McKinney, Texas Impact Fees

McKinney applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $16,166.00 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

McKinney Impact Fees by Project Type

McKinney: Single-Family Impact Fees

A new single-family home in McKinney pays at least $16,166.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of McKinney) — Service Area C ($4,484.00), Sewer Tap Fee (City of McKinney) — 4" tap, bore and pavement repair ($3,600.00) and Water Tap Fee (City of McKinney) — 1" tap, bore and pavement repair ($2,775.00).

Park Development Fee (City of McKinney) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parkland Dedication Fee in Lieu (City of McKinney) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full McKinney Impact Fee Schedule
Water$5,039.00
Sewer$5,243.00
  • Sewer Tap Fee (City of McKinney) — 4" tap, bore and pavement repair
    City of McKinney
    City sewer service installation for a 4 inch tap with a bore and pavement repair, the highest of three cases by where the tap is made; a tap only or a tap with pavement repair costs less. Services over 4 inches are built by the requester. Schedule effective October 1, 2025.
    $3,600.00
  • Wastewater Impact Fee (City of McKinney) — 3/4" meter
    City of McKinney
    Wastewater impact fee for a 3/4 inch meter (1 living unit equivalent) on lots platted on or after December 1, 2020; lots platted November 20, 2013 to November 30, 2020 pay the earlier schedule. Larger meters pay more.
    $1,643.00
City$5,884.00
  • Roadway Impact Fee (City of McKinney) — Service Area C
    City of McKinney
    Roadway impact fee per single-family home in Service Area C; $4,484 is the highest rate, charged in seven of 13 service areas, for lots platted on or after December 1, 2020. Other areas charge $0 to $1,682.
    $4,484.00
  • Park Development Fee (City of McKinney)
    City of McKinney
    Park development fee of $1,400 per single-family unit, paid at plat recordation, effective since 2024 under the parkland ordinance in force from October 1, 2022 ($1,000 in 2022 and 2023). Parkland dedication, or a fee in lieu based on the appraisal district's land value, applies separately. Up to half of the fee may be credited for approved private park amenities.
    $1,400.00Requires confirmation
  • Parkland Dedication Fee in Lieu (City of McKinney)
    City of McKinney
    City of McKinney requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat or at the building permit. Dedicating land may replace it.
    Requires confirmation
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (McKinney): $16,166.00
Sources last checked Official fee schedules:City of McKinney Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McKinney: Multifamily Impact Fees

A new multifamily unit in McKinney pays at least $17,003.00 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of McKinney, MF) — Service Area D ($5,121.00), Sewer Tap Fee (City of McKinney, MF) — 4" tap, bore and pavement repair ($3,600.00) and Water Tap Fee (City of McKinney, MF) — 1" tap, bore and pavement repair ($2,775.00).

Park Development Fee (City of McKinney, MF) is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

Parkland Dedication Fee in Lieu (City of McKinney, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full McKinney Impact Fee Schedule
Water$5,039.00
Sewer$5,243.00
City$6,721.00
  • Roadway Impact Fee (City of McKinney, MF) — Service Area D
    City of McKinney
    Roadway impact fee per apartment unit in Service Area D, the highest of 13 service areas, for lots platted on or after December 1, 2020; other areas charge $0 to $4,646.
    $5,121.00
  • Park Development Fee (City of McKinney, MF)
    City of McKinney
    Park development fee of $1,600 per multifamily unit, paid before building permits are issued, under the parkland ordinance in force from October 1, 2022. Parkland dedication, or a fee in lieu based on the appraisal district's land value, applies separately. Up to half of the fee may be credited for approved private park amenities.
    $1,600.00Requires confirmation
  • Parkland Dedication Fee in Lieu (City of McKinney, MF)
    City of McKinney
    City of McKinney requires parkland dedication or a payment in lieu whose amount depends on land value or is not published, so no fixed per-home amount is shown. It is paid at final plat or at the building permit. Dedicating land may replace it.
    Requires confirmation
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (McKinney): $17,003.00
Sources last checked Official fee schedules:City of McKinney Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McKinney: Commercial Impact Fees

