Lucas Impact Fees by Project Type
Lucas: Single-Family Impact Fees
A new single-family home in Lucas pays $18,990.28 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Lucas) — Simple meter under 2" ($13,119.00), Roadway Impact Fee (City of Lucas) ($1,421.28) and Water Tap Fee (City of Lucas) ($1,350.00).
Park Fee in Lieu of Dedication (City of Lucas) and Water Meter Fee (City of Lucas) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lucas Impact Fee Schedule
- Water Impact Fee (City of Lucas) — Simple meter under 2"$13,119.00Simple, under 2"$13,119 water impact fee per living-unit equivalent (a standard residential meter under 2 inches = 1 LUE). Larger meters scale up by LUE.
- Water Meter Fee (City of Lucas) — 1" meter$2,100.00Requires confirmationCity of LucasWater meter fee by size, $2,100 for a 1 inch meter; larger meters cost more.
- Water Tap Fee (City of Lucas)$1,350.00City of LucasWater tap fee, charged in addition to the water impact fee and meter fee; boring under a road adds $1,350 (standard) or cost plus 20%.
- Wastewater — Septic / No Impact Fee (City of Lucas)$0.00Lucas charges no wastewater impact or tap fee. Many homes use on-site septic systems.
- Roadway Impact Fee (City of Lucas)$1,421.28$1,421.28 road impact fee per single-family home (one citywide service area).
- Park Fee in Lieu of Dedication (City of Lucas)$1,000.00Requires confirmationCity of LucasSubdivisions of fewer than 35 units pay a park fee in lieu of land dedication, $1,000 per lot unless the city council sets another rate; lots in R-1 districts pay double in lieu of a sidewalk.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lucas: Multifamily Impact Fees
A new multifamily unit in Lucas pays $18,340.12 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Lucas, MF) — Simple meter under 2" ($13,119.00), Water Tap Fee (City of Lucas, MF) ($1,350.00) and Roadway Impact Fee (City of Lucas, MF) ($771.12).
Water Meter Fee (City of Lucas, MF) — 1" meter and Park Fee in Lieu of Dedication (City of Lucas, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Lucas Impact Fee Schedule
- Water Impact Fee (City of Lucas, MF) — Simple meter under 2"$13,119.00Simple, under 2"Water impact fee charged by meter size (per living-unit equivalent). A master-metered building pays from $13,119 (meter under 2") upward.
- Water Meter Fee (City of Lucas, MF) — 1" meter$2,100.00Requires confirmationCity of LucasWater meter fee by size, from $2,100 for a 1 inch meter; a building on one meter pays once.
- Water Tap Fee (City of Lucas, MF)$1,350.00City of LucasWater tap fee per tap; a building on one tap pays once.
- Wastewater — Septic / No Impact Fee (City of Lucas, MF)$0.00Lucas charges no wastewater impact or tap fee. Many homes use on-site septic systems.
- Park Fee in Lieu of Dedication (City of Lucas, MF)$1,000.00Requires confirmationCity of LucasSubdivisions of fewer than 35 units pay a park fee in lieu of land dedication, $1,000 per dwelling unit or lot unless the city council sets another rate.
- Roadway Impact Fee (City of Lucas, MF)$771.12$771.12 road impact fee per multifamily dwelling unit (one citywide service area).
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lucas: Commercial Impact Fees
Commercial development in Lucas pays $3.65 per square foot in impact fees, plus $16,569.00 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $199,017.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lucas) — Simple meter less than 2" ($13,119.00 one-time), Water Meter Installation (City of Lucas) — 1" meter ($2,100.00 one-time) and Water Tap Fee (City of Lucas) ($1,350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lucas Impact Fee Schedule
- Water Impact Fee (City of Lucas) — Simple meter less than 2"$13,119.00 one-timeSimple, less than 2"City of LucasLucas charges a water impact fee of $13,119 per living unit equivalent, set by meter type and size: every simple meter under 2 inches counts as 1 unit, and larger compound and turbine meters range from 8 to 330 units (Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- Water Meter Installation (City of Lucas) — 1" meter$2,100.00 one-timeCity of LucasLucas charges a water meter installation fee by meter size: $2,100 for a 1 inch meter, up to $8,400 for a 4 inch meter (fee schedule as amended February 5, 2026). The tap fee and any bore are charged separately.
- Water Tap Fee (City of Lucas)$1,350.00 one-timeCity of LucasLucas charges a $1,350 water tap fee. Where a bore under the road is needed, a standard bore adds $1,350 and a nonstandard bore is billed at cost plus 20%.
