Skip to content
IMPACTFEES.ORG

Murphy, Texas Impact Fees

Murphy applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays $4,899.00 per unit (rates sourced ). The full breakdown is below.

Murphy Impact Fees by Project Type

Murphy: Single-Family Impact Fees

A new single-family home in Murphy pays $4,899.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Murphy) — 3/4" meter ($1,912.00), Water Impact Fee (City of Murphy) — 3/4" meter ($1,207.00) and Parkland Dedication Fee in Lieu (City of Murphy) ($1,200.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Murphy Impact Fee Schedule
Water$1,637.00
  • Water Impact Fee (City of Murphy) — 3/4" meter
    City of Murphy
    Water impact fee for the standard residential 3/4 inch meter (1 living unit equivalent); larger meters pay more. A lot connecting to a water main the city extended also pays a pro rata charge of $4.75 per front foot (Code App. A Sec. A8.003), unless the developer built or paid for the line.
    $1,207.00
  • Water Meter Fee (City of Murphy) — 3/4" meter
    City of Murphy
    City water meter fee for the standard residential 3/4 inch meter. Water and sewer tap installation is billed separately at the city's full cost.
    $430.00
Sewer$2,062.00
  • Wastewater Impact Fee (City of Murphy) — 3/4" meter
    City of Murphy
    Wastewater impact fee for the standard residential 3/4 inch meter (1 living unit equivalent); larger meters pay more. A lot connecting to a sewer main the city extended also pays a pro rata charge of $4.90 per front foot (Code App. A Sec. A8.003), unless the developer built or paid for the line.
    $1,912.00
  • Sewer Connection Fee (City of Murphy) — 4" tie-in
    City of Murphy
    Sewer connection fee for a 4 inch tie-in, the standard residential service line. Tap installation is billed separately at the city's full cost.
    $150.00
City$1,200.00
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Murphy): $4,899.00
Sources last checked Official fee schedules:City of Murphy Collin County

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Murphy: Multifamily Impact Fees

A new multifamily unit in Murphy pays $4,899.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Murphy, MF) — 3/4" meter ($1,912.00), Water Impact Fee (City of Murphy, MF) — 3/4" meter ($1,207.00) and Parkland Dedication Fee in Lieu (City of Murphy, MF) ($1,200.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Murphy Impact Fee Schedule
Water$1,637.00
  • Water Impact Fee (City of Murphy, MF) — 3/4" meter
    City of Murphy
    Water impact fee by meter size, shown at the 3/4 inch meter (1 living unit equivalent); a building on one master meter pays once by its meter size. A lot connecting to a water main the city extended also pays a pro rata charge of $4.75 per front foot (Code App. A Sec. A8.003), unless the developer built or paid for the line.
    $1,207.00
  • Water Meter Fee (City of Murphy, MF) — 3/4" meter
    City of Murphy
    City water meter fee, charged per meter; a building on one master meter pays once by its size. Tap installation is billed at the city's full cost.
    $430.00
Sewer$2,062.00
  • Wastewater Impact Fee (City of Murphy, MF) — 3/4" meter
    City of Murphy
    Wastewater impact fee by meter size, shown at the 3/4 inch meter (1 living unit equivalent); a building on one master meter pays once by its meter size. A lot connecting to a sewer main the city extended also pays a pro rata charge of $4.90 per front foot (Code App. A Sec. A8.003), unless the developer built or paid for the line.
    $1,912.00
  • Sewer Connection Fee (City of Murphy, MF) — 4" tie-in
    City of Murphy
    Sewer connection fee per tie-in; a building on one connection pays once. Tap installation is billed at the city's full cost.
    $150.00
City$1,200.00
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Murphy): $4,899.00
Sources last checked Official fee schedules:City of Murphy Collin County

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Murphy: Commercial Impact Fees

Commercial development in Murphy pays no per-square-foot impact fees, but owes $8,478.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $8,478.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Murphy) — 1" meter ($4,781.00 one-time), Water Impact Fee (City of Murphy) — 1" meter ($3,017.00 one-time) and Water Meter Fee (City of Murphy) — 1" meter ($530.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Murphy Impact Fee Schedule
Water$3,547.00 one-time
  • Water Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $193,071 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or water connection.
    $3,017.00 one-time
  • Water Meter Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water meter fee for a 1 inch meter ($430 for 3/4 inch, $1,000 for 1.5 inch, $1,200 for 2 inch; a Tru/Flo compound meter is $2,600, and meters over 2 inches are quoted). Charged in addition to the tap installation cost and the impact fees.
    $530.00 one-time
  • Water and Sewer Tap Installation (City of Murphy) — at cost
    City of Murphy
    Murphy bills water and sewer tap installation at 100% of its cost, on top of the meter fee and the sewer connection fee.
    $0.00
Sewer$4,931.00 one-time
  • Wastewater Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy wastewater impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $305,975 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or sewer connection.
    $4,781.00 one-time
  • Sewer Connection Fee (City of Murphy) — 4" tie-in
    City of Murphy
    Murphy sewer connection fee for a 4 inch tie-in ($300 for 6 inch, $500 for 8 inch), in addition to the tap installation cost and the wastewater impact fee.
    $150.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Murphy): $8,478.00 one-time (≈ $8,478.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Murphy Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Murphy: Industrial Impact Fees

