Celina, Texas Impact Fees

Celina applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays $39,286.25 per unit (rates sourced ). The full breakdown is below.

Celina Impact Fees by Project Type

Celina: Single-Family Impact Fees

A new single-family home in Celina pays $39,286.25 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Roadway Impact Fee (City of Celina) — Service Areas 1-5, 4.60 veh-mi × $3,036.88/veh-mi ($13,969.65), Sewer Connection Fee — City of Celina, 1" meter ($10,233 impact + $1,500 tap) ($11,733.00) and Water Connection Fee — City of Celina, 1" meter ($6,815 impact + $2,175 access + $480 meter) ($9,470.00).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Celina Impact Fee Schedule
Water$9,470.00
  • Water Connection Fee — City of Celina, 1" meter ($6,815 impact + $2,175 access + $480 meter)
    City of Celina
    Effective 8/12/2025 (Ordinance 2025-71) for the impact fee; access and meter fees from the city fee schedule. Total for a home on the city water system by meter size: 1 inch $9,470 ($6,815 impact, $2,175 access, $480 meter), 1-1/2 inch $12,723, 2 inch $21,482. A 1 inch meter is the minimum size the city sets for a new connection. A $1,200 boring fee applies when the tap needs a bore under a street. Parts of Celina are in Mustang Special Utility District's water service area, which charges its own connection fees instead.
    $9,470.00
Sewer$11,733.00
  • Sewer Connection Fee — City of Celina, 1" meter ($10,233 impact + $1,500 tap)
    City of Celina
    Effective 8/12/2025 (Ordinance 2025-71) for the impact fee, plus the city's $1,500 sewer tap fee for a 4 inch service. Total for a home on city sewer by meter size: 1 inch $11,733 ($10,233 impact plus the tap), 1-1/2 inch $14,291, 2 inch $27,082. A 1 inch meter is the minimum size the city sets for a new connection. A $1,000 boring fee applies when needed. No wastewater impact fee on an irrigation-only meter. A small part of Celina is in Mustang Special Utility District's sewer service area, which charges its own connection fee instead.
    $11,733.00
City$18,083.25
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Celina): $39,286.25
Sources last checked Official fee schedules:City of Celina Collin County

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Celina: Multifamily Impact Fees

A new multifamily unit in Celina pays $28,503.44 per unit in impact fees (rates sourced November 25, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Sewer Connection Fee (MF) — City of Celina, 1" meter ($10,233 impact + $1,500 tap) ($11,733.00), Water Connection Fee (MF) — City of Celina, 1" meter ($6,815 impact + $2,175 access + $480 meter) ($9,470.00) and Roadway Impact Fee (City of Celina, MF) — Mid-Rise, Service Areas 1-5, 1.91 veh-mi × $3,036.88/veh-mi ($5,800.44).

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Celina Impact Fee Schedule
Water$9,470.00
  • Water Connection Fee (MF) — City of Celina, 1" meter ($6,815 impact + $2,175 access + $480 meter)
    City of Celina
    Effective 8/12/2025 (Ordinance 2025-71) for the impact fee; access and meter fees from the city fee schedule. Charged per water meter: 1 inch $9,470 ($6,815 impact, $2,175 access, $480 meter), 1-1/2 inch $12,723, 2 inch $21,482. A building on one master meter pays once at that meter's size; impact fees alone on meters of 3 inches and up run from $54,520 (3 inch compound) to $391,862 (10 inch). Parts of Celina are in Mustang Special Utility District's water service area, which charges its own connection fees instead.
    $9,470.00
Sewer$11,733.00
  • Sewer Connection Fee (MF) — City of Celina, 1" meter ($10,233 impact + $1,500 tap)
    City of Celina
    Effective 8/12/2025 (Ordinance 2025-71) for the impact fee, plus the city's $1,500 sewer tap fee for a 4 inch service. Charged per water meter and connection: 1 inch $11,733, 1-1/2 inch $14,291, 2 inch $27,082. A building on one master meter and connection pays once; impact fees alone on meters of 3 inches and up run from $81,864 (3 inch compound) to $588,397 (10 inch). A small part of Celina is in Mustang Special Utility District's sewer service area, which charges its own connection fee instead.
    $11,733.00
City$7,300.44
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Celina): $28,503.44
Sources last checked Official fee schedules:City of Celina Collin County

