Blue Ridge Impact Fees by Project Type
Blue Ridge: Single-Family Impact Fees
A new single-family home in Blue Ridge pays at least $11,400.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Blue Ridge) — 5/8" x 3/4" meter ($4,195.00), Wastewater Impact Fee (City of Blue Ridge) — 5/8" x 3/4" meter ($3,205.00) and Water Tap Fee (City of Blue Ridge) — 3/4" line ($2,000.00).
City Impact / Parkland Fee (City of Blue Ridge) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blue Ridge Impact Fee Schedule
- Water Impact Fee (City of Blue Ridge) — 5/8" x 3/4" meter$4,195.00Water impact fee of $4,195 per living unit equivalent, collected at 50% of the maximum; a home on a 5/8 x 3/4 inch meter is 1.0 LUE and larger meters pay more. A separate water tap fee also applies.
- Water Tap Fee (City of Blue Ridge) — 3/4" line$2,000.00City of Blue RidgeWater tap fee for a 3/4 inch line, charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Blue Ridge) — 5/8" x 3/4" meter$3,205.00Wastewater impact fee of $3,205 per living unit equivalent, collected at 50% of the maximum; a home on a 5/8 x 3/4 inch meter is 1.0 LUE and larger meters pay more. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Blue Ridge) — Standard$2,000.00City of Blue RidgeSewer tap fee, charged in addition to the wastewater impact fee; $3,000 where the tap is deeper than 10 feet.
- City Impact / Parkland Fee (City of Blue Ridge)Requires confirmationBlue Ridge levies no roadway impact fee; its water and wastewater impact fees and tap fees are listed separately.
- County Impact Fee (Collin County)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blue Ridge: Multifamily Impact Fees
A new multifamily unit in Blue Ridge pays at least $11,400.00 per unit in impact fees (rates sourced November 19, 2026). Every line item is levied at the municipal or utility level.
The largest line items are Water Impact Fee (City of Blue Ridge, MF) — 5/8" x 3/4" meter ($4,195.00), Wastewater Impact Fee (City of Blue Ridge, MF) — 5/8" x 3/4" meter ($3,205.00) and Water Tap Fee (City of Blue Ridge, MF) — 3/4" line ($2,000.00).
City Impact / Parkland Fee (City of Blue Ridge, MF) is set by the city and has no published standard rate. Contact the levying jurisdiction or utility to verify before budgeting; it is not included as a dollar figure here.
Some fees are tiered by unit size or building type; amounts reflect the representative tier noted in the schedule below.
View the Full Blue Ridge Impact Fee Schedule
- Water Impact Fee (City of Blue Ridge, MF) — 5/8" x 3/4" meter$4,195.00Water impact fee of $4,195 per living unit equivalent at 50% of the maximum, charged by meter size; a building on one master meter pays once at that meter's size. A separate water tap fee also applies.
- Water Tap Fee (City of Blue Ridge, MF) — 3/4" line$2,000.00City of Blue RidgeWater tap fee by line size, from $2,000 for a 3/4 inch line; a building on one tap pays once.
- Wastewater Impact Fee (City of Blue Ridge, MF) — 5/8" x 3/4" meter$3,205.00Wastewater impact fee of $3,205 per living unit equivalent at 50% of the maximum, charged by meter size; a building on one master meter pays once at that meter's size. A separate sewer tap fee also applies.
- Sewer Tap Fee (City of Blue Ridge, MF) — Standard$2,000.00City of Blue RidgeSewer tap fee per tap, $3,000 where deeper than 10 feet; a building on one tap pays once.
- City Impact / Parkland Fee (City of Blue Ridge, MF)Requires confirmationBlue Ridge levies no roadway impact fee; its water and wastewater impact fees and tap fees are listed separately.
- County Impact Fee (Collin County, MF)$0.00Collin CountyCollin County does not charge impact fees on residential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blue Ridge: Commercial Impact Fees
Commercial development in Blue Ridge pays no per-square-foot impact fees, but owes $22,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $22,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Blue Ridge) — 1" simple meter ($10,487.00 one-time), Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter ($8,013.00 one-time) and Sewer Tap Fee (City of Blue Ridge) — Standard ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Blue Ridge) — 3/4" line meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Blue Ridge Impact Fee Schedule
- Water Impact Fee (City of Blue Ridge) — 1" simple meter$10,487.00 one-timeCity of Blue RidgeBlue Ridge water impact fee of $4,195 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Water Tap Fee (City of Blue Ridge) — 3/4" line meter$2,000.00 one-timeRequires confirmationCity of Blue RidgeBlue Ridge water tap fee, by water line size: $2,000 for a 3/4 inch line, $2,300 for a 1-1/2 to 2 inch line, $2,500 for a line over 2 inches. The schedule prints no separate 1 inch line price. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter$8,013.00 one-timeCity of Blue RidgeBlue Ridge wastewater impact fee of $3,205 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Sewer Tap Fee (City of Blue Ridge) — Standard$2,000.00 one-timeCity of Blue RidgeBlue Ridge sewer tap fee: $2,000, or $3,000 where the tap is deeper than 10 feet. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Blue Ridge, Commercial)$0.00City of Blue RidgeBlue Ridge charges no roadway, park or other city impact fee on nonresidential development. Its impact fees cover water and wastewater only.
