Melissa applies its own fee schedule. Collin County does not currently add county-level impact fees inside city limits. A new single-family home pays at least $19,286.74 per unit (rates sourced ). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting. The full breakdown is below.

Melissa Impact Fees by Project Type

Melissa: Single-Family Impact Fees

A new single-family home in Melissa pays at least $19,286.74 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Melissa) — 5/8" x 3/4" PD meter ($2,843.00), Wastewater Impact Fee (City of Melissa) — 3/4" PD meter ($714.12) and Water Meter and Equipment Fee (City of Melissa) — 0.75" and less meter ($320.81).

Roadway Impact Fee (City of Melissa) — Service Area 1, 4.67 veh-mi × $2,443/veh-mi and Park Development Fee (City of Melissa) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Sewer Tap Fee (City of Melissa) and Water Tap Fee (City of Melissa) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Melissa Impact Fee Schedule
Water$3,163.81
Sewer$714.12
  • Wastewater Impact Fee (City of Melissa) — 3/4" PD meter
    City of Melissa
    Wastewater impact fee for a home at the smallest listed meter (3/4 inch, 1.00 service unit), charged at 100% of the 2025 maximum, for plats approved after October 1, 2025. Larger meters pay more.
    $714.12
  • Sewer Tap Fee (City of Melissa)
    City of Melissa
    Melissa's fee schedule charges a sewer tap fee in addition to the meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
    Requires confirmation
City$15,408.81
County$0.00
  • County Impact Fee (Collin County)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Melissa): $19,286.74
Sources last checked Official fee schedules:City of Melissa Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Melissa: Multifamily Impact Fees

A new multifamily unit in Melissa pays at least $12,962.63 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.

The largest line items are Water Impact Fee (City of Melissa, MF) — 5/8" x 3/4" PD meter ($2,843.00), Wastewater Impact Fee (City of Melissa, MF) — 3/4" PD meter ($714.12) and Water Meter and Equipment Fee (City of Melissa, MF) — 0.75" and less meter ($320.81).

Roadway Impact Fee (City of Melissa, MF) — Service Area 1, 2.9 veh-mi × $2,443/veh-mi and Park Development Fee (City of Melissa, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.

Water Tap Fee (City of Melissa, MF) and Sewer Tap Fee (City of Melissa, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.

Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.

View the Full Melissa Impact Fee Schedule
Water$3,163.81
Sewer$714.12
  • Wastewater Impact Fee (City of Melissa, MF) — 3/4" PD meter
    City of Melissa
    Wastewater impact fee is charged by meter size, from $714.12 at the smallest listed meter (3/4 inch) at 100% of the 2025 maximum; a building on one master meter pays once at that meter's size.
    $714.12
  • Sewer Tap Fee (City of Melissa, MF)
    City of Melissa
    Melissa's fee schedule charges a sewer tap fee in addition to the meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
    Requires confirmation
City$9,084.70
County$0.00
  • County Impact Fee (Collin County, MF)
    Collin County
    Collin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Melissa): $12,962.63
Sources last checked Official fee schedules:City of Melissa Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Melissa: Commercial Impact Fees

Commercial development in Melissa pays $17.57 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 50,000 sq ft building, that comes to about $887,402.85. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Commercial) — Service Area 2, 5.19 veh-mi × $3,386/veh-mi ($17.57/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Melissa Impact Fee Schedule
Water$7,543.27 one-time
  • Water Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
    $7,107.00 one-time
  • Water Meter and Equipment Fee (City of Melissa) — 1" meter
    City of Melissa
    Melissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
    $436.27 one-timeRequires confirmation
Sewer$1,192.58 one-time
  • Wastewater Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
    $1,192.58 one-time
City$17.57/sq ft
  • Roadway Impact Fee (City of Melissa, Commercial) — Service Area 2, 5.19 veh-mi × $3,386/veh-mi
    City of Melissa
    Melissa roadway impact fee for a shopping center, per 1,000 sq ft of gross floor area, in Service Area 2, the higher of 2 rate districts (Service Area 1: $12,679.17). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee of $3,386 per vehicle-mile; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
    $17.57/sq ft
County$0.00
  • County Impact Fee (Collin County, Commercial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Melissa): $17.57/sq ft + $8,735.85 one-time (≈ $887,402.85 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Melissa Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Melissa: Industrial Impact Fees

