St. Paul Impact Fees by Project Type
St. Paul: Single-Family Impact Fees
A new single-family home in St. Paul pays at least $3,000.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee — Wylie Northeast SUD, 5/8" x 3/4" meter ($3,000.00).
Sewer Connection Fee — On-site septic is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full St. Paul Impact Fee Schedule
- Water Connection Fee — Wylie Northeast SUD, 5/8" x 3/4" meter$3,000.00Wylie Northeast Special Utility DistrictWater in St. Paul is provided by Wylie Northeast Special Utility District. Its connection fee for a standard home includes the 5/8 x 3/4 inch meter; a larger meter adds the district's cost, and in subdivisions where the developer installs the service the fee is $2,700.
- Sewer Connection Fee — On-site septicRequires confirmationProperties outside Wylie Northeast SUD's sewer service area use on-site septic systems. Inside that area, which covers parts of St. Paul, the district charges a $2,500 wastewater capacity fee plus its tap cost.
- $0.00
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Paul: Multifamily Impact Fees
A new multifamily unit in St. Paul pays at least $3,000.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (MF) — Wylie Northeast SUD, 5/8" x 3/4" meter ($3,000.00).
Sewer Connection Fee (MF) — On-site septic is set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full St. Paul Impact Fee Schedule
- Water Connection Fee (MF) — Wylie Northeast SUD, 5/8" x 3/4" meter$3,000.00Wylie Northeast Special Utility DistrictWater in St. Paul is provided by Wylie Northeast Special Utility District, charged per connection; a building on one connection pays once, plus the cost of a larger meter.
- Sewer Connection Fee (MF) — On-site septicRequires confirmationProperties outside Wylie Northeast SUD's sewer service area use on-site septic systems. Inside that area, which covers parts of St. Paul, the district charges a $2,500 wastewater capacity fee plus its tap cost per connection.
- City Impact Fee (Town of St. Paul, MF)$0.00Town of St. PaulThe town does not charge development impact fees.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Paul: Commercial Impact Fees
Commercial development in St. Paul pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
Wastewater Capacity Fee (Wylie Northeast SUD) and Water Connection Fee (Wylie Northeast SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. Paul Impact Fee Schedule
- Water Connection Fee (Wylie Northeast SUD)$3,000.00 one-timeRequires confirmationWylie Northeast SUDWater in St. Paul is provided by Wylie Northeast Special Utility District. Its water connection fee, including commercial service, is $3,000 for a 5/8 x 3/4 inch meter; a larger meter adds the district's cost of the meter, parts and installation.
- Wastewater Capacity Fee (Wylie Northeast SUD)$2,500.00 one-timeRequires confirmationWylie Northeast SUDPart of St. Paul lies in Wylie Northeast Special Utility District's sewer service area, where a commercial connection on a 4 inch line pays a $2,500 capacity fee plus the actual cost of the tap. Properties outside that area use on-site septic systems.
- City Impact Fee (Town of St. Paul, Commercial)$0.00Town of St. PaulThe Town of St. Paul does not charge development impact fees and does not run a water or sewer utility.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Paul: Industrial Impact Fees
Industrial development in St. Paul pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
Wastewater Capacity Fee (Wylie Northeast SUD) and Water Connection Fee (Wylie Northeast SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. Paul Impact Fee Schedule
- Water Connection Fee (Wylie Northeast SUD)$3,000.00 one-timeRequires confirmationWylie Northeast SUDWater in St. Paul is provided by Wylie Northeast Special Utility District. Its water connection fee, including commercial service, is $3,000 for a 5/8 x 3/4 inch meter; a larger meter adds the district's cost of the meter, parts and installation.
- Wastewater Capacity Fee (Wylie Northeast SUD)$2,500.00 one-timeRequires confirmationWylie Northeast SUDPart of St. Paul lies in Wylie Northeast Special Utility District's sewer service area, where a commercial connection on a 4 inch line pays a $2,500 capacity fee plus the actual cost of the tap. Properties outside that area use on-site septic systems.
- City Impact Fee (Town of St. Paul, Industrial)$0.00Town of St. PaulThe Town of St. Paul does not charge development impact fees and does not run a water or sewer utility.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Paul: Office Impact Fees
Office development in St. Paul pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $5,500.00. The calculator below adjusts to your exact square footage.
Wastewater Capacity Fee (Wylie Northeast SUD) and Water Connection Fee (Wylie Northeast SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
View the Full St. Paul Impact Fee Schedule
- Water Connection Fee (Wylie Northeast SUD)$3,000.00 one-timeRequires confirmationWylie Northeast SUDWater in St. Paul is provided by Wylie Northeast Special Utility District. Its water connection fee, including commercial service, is $3,000 for a 5/8 x 3/4 inch meter; a larger meter adds the district's cost of the meter, parts and installation.
- Wastewater Capacity Fee (Wylie Northeast SUD)$2,500.00 one-timeRequires confirmationWylie Northeast SUDPart of St. Paul lies in Wylie Northeast Special Utility District's sewer service area, where a commercial connection on a 4 inch line pays a $2,500 capacity fee plus the actual cost of the tap. Properties outside that area use on-site septic systems.
- City Impact Fee (Town of St. Paul, Office)$0.00Town of St. PaulThe Town of St. Paul does not charge development impact fees and does not run a water or sewer utility.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
St. Paul Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
St. Paul Impact Fee FAQs
What are the total impact fees for a single-family home in St. Paul, Texas?
A new single-family home in St. Paul pays at least $3,000.00 per unit in combined impact fees (rates sourced November 19, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in St. Paul?
Commercial development in St. Paul pays no per-square-foot impact fees, but owes $5,500.00 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does St. Paul charge its own impact fees?
Yes. St. Paul levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside St. Paul. The schedule on this page shows every fee that applies to development in St. Paul.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.