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Celina: Commercial Impact Fees

Commercial development in Celina pays $29.12 per square foot in impact fees, plus $21,203.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $1,477,387.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter ($10,233.00 one-time), Water Impact Fee (City of Celina) — 1" displacement or E&U meter ($6,815.00 one-time) and Water Access Fee (City of Celina) — 1" meter ($2,175.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Celina Impact Fee Schedule
Water$9,470.00 one-time
  • Water Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina water impact fee of $6,815 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $6,815.00 one-time
  • Water Access Fee (City of Celina) — 1" meter
    City of Celina
    Celina water access (connection) fee: $2,175 for a 1 inch service, $2,475 for 1-1/2 or 2 inch. A $1,200 boring fee applies where boring is needed, and the city bills extraordinary costs at actual cost. Taps over 2 inches are installed by the contractor.
    $2,175.00 one-time
  • Water Meter Fee (City of Celina) — 1" meter
    City of Celina
    Celina water meter fee: $480 for a 1 inch meter (minimum size), $1,730 for 1-1/2 inch, $1,970 for 2 inch. Meters over 2 inches are supplied and installed by the builder in a vault. Charged with the water access fee and the impact fee.
    $480.00 one-time
Sewer$11,733.00 one-time
  • Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina wastewater impact fee of $10,233 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $10,233.00 one-time
  • Sewer Tap Fee (City of Celina)
    City of Celina
    Celina sewer tap fee for a 4 inch tap. A $1,000 boring fee applies where boring is needed; taps over 4 inches are installed by the contractor.
    $1,500.00 one-time
City$29.12/sq ft
  • Roadway Impact Fee (City of Celina, Commercial) — Service Areas 1-5, 9.59 veh-mi × $3,036.88/veh-mi
    City of Celina
    Celina roadway impact fee: 9.59 vehicle-miles per 1,000 sq ft (Shopping Plaza (40-150k)) times the collection rate per vehicle-mile, which differs by service area: $3,036.88 in areas 1 to 5, $1,930.59 in area 6, $1,561.82 in area 7. This is the highest of 3 rate tiers across 7 service areas. Adopted by Ordinance 2025-12 (March 11, 2025); assessed at final plat and collected at building permit.
    $29.12/sq ft
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Celina): $29.12/sq ft + $21,203.00 one-time (≈ $1,477,387.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Celina Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Celina: Industrial Impact Fees

Industrial development in Celina pays $9.87 per square foot in impact fees, plus $21,203.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 50,000 sq ft building, that comes to about $514,696.00. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter ($10,233.00 one-time), Water Impact Fee (City of Celina) — 1" displacement or E&U meter ($6,815.00 one-time) and Water Access Fee (City of Celina) — 1" meter ($2,175.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Celina Impact Fee Schedule
Water$9,470.00 one-time
  • Water Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina water impact fee of $6,815 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $6,815.00 one-time
  • Water Access Fee (City of Celina) — 1" meter
    City of Celina
    Celina water access (connection) fee: $2,175 for a 1 inch service, $2,475 for 1-1/2 or 2 inch. A $1,200 boring fee applies where boring is needed, and the city bills extraordinary costs at actual cost. Taps over 2 inches are installed by the contractor.
    $2,175.00 one-time
  • Water Meter Fee (City of Celina) — 1" meter
    City of Celina
    Celina water meter fee: $480 for a 1 inch meter (minimum size), $1,730 for 1-1/2 inch, $1,970 for 2 inch. Meters over 2 inches are supplied and installed by the builder in a vault. Charged with the water access fee and the impact fee.
    $480.00 one-time
Sewer$11,733.00 one-time
  • Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina wastewater impact fee of $10,233 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $10,233.00 one-time
  • Sewer Tap Fee (City of Celina)
    City of Celina
    Celina sewer tap fee for a 4 inch tap. A $1,000 boring fee applies where boring is needed; taps over 4 inches are installed by the contractor.
    $1,500.00 one-time
City$9.87/sq ft
  • Roadway Impact Fee (City of Celina, Industrial) — Service Areas 1-5, 3.25 veh-mi × $3,036.88/veh-mi
    City of Celina
    Celina roadway impact fee: 3.25 vehicle-miles per 1,000 sq ft (General Light Industrial) times the collection rate per vehicle-mile, which differs by service area: $3,036.88 in areas 1 to 5, $1,930.59 in area 6, $1,561.82 in area 7. This is the highest of 3 rate tiers across 7 service areas. Adopted by Ordinance 2025-12 (March 11, 2025); assessed at final plat and collected at building permit.
    $9.87/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Celina): $9.87/sq ft + $21,203.00 one-time (≈ $514,696.00 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Celina Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Celina: Office Impact Fees

