water Impact Fee (City of Wylie) — 1" meter$7,033.00 one-timeCity of WylieWylie water impact fee for a 1 inch meter: 1.7 living unit equivalents at $4,137.06 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $910,153.20 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Water Tap Fee (City of Wylie) — up to 1"$5,000.00 one-timeCity of WylieWylie water tap fee for a service up to 1 inch, charged in addition to the impact fees and the meter and connection fee; $1,000 more when the service is on the opposite side of the street from the tap.
- Water Meter and Connection Fee (City of Wylie) — 1" meter$445.00 one-timeCity of WylieWylie water meter and connection fee for a 1 inch domestic meter ($390 for 3/4 inch, $1,150 for 2 inch), in addition to the tap fee and impact fees.
- Wastewater Tap Fee (City of Wylie)$6,500.00 one-timeCity of WylieWylie wastewater tap fee for a tap up to 8 feet deep, in addition to the wastewater impact fee; deeper taps are billed at cost plus $500.
- Wastewater Impact Fee (City of Wylie) — 1" meter$1,489.80 one-timeCity of WylieWylie wastewater impact fee for a 1 inch meter: 1.7 living unit equivalents at $876.35 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $192,797 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Roadway Impact Fee (City of Wylie, Industrial) — 1.89 veh-mi × $453/veh-mi$0.86/sq ftCity of WylieWylie thoroughfare impact fee for industrial space, per 1,000 sq ft of gross floor area: 1.89 vehicle-miles at $453 per vehicle-mile, the same in the East and West service areas. Applies to development with final plat approval after May 11, 2020. The city began a new impact fee study in December 2025, so a revised schedule may follow.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wylie: Office Impact Fees
Office development in Wylie pays $1.93 per square foot in impact fees, plus $20,467.80 in one-time water and sewer connection fees (rates sourced November 25, 2026).
For a 25,000 sq ft building, that comes to about $68,712.30. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Wylie) — 1" meter ($7,033.00 one-time), Wastewater Tap Fee (City of Wylie) ($6,500.00 one-time) and Water Tap Fee (City of Wylie) — up to 1" ($5,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Wylie Impact Fee Schedule
- Water Impact Fee (City of Wylie) — 1" meter$7,033.00 one-timeCity of WylieWylie water impact fee for a 1 inch meter: 1.7 living unit equivalents at $4,137.06 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $910,153.20 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Water Tap Fee (City of Wylie) — up to 1"$5,000.00 one-timeCity of WylieWylie water tap fee for a service up to 1 inch, charged in addition to the impact fees and the meter and connection fee; $1,000 more when the service is on the opposite side of the street from the tap.
- Water Meter and Connection Fee (City of Wylie) — 1" meter$445.00 one-timeCity of WylieWylie water meter and connection fee for a 1 inch domestic meter ($390 for 3/4 inch, $1,150 for 2 inch), in addition to the tap fee and impact fees.
- Wastewater Tap Fee (City of Wylie)$6,500.00 one-timeCity of WylieWylie wastewater tap fee for a tap up to 8 feet deep, in addition to the wastewater impact fee; deeper taps are billed at cost plus $500.
- Wastewater Impact Fee (City of Wylie) — 1" meter$1,489.80 one-timeCity of WylieWylie wastewater impact fee for a 1 inch meter: 1.7 living unit equivalents at $876.35 per LUE. Applies to development with final plat approval after May 11, 2020; larger meters pay by their LUE rating, up to $192,797 for a 12 inch turbine. The city began a new impact fee study in December 2025, so revised rates may follow.
- Roadway Impact Fee (City of Wylie, Office) — 4.26 veh-mi × $453/veh-mi$1.93/sq ftCity of WylieWylie thoroughfare impact fee for an office building, per 1,000 sq ft of gross floor area: 4.26 vehicle-miles at $453 per vehicle-mile, the same in the East and West service areas. Applies to development with final plat approval after May 11, 2020. The city began a new impact fee study in December 2025, so a revised schedule may follow.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Wylie Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Wylie Impact Fee FAQs
What are the total impact fees for a single-family home in Wylie, Texas?
A new single-family home in Wylie pays $20,748.82 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Wylie?
Commercial development in Wylie pays $3.42 per square foot in impact fees, plus $20,467.80 in one-time water and sewer connection fees (assuming a 1-inch meter), about $191,248.80 for a 50,000 sq ft building.
Does Wylie charge its own impact fees?
Yes. Wylie levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Wylie. The schedule on this page shows every fee that applies to development in Wylie.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.