- Sewer Connection Fee (City of Lucas)$0.00City of LucasLucas charges no wastewater impact or connection fee. Much of the city uses on-site septic systems; customers on city sewer pay monthly wastewater rates only.
- Roadway Impact Fee (City of Lucas, Commercial)$3.65/sq ftCity of LucasLucas charges a roadway impact fee of $3,648.96 per 1,000 square feet of floor area for shopping center and general retail uses (7.24 vehicle-miles at $504 each, citywide single service area; Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lucas: Industrial Impact Fees
Industrial development in Lucas pays $0.98 per square foot in impact fees, plus $16,569.00 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $65,709.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lucas) — Simple meter less than 2" ($13,119.00 one-time), Water Meter Installation (City of Lucas) — 1" meter ($2,100.00 one-time) and Water Tap Fee (City of Lucas) ($1,350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lucas Impact Fee Schedule
- Water Impact Fee (City of Lucas) — Simple meter less than 2"$13,119.00 one-timeSimple, less than 2"City of LucasLucas charges a water impact fee of $13,119 per living unit equivalent, set by meter type and size: every simple meter under 2 inches counts as 1 unit, and larger compound and turbine meters range from 8 to 330 units (Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- Water Meter Installation (City of Lucas) — 1" meter$2,100.00 one-timeCity of LucasLucas charges a water meter installation fee by meter size: $2,100 for a 1 inch meter, up to $8,400 for a 4 inch meter (fee schedule as amended February 5, 2026). The tap fee and any bore are charged separately.
- Water Tap Fee (City of Lucas)$1,350.00 one-timeCity of LucasLucas charges a $1,350 water tap fee. Where a bore under the road is needed, a standard bore adds $1,350 and a nonstandard bore is billed at cost plus 20%.
- Sewer Connection Fee (City of Lucas)$0.00City of LucasLucas charges no wastewater impact or connection fee. Much of the city uses on-site septic systems; customers on city sewer pay monthly wastewater rates only.
- Roadway Impact Fee (City of Lucas, Industrial)$0.98/sq ftCity of LucasLucas charges a roadway impact fee of $982.80 per 1,000 square feet of floor area for general industrial uses (1.95 vehicle-miles at $504 each, citywide single service area; Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lucas: Office Impact Fees
Office development in Lucas pays $2.18 per square foot in impact fees, plus $16,569.00 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 25,000 sq ft building, that comes to about $71,001.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Lucas) — Simple meter less than 2" ($13,119.00 one-time), Water Meter Installation (City of Lucas) — 1" meter ($2,100.00 one-time) and Water Tap Fee (City of Lucas) ($1,350.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
View the Full Lucas Impact Fee Schedule
- Water Impact Fee (City of Lucas) — Simple meter less than 2"$13,119.00 one-timeSimple, less than 2"City of LucasLucas charges a water impact fee of $13,119 per living unit equivalent, set by meter type and size: every simple meter under 2 inches counts as 1 unit, and larger compound and turbine meters range from 8 to 330 units (Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- Water Meter Installation (City of Lucas) — 1" meter$2,100.00 one-timeCity of LucasLucas charges a water meter installation fee by meter size: $2,100 for a 1 inch meter, up to $8,400 for a 4 inch meter (fee schedule as amended February 5, 2026). The tap fee and any bore are charged separately.
- Water Tap Fee (City of Lucas)$1,350.00 one-timeCity of LucasLucas charges a $1,350 water tap fee. Where a bore under the road is needed, a standard bore adds $1,350 and a nonstandard bore is billed at cost plus 20%.
- Sewer Connection Fee (City of Lucas)$0.00City of LucasLucas charges no wastewater impact or connection fee. Much of the city uses on-site septic systems; customers on city sewer pay monthly wastewater rates only.
- Roadway Impact Fee (City of Lucas, Office)$2.18/sq ftCity of LucasLucas charges a roadway impact fee of $2,177.28 per 1,000 square feet of floor area for office buildings (4.32 vehicle-miles at $504 each, citywide single service area; Ordinance 2023-03-00974, adopted March 16, 2023). The fee is assessed at plat recording and collected at building permit.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Lucas Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Lucas Impact Fee FAQs
What are the total impact fees for a single-family home in Lucas, Texas?
A new single-family home in Lucas pays $18,990.28 per unit in combined impact fees (rates sourced November 20, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Lucas?
Commercial development in Lucas pays $3.65 per square foot in impact fees, plus $16,569.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $199,017.00 for a 50,000 sq ft building.
Does Lucas charge its own impact fees?
Yes. Lucas levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Lucas. The schedule on this page shows every fee that applies to development in Lucas.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.