Commercial development in McKinney pays $5.02 per square foot in impact fees, plus $9,318.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $260,368.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of McKinney) — 1" meter ($2,929.00 one-time), Wastewater Impact Fee (City of McKinney) — 1" meter ($2,744.00 one-time) and Roadway Impact Fee (City of McKinney, Commercial) — Service Area C ($5.02/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of McKinney) — 4" tap only, Water Tap Fee (City of McKinney) — 1" tap only, and Water Meter Set Fee (City of McKinney) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full McKinney Impact Fee Schedule
Water$4,944.00 one-time
  • Water Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney water impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier, generally lower schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,754) to 12 inch ($321,560). An impact fee update was under way in 2026.
    $2,929.00 one-time
  • Water Tap Fee (City of McKinney) — 1" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 1 inch water service tap on an existing main, without pavement repair. Taps needing pavement repair cost $1,950, or $2,775 with a bore. Services the developer installs with new mains do not pay it.
    $1,450.00 one-timeRequires confirmation
  • Water Meter Set Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney meter set fee for a 1 inch water meter inside city limits, charged in addition to the water impact fee. Outside city limits the fee doubles. Meters of 3 inches and larger pay a $300 registration fee instead.
    $565.00 one-timeRequires confirmation
Sewer$4,374.00 one-time
  • Wastewater Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney wastewater impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,643) to 12 inch ($301,302). An impact fee update was under way in 2026.
    $2,744.00 one-time
  • Sewer Tap Fee (City of McKinney) — 4" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 4 inch sewer tap, without pavement repair ($1,980 with pavement repair, $3,600 with a bore). Sewer services larger than 4 inches connect at a manhole at the developer's cost.
    $1,630.00 one-timeRequires confirmation
City$5.02/sq ft
  • Roadway Impact Fee (City of McKinney, Commercial) — Service Area C
    City of McKinney
    McKinney roadway impact fee for a shopping center, per 1,000 sq ft of gross leasable area, in Service Area C, the highest of 13 rate districts (B $1,989, D $4,437, E $4,874, G $2,588, H $2,537, I $3,747, J $2,439, K $4,236, L $3,872; A, F and M $0). Rate for land with a final plat recorded on or after December 1, 2020; fees are assessed by plat date. An impact fee update was under way in 2026.
    $5.02/sq ft
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (McKinney): $5.02/sq ft + $9,318.00 one-time (≈ $260,368.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of McKinney Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McKinney: Industrial Impact Fees

Industrial development in McKinney pays $1.89 per square foot in impact fees, plus $9,318.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $103,818.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of McKinney) — 1" meter ($2,929.00 one-time), Wastewater Impact Fee (City of McKinney) — 1" meter ($2,744.00 one-time) and Roadway Impact Fee (City of McKinney, Industrial) — Service Area E ($1.89/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of McKinney) — 4" tap only, Water Tap Fee (City of McKinney) — 1" tap only, and Water Meter Set Fee (City of McKinney) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full McKinney Impact Fee Schedule
Water$4,944.00 one-time
  • Water Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney water impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier, generally lower schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,754) to 12 inch ($321,560). An impact fee update was under way in 2026.
    $2,929.00 one-time
  • Water Tap Fee (City of McKinney) — 1" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 1 inch water service tap on an existing main, without pavement repair. Taps needing pavement repair cost $1,950, or $2,775 with a bore. Services the developer installs with new mains do not pay it.
    $1,450.00 one-timeRequires confirmation
  • Water Meter Set Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney meter set fee for a 1 inch water meter inside city limits, charged in addition to the water impact fee. Outside city limits the fee doubles. Meters of 3 inches and larger pay a $300 registration fee instead.
    $565.00 one-timeRequires confirmation
Sewer$4,374.00 one-time
  • Wastewater Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney wastewater impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,643) to 12 inch ($301,302). An impact fee update was under way in 2026.
    $2,744.00 one-time
  • Sewer Tap Fee (City of McKinney) — 4" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 4 inch sewer tap, without pavement repair ($1,980 with pavement repair, $3,600 with a bore). Sewer services larger than 4 inches connect at a manhole at the developer's cost.
    $1,630.00 one-timeRequires confirmation
City$1.89/sq ft
  • Roadway Impact Fee (City of McKinney, Industrial) — Service Area E
    City of McKinney
    McKinney roadway impact fee for general light industrial use, per 1,000 sq ft of gross floor area, in Service Area E, the highest of 13 rate districts (B $547, C $1,879, D $1,736, G $1,355, H $1,057, I $1,428, J $922, K $1,642, L $1,597; A, F and M $0). Rate for land with a final plat recorded on or after December 1, 2020; fees are assessed by plat date. An impact fee update was under way in 2026.
    $1.89/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (McKinney): $1.89/sq ft + $9,318.00 one-time (≈ $103,818.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of McKinney Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McKinney: Office Impact Fees

