Nevada Impact Fees by Project Type
Nevada: Single-Family Impact Fees
A new single-family home in Nevada pays $6,791.40 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Nevada SUD) ($3,200.00).
Roadway and Drainage Impact Fee (City of Nevada) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Nevada Impact Fee Schedule
- Water Connection Fee (Nevada SUD)$3,200.00Nevada Special Utility DistrictWater service in Nevada is provided by Nevada Special Utility District, not the city. Its standard connection fee includes the tap, service line and meter; road bores and other extraordinary costs are extra.
- Wastewater — Septic / OSSF (City of Nevada)$0.00The city does not run a sewer system or charge a sewer fee. Most lots use on-site septic systems permitted by Collin County; some new subdivisions are served by a privately permitted wastewater plant instead.
- Roadway and Drainage Impact Fee (City of Nevada) — 3/4" meter$3,591.40Requires confirmationCity of NevadaNevada charges a combined streets and drainage impact fee, adopted December 2022, by water meter size: 3/4 inch $3,591.40 (one service unit), 1 inch $5,997.64, 1-1/2 inch $11,959.37, 2 inch $19,142.17, 3 inch $35,914.02, 4 inch $59,868.68, 6 inch $119,701.44. The fee does not vary by land use and applies inside city limits only. The city began reviewing it in August 2025.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nevada: Multifamily Impact Fees
A new multifamily unit in Nevada pays $6,791.40 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Connection Fee (Nevada SUD, MF) ($3,200.00).
Roadway and Drainage Impact Fee (City of Nevada, MF) — 3/4" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Nevada Impact Fee Schedule
- Water Connection Fee (Nevada SUD, MF)$3,200.00Nevada Special Utility DistrictNevada Special Utility District charges $3,200 per connection; apartments can be individually metered on request. A building on one master meter pays once, plus the cost of the larger meter.
- Wastewater — Septic / OSSF (City of Nevada, MF)$0.00The city does not run a sewer system or charge a sewer fee. Most lots use on-site septic systems; some new subdivisions are served by a privately permitted wastewater plant instead.
- Roadway and Drainage Impact Fee (City of Nevada, MF) — 3/4" meter$3,591.40Requires confirmationCity of NevadaNevada charges a combined streets and drainage impact fee, adopted December 2022, by water meter size: 3/4 inch $3,591.40 (one service unit), 1 inch $5,997.64, 1-1/2 inch $11,959.37, 2 inch $19,142.17, 3 inch $35,914.02, 4 inch $59,868.68, 6 inch $119,701.44. The fee does not vary by land use and applies inside city limits only. The city began reviewing it in August 2025. Charged per meter, so a building on one meter pays once by its meter size.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nevada: Commercial Impact Fees
Commercial development in Nevada pays no per-square-foot impact fees, but owes $9,197.64 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $9,197.64. The calculator below adjusts to your exact square footage.
Roadway and Drainage Impact Fee (City of Nevada, Commercial) — 1" meter and Water Connection Fee (Nevada SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Nevada Impact Fee Schedule
- Water Connection Fee (Nevada SUD)$3,200.00 one-timeRequires confirmationNevada SUDWater in Nevada is provided by Nevada Special Utility District. Its connection fee is $3,200 per connection including tap, service line and meter; commercial service and larger meters add the cost of the larger meter.
- Sewer Connection Fee (City of Nevada)$0.00City of NevadaNevada has no city sewer system and charges no sewer connection fee; most properties use on-site septic systems. A few new developments near the city are served by privately permitted wastewater plants, which set their own charges.
- Roadway and Drainage Impact Fee (City of Nevada, Commercial) — 1" meter$5,997.64 one-timeRequires confirmationCity of NevadaNevada charges a combined streets and drainage impact fee, adopted December 2022, by water meter size: 3/4 inch $3,591.40 (one service unit), 1 inch $5,997.64, 1-1/2 inch $11,959.37, 2 inch $19,142.17, 3 inch $35,914.02, 4 inch $59,868.68, 6 inch $119,701.44. The fee does not vary by land use and applies inside city limits only. The city began reviewing it in August 2025.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nevada: Industrial Impact Fees
Industrial development in Nevada pays no per-square-foot impact fees, but owes $9,197.64 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $9,197.64. The calculator below adjusts to your exact square footage.
Roadway and Drainage Impact Fee (City of Nevada, Industrial) — 1" meter and Water Connection Fee (Nevada SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Nevada Impact Fee Schedule
- Water Connection Fee (Nevada SUD)$3,200.00 one-timeRequires confirmationNevada SUDWater in Nevada is provided by Nevada Special Utility District. Its connection fee is $3,200 per connection including tap, service line and meter; commercial service and larger meters add the cost of the larger meter.
- Sewer Connection Fee (City of Nevada)$0.00City of NevadaNevada has no city sewer system and charges no sewer connection fee; most properties use on-site septic systems. A few new developments near the city are served by privately permitted wastewater plants, which set their own charges.
- Roadway and Drainage Impact Fee (City of Nevada, Industrial) — 1" meter$5,997.64 one-timeRequires confirmationCity of NevadaNevada charges a combined streets and drainage impact fee, adopted December 2022, by water meter size: 3/4 inch $3,591.40 (one service unit), 1 inch $5,997.64, 1-1/2 inch $11,959.37, 2 inch $19,142.17, 3 inch $35,914.02, 4 inch $59,868.68, 6 inch $119,701.44. The fee does not vary by land use and applies inside city limits only. The city began reviewing it in August 2025.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nevada: Office Impact Fees
Office development in Nevada pays no per-square-foot impact fees, but owes $9,197.64 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $9,197.64. The calculator below adjusts to your exact square footage.
Roadway and Drainage Impact Fee (City of Nevada, Office) — 1" meter and Water Connection Fee (Nevada SUD) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Some fees are tiered by use or building size; amounts reflect the representative tier noted in the schedule below.
View the Full Nevada Impact Fee Schedule
- Water Connection Fee (Nevada SUD)$3,200.00 one-timeRequires confirmationNevada SUDWater in Nevada is provided by Nevada Special Utility District. Its connection fee is $3,200 per connection including tap, service line and meter; commercial service and larger meters add the cost of the larger meter.
- Sewer Connection Fee (City of Nevada)$0.00City of NevadaNevada has no city sewer system and charges no sewer connection fee; most properties use on-site septic systems. A few new developments near the city are served by privately permitted wastewater plants, which set their own charges.
- Roadway and Drainage Impact Fee (City of Nevada, Office) — 1" meter$5,997.64 one-timeRequires confirmationCity of NevadaNevada charges a combined streets and drainage impact fee, adopted December 2022, by water meter size: 3/4 inch $3,591.40 (one service unit), 1 inch $5,997.64, 1-1/2 inch $11,959.37, 2 inch $19,142.17, 3 inch $35,914.02, 4 inch $59,868.68, 6 inch $119,701.44. The fee does not vary by land use and applies inside city limits only. The city began reviewing it in August 2025.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Nevada Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
For a primer on how impact fees work, see our plain-English guide.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Nevada Impact Fee FAQs
What are the total impact fees for a single-family home in Nevada, Texas?
A new single-family home in Nevada pays $6,791.40 per unit in combined impact fees (rates sourced November 19, 2026). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
How much are commercial impact fees in Nevada?
Commercial development in Nevada pays no per-square-foot impact fees, but owes $9,197.64 in one-time water and sewer connection fees. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Nevada charge its own impact fees?
Yes. Nevada levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Nevada. The schedule on this page shows every fee that applies to development in Nevada.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.