- County Impact Fee (Collin County, Commercial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blue Ridge: Industrial Impact Fees
Industrial development in Blue Ridge pays no per-square-foot impact fees, but owes $22,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 50,000 sq ft building, that comes to about $22,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Blue Ridge) — 1" simple meter ($10,487.00 one-time), Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter ($8,013.00 one-time) and Sewer Tap Fee (City of Blue Ridge) — Standard ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Blue Ridge) — 3/4" line meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Blue Ridge Impact Fee Schedule
- Water Impact Fee (City of Blue Ridge) — 1" simple meter$10,487.00 one-timeCity of Blue RidgeBlue Ridge water impact fee of $4,195 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Water Tap Fee (City of Blue Ridge) — 3/4" line meter$2,000.00 one-timeRequires confirmationCity of Blue RidgeBlue Ridge water tap fee, by water line size: $2,000 for a 3/4 inch line, $2,300 for a 1-1/2 to 2 inch line, $2,500 for a line over 2 inches. The schedule prints no separate 1 inch line price. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter$8,013.00 one-timeCity of Blue RidgeBlue Ridge wastewater impact fee of $3,205 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Sewer Tap Fee (City of Blue Ridge) — Standard$2,000.00 one-timeCity of Blue RidgeBlue Ridge sewer tap fee: $2,000, or $3,000 where the tap is deeper than 10 feet. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Blue Ridge, Industrial)$0.00City of Blue RidgeBlue Ridge charges no roadway, park or other city impact fee on nonresidential development. Its impact fees cover water and wastewater only.
- County Impact Fee (Collin County, Industrial)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 50,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blue Ridge: Office Impact Fees
Office development in Blue Ridge pays no per-square-foot impact fees, but owes $22,500.00 in one-time water and sewer connection fees (rates sourced November 19, 2026).
For a 25,000 sq ft building, that comes to about $22,500.00. The calculator below adjusts to your exact square footage.
The largest line items are Water Impact Fee (City of Blue Ridge) — 1" simple meter ($10,487.00 one-time), Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter ($8,013.00 one-time) and Sewer Tap Fee (City of Blue Ridge) — Standard ($2,000.00 one-time).
Water and sewer connection fees assume a 1-inch meter; larger services pay more. See the meter-size tiers in the source schedules.
Water Tap Fee (City of Blue Ridge) — 3/4" line meter is shown at the last published amount but has not been confirmed with the jurisdiction; it is included in the totals here. Verify before budgeting.
View the Full Blue Ridge Impact Fee Schedule
- Water Impact Fee (City of Blue Ridge) — 1" simple meter$10,487.00 one-timeCity of Blue RidgeBlue Ridge water impact fee of $4,195 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Water Tap Fee (City of Blue Ridge) — 3/4" line meter$2,000.00 one-timeRequires confirmationCity of Blue RidgeBlue Ridge water tap fee, by water line size: $2,000 for a 3/4 inch line, $2,300 for a 1-1/2 to 2 inch line, $2,500 for a line over 2 inches. The schedule prints no separate 1 inch line price. Charged in addition to the water impact fee.
- Wastewater Impact Fee (City of Blue Ridge) — 1" simple meter$8,013.00 one-timeCity of Blue RidgeBlue Ridge wastewater impact fee of $3,205 per living unit equivalent (LUE), set at 50% of the maximum, multiplied by the LUE rating of the meter installed; a 1 inch simple meter is 2.5 LUE. Charged inside the city and its extraterritorial jurisdiction, in addition to the tap fee.
- Sewer Tap Fee (City of Blue Ridge) — Standard$2,000.00 one-timeCity of Blue RidgeBlue Ridge sewer tap fee: $2,000, or $3,000 where the tap is deeper than 10 feet. Charged in addition to the wastewater impact fee.
- City Impact Fee (City of Blue Ridge, Office)$0.00City of Blue RidgeBlue Ridge charges no roadway, park or other city impact fee on nonresidential development. Its impact fees cover water and wastewater only.
