Princeton, Texas Impact Fees

Princeton applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $10,115.60 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Princeton Impact Fees by Project Type

Princeton: Single-Family Impact Fees

A new single-family home in Princeton pays at least $10,115.60 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Princeton) — 5/8" x 3/4" PD, 1 SU × $1,963/SU ($1,963.00).

Wastewater Tap Installation (City of Princeton), Water Connection Fee — City of Princeton, 5/8" x 3/4" PD (1 SU × $3,026/SU impact + $300 tap + $175 meter), and Roadway Impact Fee (City of Princeton) — 4.60 veh-mi × $946/veh-mi are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Park Development Fee (City of Princeton) and Park Improvement Fee (City of Princeton) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Princeton Impact Fee Schedule
Water$3,501.00
Sewer$2,263.00
City$4,351.60
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Princeton): $10,115.60
Sources last checked Official fee schedules:City of Princeton Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Princeton: Multifamily Impact Fees

A new multifamily unit in Princeton pays at least $7,570.86 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Wastewater Impact Fee (City of Princeton, MF) — 5/8" x 3/4" PD, 1 SU × $1,963/SU ($1,963.00).

Water Connection Fee (MF) — City of Princeton, 5/8" x 3/4" PD (1 SU × $3,026/SU impact + $300 tap + $175 meter), Wastewater Tap Installation (City of Princeton, MF), and Roadway Impact Fee (City of Princeton, MF) — Mid-Rise, 1.91 veh-mi × $946/veh-mi are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Park Development Fee (City of Princeton, MF) and Park Improvement Fee (City of Princeton, MF) are set by the city and have no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Princeton Impact Fee Schedule
Water$3,501.00
Sewer$2,263.00
City$1,806.86
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Princeton): $7,570.86
Sources last checked Official fee schedules:City of Princeton Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Princeton: Commercial Impact Fees

Commercial development in Princeton pays $8.25 per square foot in impact fees, plus $13,272.50 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 50,000 sq ft building, that comes to about $425,728.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU ($7,565.00 one-time), Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU ($4,907.50 one-time) and Wastewater Tap Installation Fee (City of Princeton) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Princeton, Commercial) — 8.72 veh-mi × $946/veh-mi is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Princeton Impact Fee Schedule
Water$8,065.00 one-time
  • Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU
    City of Princeton
    Princeton water impact fee for a 1 inch meter: 2.5 service units at $3,026 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date. Charged in addition to tap and meter installation fees.
    $7,565.00 one-time
  • Water Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton water tap installation fee for a 3/4 or 1 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
  • Water Meter Installation Fee (City of Princeton) — 1" meter
    City of Princeton
    Princeton water meter installation fee for a city-installed 1 inch meter ($175 for 5/8 x 3/4 or 3/4 inch); the meter itself is $50 plus its cost.
    $200.00 one-time
Sewer$5,207.50 one-time
  • Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU
    City of Princeton
    Princeton wastewater impact fee for a 1 inch meter: 2.5 service units at $1,963 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date.
    $4,907.50 one-time
  • Wastewater Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton wastewater tap installation fee for a 4 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
City$8.25/sq ft
  • Roadway Impact Fee (City of Princeton, Commercial) — 8.72 veh-mi × $946/veh-mi
    City of Princeton
    Princeton roadway impact fee for shopping plaza space (40,000 to 150,000 sq ft), per 1,000 sq ft of gross floor area: 8.72 vehicle-miles at $946 per vehicle-mile, adopted October 24, 2022 at 100% of the maximum fee, one citywide service area. Other retail uses carry their own rates. The city began an impact fee update in 2026.
    $8.25/sq ftRequires confirmation
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Princeton): $8.25/sq ft + $13,272.50 one-time (≈ $425,728.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Princeton Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Princeton: Industrial Impact Fees