Industrial development in Melissa pays $11.07 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 50,000 sq ft building, that comes to about $562,075.35. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Industrial) — Service Area 1, 4.53 veh-mi × $2,443/veh-mi ($11.07/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Melissa Impact Fee Schedule
Water$7,543.27 one-time
  • Water Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
    $7,107.00 one-time
  • Water Meter and Equipment Fee (City of Melissa) — 1" meter
    City of Melissa
    Melissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
    $436.27 one-timeRequires confirmation
Sewer$1,192.58 one-time
  • Wastewater Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
    $1,192.58 one-time
City$11.07/sq ft
  • Roadway Impact Fee (City of Melissa, Industrial) — Service Area 1, 4.53 veh-mi × $2,443/veh-mi
    City of Melissa
    Melissa roadway impact fee for general light industrial use, per 1,000 sq ft of gross floor area, in Service Area 1, the higher of 2 rate districts (Service Area 2: $10,869.06). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
    $11.07/sq ft
County$0.00
  • County Impact Fee (Collin County, Industrial)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Melissa): $11.07/sq ft + $8,735.85 one-time (≈ $562,075.35 at 50,000 sq ft)
Sources last checked Official fee schedules:City of Melissa Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Melissa: Office Impact Fees

Office development in Melissa pays $17.00 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).

For a 25,000 sq ft building, that comes to about $433,817.85. The calculator below adjusts to your exact square footage.

The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Office) — Service Area 1, 6.96 veh-mi × $2,443/veh-mi ($17.00/sq ft).

Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.

Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.

View the Full Melissa Impact Fee Schedule
Water$7,543.27 one-time
  • Water Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
    $7,107.00 one-time
  • Water Meter and Equipment Fee (City of Melissa) — 1" meter
    City of Melissa
    Melissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
    $436.27 one-timeRequires confirmation
Sewer$1,192.58 one-time
  • Wastewater Impact Fee (City of Melissa) — 1" PD meter
    City of Melissa
    Melissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
    $1,192.58 one-time
City$17.00/sq ft
  • Roadway Impact Fee (City of Melissa, Office) — Service Area 1, 6.96 veh-mi × $2,443/veh-mi
    City of Melissa
    Melissa roadway impact fee for a general office building, per 1,000 sq ft of gross floor area, in Service Area 1, the higher of 2 rate districts (Service Area 2: $16,692.98). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
    $17.00/sq ft
County$0.00
  • County Impact Fee (Collin County, Office)
    Collin County
    Collin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
    $0.00
Total (Melissa): $17.00/sq ft + $8,735.85 one-time (≈ $433,817.85 at 25,000 sq ft)
Sources last checked Official fee schedules:City of Melissa Collin County
Amounts flagged "Requires confirmation" are the last published figures, included in the totals. Confirm them with the jurisdiction or utility before budgeting.
Water/sewer connection fees assume a 1-inch meter; larger services pay more.

Where in Collin County Are You Building?

Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.

Melissa Impact Fee Calculator

Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.

Location

Select a location to begin

Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.

Water & Sewer
Transportation
Parks
Schools
Fire & Police
General

How Impact Fees Work in Texas

Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.

Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).

For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.

A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.

If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.

Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.

Melissa Impact Fee FAQs

What are the total impact fees for a single-family home in Melissa, Texas?

A new single-family home in Melissa pays at least $19,286.74 per unit in combined impact fees (rates sourced November 20, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.

How much are commercial impact fees in Melissa?

Commercial development in Melissa pays $17.57 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (assuming a 1-inch meter), about $887,402.85 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.

Does Melissa charge its own impact fees?

Yes. Melissa levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Melissa. The schedule on this page shows every fee that applies to development in Melissa.

Can a Texas impact fee increase at any time?

No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.

Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.

Compare unincorporated rates and every other city on the Collin County impact fees page.

Missing a jurisdiction, or want to sponsor one?

Request coverage for a city or county, ask about sponsoring its page, or report an issue. We typically reply within one business day.