- County Impact Fee (Collin County, Office)$0.00Collin CountyCollin County does not charge impact fees on nonresidential development. Texas counties may levy impact fees only for drainage, and only in or next to counties of 3.3 million or more residents.
Where in Collin County Are You Building?
Each jurisdiction applies its own fee schedule. Pick yours. Totals shown are for a 25,000 sq ft building, including water/sewer fees (one-time connection fees assume a 1-inch meter). * = one-time water/sewer connection charges only; no per-sq-ft impact fee schedule sourced for that jurisdiction. = one or more fees are unconfirmed or have no published amount; the figure shown may not be the complete cost.
Blue Ridge Impact Fee Calculator
Estimate impact fees for your project. Set to single-family. Drop a pin or search an address for site-specific fees.
Location
Select a location to begin
Once you select an address or drop a pin, we'll identify the responsible city and county and generate a fee breakdown.
How Impact Fees Work in Texas
Texas cities, and certain special districts and authorities, assess impact fees under Chapter 395 of the Local Government Code and, with narrow exceptions, may charge one only by following it. A fee rests on adopted land use assumptions and a capital improvements plan, and imposing one takes the votes of two-thirds of the governing body's members.
Impact fees may fund only water supply, treatment and distribution; wastewater collection and treatment; storm water, drainage and flood control; and roadway facilities. Parks, schools, police and fire facilities are not on the chapter's list. The chapter does not treat park land dedication, or a payment in its place, as an impact fee, so a city can require that separately. The fee per service unit is capped at the plan's growth-related cost, less a required credit, divided by the projected service units. Counties generally cannot charge impact fees: the chapter gives that authority only to counties of 3.3 million or more people and the counties bordering them, and only for storm water, drainage and flood control. Since September 2025 a city also may not charge an impact fee where an office, retail or warehouse building at least five years old is converted to multifamily or mixed-use residential use (at least 65 percent of the building and of each usable floor), unless the land was already subject to an impact fee before the conversion's building permit was filed (Section 218.204).
For land platted after a fee is adopted, the fee is assessed no later than when the plat is recorded, which fixes the most that can be charged per service unit. Where water and wastewater capacity is available, it is generally collected when the building permit is issued, or when a water or wastewater meter connection is applied for on land outside city limits or where the entity charging the fee issues no building permits. A fee not spent as the chapter allows within 10 years of payment must generally be refunded with interest, and the land use assumptions and capital improvements plan are updated at least every five years unless the governing body formally determines that no update is needed.
A city may charge water, wastewater and drainage impact fees in its extraterritorial jurisdiction as well as inside its limits, but roadway impact fees stop at the city limits. Where a utility district or another provider supplies water or sewer instead of the city, its charges are separate from the city's, so the total can differ between a city, its neighbors and the unincorporated land around it.
Brush up on impact fee basics before you budget your next project.
Summary current as of November 2026. This is an editorial summary, not legal advice; see the official statute text and our terms of use.
Blue Ridge Impact Fee FAQs
What are the total impact fees for a single-family home in Blue Ridge, Texas?
A new single-family home in Blue Ridge pays at least $11,400.00 per unit in combined impact fees (rates sourced November 19, 2026). One additional fee has no published standard amount and is not included, so the full cost may be higher; verify before budgeting.
How much are commercial impact fees in Blue Ridge?
Commercial development in Blue Ridge pays no per-square-foot impact fees, but owes $22,500.00 in one-time water and sewer connection fees (assuming a 1-inch meter). This figure includes amounts that have not been confirmed with the jurisdiction; verify before budgeting.
Does Blue Ridge charge its own impact fees?
Yes. Blue Ridge levies its own municipal impact or utility fees. Collin County does not currently add county-level impact fees inside Blue Ridge. The schedule on this page shows every fee that applies to development in Blue Ridge.
Can a Texas impact fee increase at any time?
No. Under Section 395.0515 of the Local Government Code, added in 2025, a city or district may not increase an impact fee for three years from the later of the date the fee was adopted or last increased, although it may phase in collection up to the adopted maximum over no more than ten years. An increase also needs an independent financial audit and a public hearing on its results first (Section 395.059), and the measure approving it cannot be adopted as an emergency measure (Section 395.057). Once a fee is assessed on a tract, it cannot be raised for that tract unless the number of service units increases (Section 395.017). Charges set by a separate water or sewer provider may follow different rules.
Fee amounts on this page are compiled from official published schedules and are provided for planning purposes only. Rates change, and project specifics (unit size, meter size, location within special districts) can alter what applies. Always verify current fees with the jurisdiction and utility before relying on them.
Compare unincorporated rates and every other city on the Collin County impact fees page.