Industrial development in Princeton pays $3.08 per square foot in impact fees, plus $13,272.50 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 50,000 sq ft building, that comes to about $167,470.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU ($7,565.00 one-time), Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU ($4,907.50 one-time) and Wastewater Tap Installation Fee (City of Princeton) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Princeton, Industrial) — 3.26 veh-mi × $946/veh-mi is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Princeton Impact Fee Schedule
Water$8,065.00 one-time
  • Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU
    City of Princeton
    Princeton water impact fee for a 1 inch meter: 2.5 service units at $3,026 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date. Charged in addition to tap and meter installation fees.
    $7,565.00 one-time
  • Water Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton water tap installation fee for a 3/4 or 1 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
  • Water Meter Installation Fee (City of Princeton) — 1" meter
    City of Princeton
    Princeton water meter installation fee for a city-installed 1 inch meter ($175 for 5/8 x 3/4 or 3/4 inch); the meter itself is $50 plus its cost.
    $200.00 one-time
Sewer$5,207.50 one-time
  • Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU
    City of Princeton
    Princeton wastewater impact fee for a 1 inch meter: 2.5 service units at $1,963 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date.
    $4,907.50 one-time
  • Wastewater Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton wastewater tap installation fee for a 4 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
City$3.08/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Princeton): $3.08/sq ft + $13,272.50 one-time (≈ $167,470.50 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Princeton Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Princeton: Office Impact Fees

Office development in Princeton pays $8.17 per square foot in impact fees, plus $13,272.50 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 25,000 sq ft building, that comes to about $217,608.50. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU ($7,565.00 one-time), Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU ($4,907.50 one-time) and Wastewater Tap Installation Fee (City of Princeton) ($300.00 one-time).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Roadway Impact Fee (City of Princeton, Office) — 8.64 veh-mi × $946/veh-mi is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Princeton Impact Fee Schedule
Water$8,065.00 one-time
  • Water Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $3,026/SU
    City of Princeton
    Princeton water impact fee for a 1 inch meter: 2.5 service units at $3,026 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date. Charged in addition to tap and meter installation fees.
    $7,565.00 one-time
  • Water Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton water tap installation fee for a 3/4 or 1 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
  • Water Meter Installation Fee (City of Princeton) — 1" meter
    City of Princeton
    Princeton water meter installation fee for a city-installed 1 inch meter ($175 for 5/8 x 3/4 or 3/4 inch); the meter itself is $50 plus its cost.
    $200.00 one-time
Sewer$5,207.50 one-time
  • Wastewater Impact Fee (City of Princeton) — 1" PD, 2.5 SU × $1,963/SU
    City of Princeton
    Princeton wastewater impact fee for a 1 inch meter: 2.5 service units at $1,963 per unit, adopted October 24, 2022 for land platted after that date. Larger meters pay by service units, up to 350 units for a 10 inch turbine. Land platted earlier pays the rate for its plat date.
    $4,907.50 one-time
  • Wastewater Tap Installation Fee (City of Princeton)
    City of Princeton
    Princeton wastewater tap installation fee for a 4 inch tap, plus the cost of materials and labor; larger services are installed by the developer to city standards.
    $300.00 one-time
City$8.17/sq ft
  • Roadway Impact Fee (City of Princeton, Office) — 8.64 veh-mi × $946/veh-mi
    City of Princeton
    Princeton roadway impact fee for a general office building, per 1,000 sq ft of gross floor area: 8.64 vehicle-miles at $946 per vehicle-mile, adopted October 24, 2022 at 100% of the maximum fee, one citywide service area. The city began an impact fee update in 2026.
    $8.17/sq ftRequires confirmation
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Princeton): $8.17/sq ft + $13,272.50 one-time (≈ $217,608.50 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Princeton Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Princeton Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

Brush up on impact fee basics before you budget your next project.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Princeton Impact Fee FAQs

What are the total impact fees for a single-family home in Princeton, Texas?

A new single-family home in Princeton pays at least $10,115.60 per unit in combined impact fees (rates sourced November 20, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Princeton?

Commercial development in Princeton pays $8.25 per square foot in impact fees, plus $13,272.50 in one-time water and sewer connection fees (assuming a 1-inch meter), about $425,728.50 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Princeton charge its own impact fees?

Yes. Princeton levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Princeton. The schedule on this page shows every fee that applies to development in Princeton.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.