Melissa Impact Fees by Project Type
Melissa: Single-Family Impact Fees
A new single-family home in Melissa pays at least $19,286.74 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Melissa) — 5/8" x 3/4" PD meter ($2,843.00), Wastewater Impact Fee (City of Melissa) — 3/4" PD meter ($714.12) and Water Meter and Equipment Fee (City of Melissa) — 0.75" and less meter ($320.81).
Roadway Impact Fee (City of Melissa) — Service Area 1, 4.67 veh-mi × $2,443/veh-mi and Park Development Fee (City of Melissa) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Sewer Tap Fee (City of Melissa) and Water Tap Fee (City of Melissa) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Melissa Impact Fee Schedule
- Water Impact Fee (City of Melissa) — 5/8" x 3/4" PD meter$2,843.00City of MelissaWater impact fee for a home on a 5/8 x 3/4 inch meter (0.67 service units), charged at 100% of the 2025 maximum, for plats approved after October 1, 2025. Larger meters pay more.
- Water Meter and Equipment Fee (City of Melissa) — 0.75" and less meter$320.81City of MelissaOne-time water meter and equipment fee for a new 0.75 inch or smaller meter, charged in addition to impact fees.
- Water Tap Fee (City of Melissa)Requires confirmationCity of MelissaMelissa's fee schedule charges a water tap fee in addition to the water meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
- Wastewater Impact Fee (City of Melissa) — 3/4" PD meter$714.12City of MelissaWastewater impact fee for a home at the smallest listed meter (3/4 inch, 1.00 service unit), charged at 100% of the 2025 maximum, for plats approved after October 1, 2025. Larger meters pay more.
- Sewer Tap Fee (City of Melissa)Requires confirmationCity of MelissaMelissa's fee schedule charges a sewer tap fee in addition to the meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
- Roadway Impact Fee (City of Melissa) — Service Area 1, 4.67 veh-mi × $2,443/veh-mi$11,408.81Requires confirmationCity of MelissaRoadway impact fee in Service Area 1, the highest of 2 service areas: 4.67 vehicle-miles per home at $2,443 each, at 100% of the 2025 maximum, for plats approved after October 1, 2025.
- Park Development Fee (City of Melissa)$4,000.00Requires confirmationCity of MelissaMelissa collects a park development fee on new homes; city financial reports show $4,000 per permit.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melissa: Multifamily Impact Fees
A new multifamily unit in Melissa pays at least $12,962.63 per unit in impact fees (rates sourced November 20, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Melissa, MF) — 5/8" x 3/4" PD meter ($2,843.00), Wastewater Impact Fee (City of Melissa, MF) — 3/4" PD meter ($714.12) and Water Meter and Equipment Fee (City of Melissa, MF) — 0.75" and less meter ($320.81).
Roadway Impact Fee (City of Melissa, MF) — Service Area 1, 2.9 veh-mi × $2,443/veh-mi and Park Development Fee (City of Melissa, MF) are shown at the last published amount but have not been confirmed with the jurisdiction; they are included in the totals here. Verify before budgeting.
Water Tap Fee (City of Melissa, MF) and Sewer Tap Fee (City of Melissa, MF) are set by the utility and not published online. Contact the levying jurisdiction or utility to verify before budgeting; they are not included as dollar figures here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Melissa Impact Fee Schedule
- Water Impact Fee (City of Melissa, MF) — 5/8" x 3/4" PD meter$2,843.00City of MelissaWater impact fee is charged by meter size, from $2,843 for a 5/8 x 3/4 inch meter at 100% of the 2025 maximum; a building on one master meter pays once at that meter's size.
- Water Meter and Equipment Fee (City of Melissa, MF) — 0.75" and less meter$320.81City of MelissaOne-time water meter and equipment fee per new meter, from $320.81 for a 0.75 inch or smaller meter, charged in addition to impact fees; a building on one meter pays once.
- Water Tap Fee (City of Melissa, MF)Requires confirmationCity of MelissaMelissa's fee schedule charges a water tap fee in addition to the water meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
- Wastewater Impact Fee (City of Melissa, MF) — 3/4" PD meter$714.12City of MelissaWastewater impact fee is charged by meter size, from $714.12 at the smallest listed meter (3/4 inch) at 100% of the 2025 maximum; a building on one master meter pays once at that meter's size.
- Sewer Tap Fee (City of Melissa, MF)Requires confirmationCity of MelissaMelissa's fee schedule charges a sewer tap fee in addition to the meter and equipment fee and the impact fees; the city does not post the tap fee amount on its rates page, so no amount is shown here.
- Roadway Impact Fee (City of Melissa, MF) — Service Area 1, 2.9 veh-mi × $2,443/veh-mi$7,084.70Requires confirmationCity of MelissaRoadway impact fee in Service Area 1, the highest of 2 service areas: 2.9 vehicle-miles per apartment at $2,443 each, at 100% of the 2025 maximum.
