Farmersville Impact Fees by Project Type
Farmersville: Single-Family Impact Fees
A new single-family home in Farmersville pays at least $12,350.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Farmersville) — 3/4" meter ($3,000.00), Park Development Fee (City of Farmersville) ($2,000.00) and Water Tap Fee (City of Farmersville) — 3/4" tap ($2,000.00).
Park Land Fee in Lieu (City of Farmersville) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Farmersville Impact Fee Schedule
- Water Tap Fee (City of Farmersville) — 3/4" tap$2,000.00City of FarmersvilleWater tap fee for a 3/4 inch tap, charged in addition to the water impact fee; extraordinary costs such as boring and street repair are billed at actual cost.
- Water Impact Fee (City of Farmersville) — 3/4" meter$2,000.00City of FarmersvilleWater impact fee for a home on a 3/4 inch meter (1.0 service unit), for developments platted on or after February 3, 2025 or not requiring a plat. Larger meters pay more; a separate water tap fee also applies.
- Water Meter Service Connect Fee (City of Farmersville)$350.00City of FarmersvilleOne-time service connect fee for a new 5/8 x 3/4 inch water meter; larger new meters are priced by the city.
- Wastewater Impact Fee (City of Farmersville) — 3/4" meter$3,000.00City of FarmersvilleWastewater impact fee for a home on a 3/4 inch meter (1.0 service unit), for developments platted on or after February 3, 2025 or not requiring a plat. Larger meters pay more; a separate sewer tap fee also applies.
- Sewer Tap Fee (City of Farmersville) — 4" tap$2,000.00City of FarmersvilleSewer tap fee for a 4 inch tap, charged in addition to the wastewater impact fee; boring, where needed, adds $1,000.
- Park Development Fee (City of Farmersville)$2,000.00City of Farmersville$2,000 per new single-family home, paid before the building permit is issued (Ordinance O-2025-1215-000, adopted 12/15/2025). It is charged in addition to any parkland dedication or fee in lieu of land required at platting.
- Roadway Impact Fee (City of Farmersville) — 3/4" meter$1,000.00City of FarmersvilleRoadway impact fee for a home on a 3/4 inch meter; one citywide rate set by meter size, for developments platted on or after February 3, 2025 or not requiring a plat.
- Park Land Fee in Lieu (City of Farmersville)Requires confirmationCity of FarmersvilleCity of Farmersville requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Farmersville: Multifamily Impact Fees
A new multifamily unit in Farmersville pays at least $12,350.00 per unit in impact fees (rates sourced November 26, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Wastewater Impact Fee (City of Farmersville, MF) — 3/4" meter ($3,000.00), Water Tap Fee (City of Farmersville, MF) — 3/4" tap ($2,000.00) and Water Impact Fee (City of Farmersville, MF) — 3/4" meter ($2,000.00).
Roadway Impact Fee (City of Farmersville, MF) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Park Land Fee in Lieu (City of Farmersville, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Farmersville Impact Fee Schedule
- Water Tap Fee (City of Farmersville, MF) — 3/4" tap$2,000.00City of FarmersvilleWater tap fee by tap size, from $2,000 for a 3/4 inch tap; a building on one tap pays once.
- Water Impact Fee (City of Farmersville, MF) — 3/4" meter$2,000.00City of FarmersvilleWater impact fee is charged by meter size, from $2,000 for a 3/4 inch meter; a building on one master meter pays once at that meter's size. A separate water tap fee also applies.
- Water Meter Service Connect Fee (City of Farmersville, MF)$350.00City of FarmersvilleOne-time service connect fee for a new 5/8 x 3/4 inch water meter; larger new meters are priced by the city. A building on one meter pays once.
- Wastewater Impact Fee (City of Farmersville, MF) — 3/4" meter$3,000.00City of FarmersvilleWastewater impact fee is charged by meter size, from $3,000 for a 3/4 inch meter; a building on one master meter pays once at that meter's size. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Farmersville, MF) — 4" tap$2,000.00City of FarmersvilleSewer tap fee by tap size, from $2,000 for a 4 inch tap; a building on one tap pays once.
- Park Development Fee (City of Farmersville, MF)$2,000.00City of Farmersville$2,000 per new multifamily unit, paid before the building permit is issued (Ordinance O-2025-1215-000, adopted 12/15/2025). It is charged in addition to any parkland dedication or fee in lieu of land required at platting.
- Roadway Impact Fee (City of Farmersville, MF) — 3/4" meter$1,000.00Requires confirmationCity of FarmersvilleRoadway impact fee for multifamily is set by meter size in a citywide schedule, from $1,000 for a 3/4 inch meter.
- Park Land Fee in Lieu (City of Farmersville, MF)Requires confirmationCity of FarmersvilleCity of Farmersville requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Farmersville: Commercial Impact Fees
Commercial development in Farmersville pays no per-square-foot impact fees, but owes $16,675.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $16,675.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Farmersville) — 1" meter ($7,500.00 one-time), Water Impact Fee (City of Farmersville) — 1" meter ($5,000.00 one-time) and Water Tap Fee (City of Farmersville) — 1" tap ($2,175.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Farmersville, Commercial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Farmersville Impact Fee Schedule
- Water Impact Fee (City of Farmersville) — 1" meter$5,000.00 one-timeCity of FarmersvilleFarmersville water impact fee for a 1 inch meter (2.5 service units at $2,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Water Tap Fee (City of Farmersville) — 1" tap$2,175.00 one-timeCity of FarmersvilleFarmersville water tap fee for a 1 inch tap, paid in addition to the water impact fee. Taps and meters over 2 inches need a meter vault built to city standards and have no printed price. Boring, street and easement repairs beyond the standard tap are billed at actual cost.