Office development in McKinney pays $3.86 per square foot in impact fees, plus $9,318.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $105,768.00. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of McKinney) — 1" meter ($2,929.00 one-time), Wastewater Impact Fee (City of McKinney) — 1" meter ($2,744.00 one-time) and Roadway Impact Fee (City of McKinney, Office) — Service Area E ($3.86/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Sewer Tap Fee (City of McKinney) — 4" tap only, Water Tap Fee (City of McKinney) — 1" tap only, and Water Meter Set Fee (City of McKinney) — 1" meter are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

View the Full McKinney Impact Fee Schedule
Water$4,944.00 one-time
  • Water Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney water impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier, generally lower schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,754) to 12 inch ($321,560). An impact fee update was under way in 2026.
    $2,929.00 one-time
  • Water Tap Fee (City of McKinney) — 1" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 1 inch water service tap on an existing main, without pavement repair. Taps needing pavement repair cost $1,950, or $2,775 with a bore. Services the developer installs with new mains do not pay it.
    $1,450.00 one-timeRequires confirmation
  • Water Meter Set Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney meter set fee for a 1 inch water meter inside city limits, charged in addition to the water impact fee. Outside city limits the fee doubles. Meters of 3 inches and larger pay a $300 registration fee instead.
    $565.00 one-timeRequires confirmation
Sewer$4,374.00 one-time
  • Wastewater Impact Fee (City of McKinney) — 1" meter
    City of McKinney
    McKinney wastewater impact fee for a 1 inch meter, for land with a final plat recorded on or after December 1, 2020 (older plats pay earlier schedules). Collected at building permit or utility connection, whichever comes first. Charged by meter size from 3/4 inch ($1,643) to 12 inch ($301,302). An impact fee update was under way in 2026.
    $2,744.00 one-time
  • Sewer Tap Fee (City of McKinney) — 4" tap only
    City of McKinney
    McKinney charges this fee when the city installs a 4 inch sewer tap, without pavement repair ($1,980 with pavement repair, $3,600 with a bore). Sewer services larger than 4 inches connect at a manhole at the developer's cost.
    $1,630.00 one-timeRequires confirmation
City$3.86/sq ft
  • Roadway Impact Fee (City of McKinney, Office) — Service Area E
    City of McKinney
    McKinney roadway impact fee for a general office building, per 1,000 sq ft of gross floor area, in Service Area E, the highest of 13 rate districts (B $1,207, C $2,850, D $3,770, G $2,145, H $1,931, I $2,302, J $2,394, K $3,469, L $2,370; A, F and M $0). Rate for land with a final plat recorded on or after December 1, 2020; fees are assessed by plat date. An impact fee update was under way in 2026.
    $3.86/sq ft
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (McKinney): $3.86/sq ft + $9,318.00 one-time (≈ $105,768.00 at 25,000 sq ft)
Sources last checked Official fee schedules:City of McKinney Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

McKinney Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

McKinney Impact Fee FAQs

What are the total impact fees for a single-family home in McKinney, Texas?

A new single-family home in McKinney pays at least $16,166.00 per unit in combined impact fees (rates sourced November 25, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in McKinney?

Commercial development in McKinney pays $5.02 per square foot in impact fees, plus $9,318.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $260,368.00 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does McKinney charge its own impact fees?

Yes. McKinney levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside McKinney. The schedule on this page shows every fee that applies to development in McKinney.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.