Skip to content
IMPACTFEES.ORG

Frisco, Texas Impact Fees

Frisco applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $9,416.00 per unit (rates sourced ). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Frisco Impact Fees by Project Type

Frisco: Single-Family Impact Fees

A new single-family home in Frisco pays at least $9,416.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Frisco) ($4,257.00), Wastewater Impact Fee (City of Frisco) — 1" PD meter ($2,364.00) and Water Impact Fee (City of Frisco) — 1" PD meter ($2,110.00).

Parkland Cash in Lieu of Dedication (City of Frisco) and Park Development Fee (City of Frisco) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Frisco Impact Fee Schedule
Water$2,795.00
  • Water Impact Fee (City of Frisco) — 1" PD meter
    Water impact fee per service unit at a 1 inch meter (the smallest listed), the single-family rate set at 57% of the maximum by Ordinance 2021-07-45 (July 6, 2021). Larger meters pay more.
    $2,110.00
  • Water Meter Fee (City of Frisco) — 1" meter, $835 less $150 deposit
    City of Frisco
    Residential utility meter fee for a 1 inch meter under Frisco's 2026 Public Works fee schedule (effective March 2, 2026): $835, which includes a $150 deposit, so the meter charge itself is $685. The city sets meters 2 inches and smaller. Charged in addition to the water and wastewater impact fees.
    $685.00
Sewer$2,364.00
City$4,257.00
  • Roadway Impact Fee (City of Frisco)
    Service Area A
    Roadway impact fee for a single-family detached home, $4,257 in Service Area A. This is the highest of the city's four roadway service areas (A-D range $1,935-$4,257), set at 70 percent of the maximum under Ordinance 19-04-29 and assessed by plat date. A 2025 impact fee update has been posted for public review.
    $4,257.00
  • Parkland Cash in Lieu of Dedication (City of Frisco)
    City of Frisco
    City of Frisco requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    Requires confirmation
  • Park Development Fee (City of Frisco)
    City of Frisco
    Frisco charges a park development fee on every new dwelling, on top of any cash in lieu of parkland dedication. The city calculates it at site plan or plat application from a formula in Code Section 58-25: park construction cost per resident, times 3.11 persons per single-family home, at 60 percent. The code's 2018 worked example comes to $1,661.46 per home; the amount due is set from current figures at application.
    Requires confirmation
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Frisco): $9,416.00
Sources last checked Official fee schedules:City of Frisco Collin County
Fees flagged "Requires confirmation" have no confirmed published amount. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frisco: Multifamily Impact Fees

A new multifamily unit in Frisco pays at least $9,918.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Frisco, MF) — 1" PD meter ($3,401.00), Water Impact Fee (City of Frisco, MF) — 1" PD meter ($3,036.00) and Roadway Impact Fee (City of Frisco, MF) — Mid-Rise, Service Area A ($2,696.00).

Water Meter Fee (City of Frisco, MF) — 1" meter, $1,785 less $1,000 deposit is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parkland Cash in Lieu of Dedication (City of Frisco, MF) and Park Development Fee (City of Frisco, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Frisco Impact Fee Schedule
Water$3,821.00
Sewer$3,401.00
City$2,696.00
  • Roadway Impact Fee (City of Frisco, MF) — Mid-Rise, Service Area A
    Roadway impact fee per multifamily unit, set by building height and service area (Ordinance 19-04-29). A mid-rise unit pays $2,696 in Service Area A, the highest of the city's four service areas, down to $1,226 in Service Area D; low-rise units pay $1,562 to $3,436 and high-rise units $1,003 to $2,207. The fee is assessed by plat date.
    $2,696.00
  • Parkland Cash in Lieu of Dedication (City of Frisco, MF)
    City of Frisco
    City of Frisco requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat, so a lot already platted has paid it. Dedicating land may replace it.
    Requires confirmation
  • Park Development Fee (City of Frisco, MF)
    City of Frisco
    Frisco charges a park development fee on every new dwelling, on top of any cash in lieu of parkland dedication. The city calculates it at site plan or plat application from a formula in Code Section 58-25: park construction cost per resident, times 1.97 persons per multifamily unit, at 60 percent. The code's 2018 worked example comes to $1,052.44 per unit; the amount due is set from current figures at application.
    Requires confirmation
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Frisco): $9,918.00
Sources last checked Official fee schedules:City of Frisco Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frisco: Commercial Impact Fees