Office development in Celina pays $21.87 per square foot in impact fees, plus $21,203.00 in one-time water and sewer connection fees (rates sourced November 25, 2026).

For a 25,000 sq ft building, that comes to about $567,841.50. The calculator below adjusts to your exact square footage.

The largest line items are Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter ($10,233.00 one-time), Water Impact Fee (City of Celina) — 1" displacement or E&U meter ($6,815.00 one-time) and Water Access Fee (City of Celina) — 1" meter ($2,175.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

View the Full Celina Impact Fee Schedule
Water$9,470.00 one-time
  • Water Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina water impact fee of $6,815 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $6,815.00 one-time
  • Water Access Fee (City of Celina) — 1" meter
    City of Celina
    Celina water access (connection) fee: $2,175 for a 1 inch service, $2,475 for 1-1/2 or 2 inch. A $1,200 boring fee applies where boring is needed, and the city bills extraordinary costs at actual cost. Taps over 2 inches are installed by the contractor.
    $2,175.00 one-time
  • Water Meter Fee (City of Celina) — 1" meter
    City of Celina
    Celina water meter fee: $480 for a 1 inch meter (minimum size), $1,730 for 1-1/2 inch, $1,970 for 2 inch. Meters over 2 inches are supplied and installed by the builder in a vault. Charged with the water access fee and the impact fee.
    $480.00 one-time
Sewer$11,733.00 one-time
  • Wastewater Impact Fee (City of Celina) — 1" displacement or E&U meter
    City of Celina
    Celina wastewater impact fee of $10,233 per service unit (1 inch meter = 1.0 service unit) times the service units of the meter installed. Adopted by Ordinance 2025-71 (August 12, 2025); the collection rate equals the maximum allowed. Celina standardized nonresidential meters to the 2 inch compound meter (4.0 service units). Charged in addition to meter and tap fees.
    $10,233.00 one-time
  • Sewer Tap Fee (City of Celina)
    City of Celina
    Celina sewer tap fee for a 4 inch tap. A $1,000 boring fee applies where boring is needed; taps over 4 inches are installed by the contractor.
    $1,500.00 one-time
City$21.87/sq ft
  • Roadway Impact Fee (City of Celina, Office) — Service Areas 1-5, 7.2 veh-mi × $3,036.88/veh-mi
    City of Celina
    Celina roadway impact fee: 7.2 vehicle-miles per 1,000 sq ft (General Office Building) times the collection rate per vehicle-mile, which differs by service area: $3,036.88 in areas 1 to 5, $1,930.59 in area 6, $1,561.82 in area 7. This is the highest of 3 rate tiers across 7 service areas. Adopted by Ordinance 2025-12 (March 11, 2025); assessed at final plat and collected at building permit.
    $21.87/sq ft
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Celina): $21.87/sq ft + $21,203.00 one-time (≈ $567,841.50 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Celina Collin County
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Celina Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Celina Impact Fee FAQs

What are the total impact fees for a single-family home in Celina, Texas?

A new single-family home in Celina pays $39,286.25 per unit in combined impact fees (rates sourced November 25, 2026).

How much are commercial impact fees in Celina?

Commercial development in Celina pays $29.12 per square foot in impact fees, plus $21,203.00 in one-time water and sewer connection fees (assuming a 1-inch meter), about $1,477,387.00 for a 50,000 sq ft building.

Does Celina charge its own impact fees?

Yes. Celina levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Celina. The schedule on this page shows every fee that applies to development in Celina.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.