- Wastewater Impact Fee (City of Farmersville) — 1" meter$7,500.00 one-timeCity of FarmersvilleFarmersville wastewater impact fee for a 1 inch meter (2.5 service units at $3,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Sewer Tap Fee (City of Farmersville) — 4" tap$2,000.00 one-timeCity of FarmersvilleFarmersville sewer tap fee for a 4 inch service line, paid in addition to the wastewater impact fee. Taps over 6 inches cost 125% of materials plus $500, and a $1,000 boring fee applies where boring is needed.
- Roadway Impact Fee (City of Farmersville, Commercial)Requires confirmationCity of FarmersvilleFarmersville's master fee schedule (Ordinance O-2026-0921-002, adopted September 21, 2026) prints roadway impact fees for single-family and multifamily homes only; no nonresidential roadway rate is published.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Farmersville: Industrial Impact Fees
Industrial development in Farmersville pays no per-square-foot impact fees, but owes $16,675.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 50,000 sq ft building, that comes to at least $16,675.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Farmersville) — 1" meter ($7,500.00 one-time), Water Impact Fee (City of Farmersville) — 1" meter ($5,000.00 one-time) and Water Tap Fee (City of Farmersville) — 1" tap ($2,175.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Farmersville, Industrial) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Farmersville Impact Fee Schedule
- Water Impact Fee (City of Farmersville) — 1" meter$5,000.00 one-timeCity of FarmersvilleFarmersville water impact fee for a 1 inch meter (2.5 service units at $2,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Water Tap Fee (City of Farmersville) — 1" tap$2,175.00 one-timeCity of FarmersvilleFarmersville water tap fee for a 1 inch tap, paid in addition to the water impact fee. Taps and meters over 2 inches need a meter vault built to city standards and have no printed price. Boring, street and easement repairs beyond the standard tap are billed at actual cost.
- Wastewater Impact Fee (City of Farmersville) — 1" meter$7,500.00 one-timeCity of FarmersvilleFarmersville wastewater impact fee for a 1 inch meter (2.5 service units at $3,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Sewer Tap Fee (City of Farmersville) — 4" tap$2,000.00 one-timeCity of FarmersvilleFarmersville sewer tap fee for a 4 inch service line, paid in addition to the wastewater impact fee. Taps over 6 inches cost 125% of materials plus $500, and a $1,000 boring fee applies where boring is needed.
- Roadway Impact Fee (City of Farmersville, Industrial)Requires confirmationCity of FarmersvilleFarmersville's master fee schedule (Ordinance O-2026-0921-002, adopted September 21, 2026) prints roadway impact fees for single-family and multifamily homes only; no nonresidential roadway rate is published.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Farmersville: Office Impact Fees
Office development in Farmersville pays no per-square-foot impact fees, but owes $16,675.00 in one-time water and sewer connection fees (rates sourced November 26, 2026).
For a 25,000 sq ft building, that comes to at least $16,675.00. The calculator below adjusts to your exact square footage.
The largest line items are Wastewater Impact Fee (City of Farmersville) — 1" meter ($7,500.00 one-time), Water Impact Fee (City of Farmersville) — 1" meter ($5,000.00 one-time) and Water Tap Fee (City of Farmersville) — 1" tap ($2,175.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Roadway Impact Fee (City of Farmersville, Office) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
View the Full Farmersville Impact Fee Schedule
- Water Impact Fee (City of Farmersville) — 1" meter$5,000.00 one-timeCity of FarmersvilleFarmersville water impact fee for a 1 inch meter (2.5 service units at $2,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Water Tap Fee (City of Farmersville) — 1" tap$2,175.00 one-timeCity of FarmersvilleFarmersville water tap fee for a 1 inch tap, paid in addition to the water impact fee. Taps and meters over 2 inches need a meter vault built to city standards and have no printed price. Boring, street and easement repairs beyond the standard tap are billed at actual cost.
- Wastewater Impact Fee (City of Farmersville) — 1" meter$7,500.00 one-timeCity of FarmersvilleFarmersville wastewater impact fee for a 1 inch meter (2.5 service units at $3,000 each), set by Ordinance O-2025-0203-000. Collected on development platted on or after February 3, 2025 and on development that needs no plat; the fee scales with meter size.
- Sewer Tap Fee (City of Farmersville) — 4" tap$2,000.00 one-timeCity of FarmersvilleFarmersville sewer tap fee for a 4 inch service line, paid in addition to the wastewater impact fee. Taps over 6 inches cost 125% of materials plus $500, and a $1,000 boring fee applies where boring is needed.
- Roadway Impact Fee (City of Farmersville, Office)Requires confirmationCity of FarmersvilleFarmersville's master fee schedule (Ordinance O-2026-0921-002, adopted September 21, 2026) prints roadway impact fees for single-family and multifamily homes only; no nonresidential roadway rate is published.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Farmersville Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Farmersville Impact Fee FAQs
What are the total impact fees for a single-family home in Farmersville, Texas?
A new single-family home in Farmersville pays at least $12,350.00 per unit in combined impact fees (rates sourced November 26, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Farmersville?
Commercial development in Farmersville pays no per-square-foot impact fees, but owes $16,675.00 in one-time water and sewer connection fees (assuming a 1-inch meter). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
Does Farmersville charge its own impact fees?
Yes. Farmersville levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Farmersville. The schedule on this page shows every fee that applies to development in Farmersville.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.