Industrial development in Murphy pays no per-square-foot impact fees, but owes $8,478.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $8,478.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Murphy) — 1" meter ($4,781.00 one-time), Water Impact Fee (City of Murphy) — 1" meter ($3,017.00 one-time) and Water Meter Fee (City of Murphy) — 1" meter ($530.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Murphy Impact Fee Schedule
Water$3,547.00 one-time
  • Water Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $193,071 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or water connection.
    $3,017.00 one-time
  • Water Meter Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water meter fee for a 1 inch meter ($430 for 3/4 inch, $1,000 for 1.5 inch, $1,200 for 2 inch; a Tru/Flo compound meter is $2,600, and meters over 2 inches are quoted). Charged in addition to the tap installation cost and the impact fees.
    $530.00 one-time
  • Water and Sewer Tap Installation (City of Murphy) — at cost
    City of Murphy
    Murphy bills water and sewer tap installation at 100% of its cost, on top of the meter fee and the sewer connection fee.
    $0.00
Sewer$4,931.00 one-time
  • Wastewater Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy wastewater impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $305,975 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or sewer connection.
    $4,781.00 one-time
  • Sewer Connection Fee (City of Murphy) — 4" tie-in
    City of Murphy
    Murphy sewer connection fee for a 4 inch tie-in ($300 for 6 inch, $500 for 8 inch), in addition to the tap installation cost and the wastewater impact fee.
    $150.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Murphy): $8,478.00 one-time (≈ $8,478.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Murphy Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Murphy: Office Impact Fees

Office development in Murphy pays no per-square-foot impact fees, but owes $8,478.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $8,478.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Murphy) — 1" meter ($4,781.00 one-time), Water Impact Fee (City of Murphy) — 1" meter ($3,017.00 one-time) and Water Meter Fee (City of Murphy) — 1" meter ($530.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Murphy Impact Fee Schedule
Water$3,547.00 one-time
  • Water Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $193,071 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or water connection.
    $3,017.00 one-time
  • Water Meter Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy water meter fee for a 1 inch meter ($430 for 3/4 inch, $1,000 for 1.5 inch, $1,200 for 2 inch; a Tru/Flo compound meter is $2,600, and meters over 2 inches are quoted). Charged in addition to the tap installation cost and the impact fees.
    $530.00 one-time
  • Water and Sewer Tap Installation (City of Murphy) — at cost
    City of Murphy
    Murphy bills water and sewer tap installation at 100% of its cost, on top of the meter fee and the sewer connection fee.
    $0.00
Sewer$4,931.00 one-time
  • Wastewater Impact Fee (City of Murphy) — 1" meter
    City of Murphy
    Murphy wastewater impact fee for a 1 inch meter (2.5 living unit equivalents), effective December 6, 2023. Larger meters pay by size, up to $305,975 for an 8 inch meter. Assessed when the plat is released for recording and paid before the building permit or sewer connection.
    $4,781.00 one-time
  • Sewer Connection Fee (City of Murphy) — 4" tie-in
    City of Murphy
    Murphy sewer connection fee for a 4 inch tie-in ($300 for 6 inch, $500 for 8 inch), in addition to the tap installation cost and the wastewater impact fee.
    $150.00 one-time
City$0.00
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Murphy): $8,478.00 one-time (≈ $8,478.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Murphy Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Murphy Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

For a primer on how impact fees work, see our plain-English guide.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Murphy Impact Fee FAQs

What are the total impact fees for a single-family home in Murphy, Texas?

A new single-family home in Murphy pays $4,899.00 per unit in combined impact fees (rates sourced November 25, 2026).

How much are commercial impact fees in Murphy?

Commercial development in Murphy pays no per-square-foot impact fees, but owes $8,478.00 in one-time water and sewer connection fees (assuming a 1-inch meter).

Does Murphy charge its own impact fees?

Yes. Murphy levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Murphy. The schedule on this page shows every fee that applies to development in Murphy.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.