- Park Development Fee (City of Melissa, MF)$2,000.00Requires confirmationCity of MelissaMelissa collects a park development fee on new multifamily units; city financial reports show $2,000 per unit.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melissa: Commercial Impact Fees
Commercial development in Melissa pays $17.57 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $887,402.85. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Commercial) — Service Area 2, 5.19 veh-mi × $3,386/veh-mi ($17.57/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Melissa Impact Fee Schedule
- Water Impact Fee (City of Melissa) — 1" PD meter$7,107.00 one-timeCity of MelissaMelissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
- Water Meter and Equipment Fee (City of Melissa) — 1" meter$436.27 one-timeRequires confirmationCity of MelissaMelissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
- Wastewater Impact Fee (City of Melissa) — 1" PD meter$1,192.58 one-timeCity of MelissaMelissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
- Roadway Impact Fee (City of Melissa, Commercial) — Service Area 2, 5.19 veh-mi × $3,386/veh-mi$17.57/sq ftCity of MelissaMelissa roadway impact fee for a shopping center, per 1,000 sq ft of gross floor area, in Service Area 2, the higher of 2 rate districts (Service Area 1: $12,679.17). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee of $3,386 per vehicle-mile; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melissa: Industrial Impact Fees
Industrial development in Melissa pays $11.07 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 50,000 sq ft building, that comes to about $562,075.35. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Industrial) — Service Area 1, 4.53 veh-mi × $2,443/veh-mi ($11.07/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Melissa Impact Fee Schedule
- Water Impact Fee (City of Melissa) — 1" PD meter$7,107.00 one-timeCity of MelissaMelissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
- Water Meter and Equipment Fee (City of Melissa) — 1" meter$436.27 one-timeRequires confirmationCity of MelissaMelissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
- Wastewater Impact Fee (City of Melissa) — 1" PD meter$1,192.58 one-timeCity of MelissaMelissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
- Roadway Impact Fee (City of Melissa, Industrial) — Service Area 1, 4.53 veh-mi × $2,443/veh-mi$11.07/sq ftCity of MelissaMelissa roadway impact fee for general light industrial use, per 1,000 sq ft of gross floor area, in Service Area 1, the higher of 2 rate districts (Service Area 2: $10,869.06). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melissa: Office Impact Fees
Office development in Melissa pays $17.00 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (rates sourced November 20, 2026).
For a 25,000 sq ft building, that comes to about $433,817.85. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Melissa) — 1" PD meter ($7,107.00 one-time), Wastewater Impact Fee (City of Melissa) — 1" PD meter ($1,192.58 one-time) and Roadway Impact Fee (City of Melissa, Office) — Service Area 1, 6.96 veh-mi × $2,443/veh-mi ($17.00/sq ft).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Meter and Equipment Fee (City of Melissa) — 1" meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Melissa Impact Fee Schedule
- Water Impact Fee (City of Melissa) — 1" PD meter$7,107.00 one-timeCity of MelissaMelissa water impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $2,843 (5/8 x 3/4 inch) to $995,032 (10 inch turbine).
- Water Meter and Equipment Fee (City of Melissa) — 1" meter$436.27 one-timeRequires confirmationCity of MelissaMelissa water meter and equipment fee for a 1 inch meter, charged on new water service in addition to tap and impact fees. Meters larger than 2 inches are priced by the city at cost.
- Wastewater Impact Fee (City of Melissa) — 1" PD meter$1,192.58 one-timeCity of MelissaMelissa wastewater impact fee for a 1 inch positive displacement meter, from the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026), charged at 100% of the maximum fee. Assessed at final plat recordation; plats approved by October 1, 2025 keep the earlier fee. Charged by meter size and type, from $714.12 (3/4 inch) to $166,624.96 (10 inch turbine).
- Roadway Impact Fee (City of Melissa, Office) — Service Area 1, 6.96 veh-mi × $2,443/veh-mi$17.00/sq ftCity of MelissaMelissa roadway impact fee for a general office building, per 1,000 sq ft of gross floor area, in Service Area 1, the higher of 2 rate districts (Service Area 2: $16,692.98). Set by the 2025 impact fee ordinance (effective September 1, 2025, implemented by March 1, 2026) at 100% of the maximum fee; assessed at final plat recordation, and plats approved by October 1, 2025 keep the earlier rates.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Melissa Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
If you're still asking what are impact fees, start with our guide to the definition, common categories, and legal basis.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Melissa Impact Fee FAQs
What are the total impact fees for a single-family home in Melissa, Texas?
A new single-family home in Melissa pays at least $19,286.74 per unit in combined impact fees (rates sourced November 20, 2026). This figure includes amounts that have not been confirmed and excludes fees with no published standard amount, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Melissa?
Commercial development in Melissa pays $17.57 per square foot in impact fees, plus $8,735.85 in one-time water and sewer connection fees (assuming a 1-inch meter), about $887,402.85 for a 50,000 sq ft building. This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Melissa charge its own impact fees?
Yes. Melissa levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Melissa. The schedule on this page shows every fee that applies to development in Melissa.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.