Commercial development in Frisco pays $8.83 per square foot in impact fees, plus $6,437.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $447,837.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Frisco) — 1" PD meter ($3,401.00 one-time), Water Impact Fee (City of Frisco) — 1" PD meter ($3,036.00 one-time) and Roadway Impact Fee (City of Frisco, Commercial) — Service Area A ($8.83/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Frisco Impact Fee Schedule
Water$3,036.00 one-time
  • Water Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco water impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,036.00 one-time
Sewer$3,401.00 one-time
  • Wastewater Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco wastewater impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,401.00 one-time
City$8.83/sq ft
  • Roadway Impact Fee (City of Frisco, Commercial) — Service Area A
    City of Frisco
    Frisco roadway impact fee for a shopping center, per 1,000 sq ft of gross floor area, in Service Area A, the highest of 4 rate districts (B $5,034, C $5,027, D $4,013). Set by Ordinance 19-04-29 for land platted after May 2, 2019; fees are assessed by plat date. A 2025 impact fee update was posted for public review in August 2026.
    $8.83/sq ft
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Frisco): $8.83/sq ft + $6,437.00 one-time (≈ $447,837.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Frisco Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frisco: Industrial Impact Fees

Industrial development in Frisco pays $3.96 per square foot in impact fees, plus $6,437.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $204,587.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Frisco) — 1" PD meter ($3,401.00 one-time), Water Impact Fee (City of Frisco) — 1" PD meter ($3,036.00 one-time) and Roadway Impact Fee (City of Frisco, Industrial) — Service Area A ($3.96/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Frisco Impact Fee Schedule
Water$3,036.00 one-time
  • Water Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco water impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,036.00 one-time
Sewer$3,401.00 one-time
  • Wastewater Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco wastewater impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,401.00 one-time
City$3.96/sq ft
  • Roadway Impact Fee (City of Frisco, Industrial) — Service Area A
    City of Frisco
    Frisco roadway impact fee for general light industrial, per 1,000 sq ft of gross floor area, in Service Area A, the highest of 4 rate districts (B $2,259, C $2,256, D $1,801). Set by Ordinance 19-04-29 for land platted after May 2, 2019; fees are assessed by plat date. A 2025 impact fee update was posted for public review in August 2026.
    $3.96/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Frisco): $3.96/sq ft + $6,437.00 one-time (≈ $204,587.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Frisco Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frisco: Office Impact Fees

Office development in Frisco pays $8.65 per square foot in impact fees, plus $6,437.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $222,762.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Frisco) — 1" PD meter ($3,401.00 one-time), Water Impact Fee (City of Frisco) — 1" PD meter ($3,036.00 one-time) and Roadway Impact Fee (City of Frisco, Office) — Service Area A ($8.65/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Frisco Impact Fee Schedule
Water$3,036.00 one-time
  • Water Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco water impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,036.00 one-time
Sewer$3,401.00 one-time
  • Wastewater Impact Fee (City of Frisco) — 1" PD meter
    City of Frisco
    Frisco wastewater impact fee for nonresidential land uses with a 1 inch positive displacement meter, collected at 82% of the maximum fee under Ordinance 2021-07-45 (adopted July 6, 2021). Larger meters pay more per the city's schedule. A 2025 impact fee update was posted for public review in August 2026.
    $3,401.00 one-time
City$8.65/sq ft
  • Roadway Impact Fee (City of Frisco, Office) — Service Area A
    City of Frisco
    Frisco roadway impact fee for a general office building, per 1,000 sq ft of gross floor area, in Service Area A, the highest of 4 rate districts (B $4,934, C $4,927, D $3,933). Set by Ordinance 19-04-29 for land platted after May 2, 2019; fees are assessed by plat date. A 2025 impact fee update was posted for public review in August 2026.
    $8.65/sq ft
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Frisco): $8.65/sq ft + $6,437.00 one-time (≈ $222,762.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Frisco Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Frisco Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Frisco Impact Fee FAQs

What are the total impact fees for a single-family home in Frisco, Texas?

A new single-family home in Frisco pays at least $9,416.00 per unit in combined impact fees (rates sourced November 25, 2026). 2 additional fees have no published standard amounts and are not included, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Frisco?

Commercial development in Frisco pays $8.83 per square foot in impact fees, plus $6,437.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $447,837.00 for a 50,000 sq ft building.

Does Frisco charge its own impact fees?

Yes. Frisco levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Frisco. The schedule on this page shows every fee that applies to development in Frisco.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.